Open in TheBrain

NIST SP 800-53r5 — SA-12(06) Minimizing Procurement Time


source: false

type: canonical-control-reference

standard: NIST SP 800-53r5

assessment_standard: NIST SP 800-53Ar5

baseline_standard: NIST SP 800-53B

control_id: "SA-12(06)"

family_id: "SA"

family: "System and Services Acquisition"

title: "Minimizing Procurement Time"

status: withdrawn

updated: 2026-09-10

authoritative_sources:

- "NIST SP 800-53r5 verified transcription"

- "NIST SP 800-53Ar5 verified transcription"

- "NIST SP 800-53B verified transcription"

baseline_membership:

low: false

moderate: false

high: false

privacy: false


SA-12(06) Minimizing Procurement Time

Canonical combined reference

Control text and discussion come from NIST SP 800-53r5; assessment procedures come from NIST SP 800-53Ar5; baseline membership comes from NIST SP 800-53B.

NIST SP 800-53r5 — Control

Withdrawn

NIST marks this item as withdrawn and incorporated into SR-05(01).

No active control statement is provided for this withdrawn item.

Related Controls

Supporting Publications

NIST SP 800-53Ar5 — Assessment Procedure

Assessment Objective

Determine if:

Potential Assessment Methods and Objects

No assessment methods or objects are specified for this withdrawn control.

References

Source Assessment Procedure — NIST SP 800-53Ar5

NIST SP 800-53B — Baseline Membership

Baseline Membership


Low Not included
Moderate Not included
High Not included
Privacy Not included

Reference

Source Notes

NIST marks this item as withdrawn and incorporated into SR-05(01).