Open in TheBrain

2014 IBM Expects Nanotube Transistor Computer Chips Ready Soon After 2020

<p>Jul 06, 2014 11:13 AM</p>

<p>

Intel latest is 14 nm xsistor;</p>

<p>

IBM wants CNTs soon after 2020.</p>

<p>

silicon runs out of steam at 5 nm, hen nothing but NTs &nbsp;says &nbsp;Wilfried Haensch;</p>

<p>

1998 first CNT xsistor; &nbsp;now IBM commits to commercialize.</p>

<p>

ITRS report says 5nm node due in 2019.</p>

<p>

IBM &nbsp;recently built chips with 10K NT xsistor per chip.</p>

<p>

have done sim of chip with billions.</p>

<p>

microprocessor should be 5X as fast with same power.</p>

<p>

IBM design: &nbsp;6 NTs in parallel makes one xsistor.</p>

<p>

each NT is 1.4 nm wide and 30 nm long and spaced 8 nm apart.</p>

<p>

30 nm = 10 nm on electrodes at each end and 10 nm in middle;</p>

<p>

A third trode runs underneath tubes to switch them on/ off.</p>

<p>

use compounds to position them then strip them away.</p>

<p>

use chemical filters to get right size of rubes. &nbsp;use charge to separate semiconducting ones.</p>

<p>

Stanford created simple NT computer... how to speed it up.</p>

<p>

Hannon says if not ready by 2020 window could close.</p>

<p>

Silicon-based spintronics &nbsp;main other candidate.</p>

<p>

&nbsp;</p>

<p>

&nbsp;</p>

<p>

&nbsp;</p>

<p>

&nbsp;</p>

<p>

&nbsp;</p>

<p>

&nbsp;</p>

<p>

&nbsp;</p>

<p>

&nbsp;</p>

<p>

&nbsp;</p>

Attachments