Open in TheBrain

EAGLEHEAD PROJECT

The Eaglehead copper-molybdenum-gold-silver project (15,956 ha), an exploration stage project is located in the Liard Mining District in northern British Columbia. District Copper placed the project on care and maintenance in late 2018 and conducted no exploration on the property in 2019.

Between 2014 and 2018, District re-logged 94 historical diamond drill holes (26,248m), sampled, re-sampled and re-analyzed 22,697m of drill core from 99 historical drill holes, completed airborne and ground geophysical surveys, preliminary rock characterization testwork and drilled six diamond drill holes (3,413m) to test the continuity of the copper-molybdenum-gold-silver mineralization in the East, Bornite and Pass zones.

Representative mineralized intervals from the various zone located within the property are set out below. (Note: The mineralized intervals below do not represent true widths)

Preliminary Metallurgical Testwork

In 2015 and 2016; preliminary rock characterization (“metallurgical”) testwork on mineralized lithologies over a range of copper grades showed that all samples responded well to conventional copper-molybdenite flotation producing a clean concentrate product with recoveries of 89.9% copper, 71.1% molybdenite, 78.6% gold, and 78.1% silver.

In 2017, Copper Fox prepared a report entitled “NI 43-101 Technical Report on the Eaglehead Project” with an Effective Date of July 10, 2017; Robert A. (Bob) Lane, M.Sc., P.Geo. as Qualified Person. The conclusions and recommendations of the Technical Report are summarized below.

In 2018 District completed the re-logging, sampling and re-sampling of the remaining historical diamond drill holes from the East, Bornite, Pass and Camp zones. This work completes the process of cleaning up the “legacy data” issues related to the Eaglehead project. The 2018 analytical results did not materially change the previously reported analytical results for the drill holes re-sampled in 2018.