1962 Bush was joined in Zapata Off-Shore by Robert Gow. By 1963, Zapata Off-Shore had four operational oil-drilling rigs-Scorpion (from 1956, the first oil-drilling jackup rig ever built), Vinegaroon (from 1957), Sidewinder, and (in the Persian Gulf)