NEC 820
See chapter 8 of the NFPA 70
Sidebar: 820 Tips
Determine the “point of entrance.”
Ground the incoming cable as close as practicable to the point of entrance.
If you run cables above a suspended ceiling, route and support them to allow access via ceiling panel removal.
If you use a separate grounding electrode, bond it to the power grounding system.