NIST SP 800-53r5 — SA-12(06) Minimizing Procurement Time
source: false
type: canonical-control-reference
standard: NIST SP 800-53r5
assessment_standard: NIST SP 800-53Ar5
baseline_standard: NIST SP 800-53B
control_id: "SA-12(06)"
family_id: "SA"
family: "System and Services Acquisition"
title: "Minimizing Procurement Time"
status: withdrawn
updated: 2026-09-10
authoritative_sources:
- "NIST SP 800-53r5 verified transcription"
- "NIST SP 800-53Ar5 verified transcription"
- "NIST SP 800-53B verified transcription"
baseline_membership:
low: false
moderate: false
high: false
privacy: false
SA-12(06) Minimizing Procurement Time
Canonical combined reference
Control text and discussion come from NIST SP 800-53r5; assessment procedures come from NIST SP 800-53Ar5; baseline membership comes from NIST SP 800-53B.
NIST SP 800-53r5 — Control
Withdrawn
NIST marks this item as withdrawn and incorporated into SR-05(01).
No active control statement is provided for this withdrawn item.
Related Controls
- None specified.
Supporting Publications
- None specified.
NIST SP 800-53Ar5 — Assessment Procedure
Assessment Objective
Determine if:
- No assessment objective is specified because this control is withdrawn.
Potential Assessment Methods and Objects
No assessment methods or objects are specified for this withdrawn control.
References
Source Assessment Procedure — NIST SP 800-53Ar5
- NIST SP 800-53Ar5 SA-12(06)
NIST SP 800-53B — Baseline Membership
| Baseline | Membership |
|---|---|
| Low | Not included |
| Moderate | Not included |
| High | Not included |
| Privacy | Not included |
Reference
- NIST SP 800-53B baseline tables
Source Notes
NIST marks this item as withdrawn and incorporated into SR-05(01).