GOLDEN ROSE PROJECT (NFLD)

OVERVIEW

The Golden Rose Project lies on strike with Marathon Gold’s Valentine Lake Project on a structural corridor that transects the full length of the project, hosting over 45 km of prospective strike length for gold mineralization.
Situated in a 400 km gold-bearing corridor, the projectis easily accessible via provincial highway and forest access roads.
TRU has the option to acquire a 100% interest.