NIST SP 800-53r5 — SI-13(04) Standby Component Installation and Notification
source: false
type: canonical-control-reference
standard: NIST SP 800-53r5
assessment_standard: NIST SP 800-53Ar5
baseline_standard: NIST SP 800-53B
control_id: "SI-13(04)"
family_id: "SI"
family: "System and Information Integrity"
title: "Standby Component Installation and Notification"
status: active
updated: 2026-09-10
authoritative_sources:
- "NIST SP 800-53r5 verified transcription"
- "NIST SP 800-53Ar5 verified transcription"
- "NIST SP 800-53B verified transcription"
baseline_membership:
low: false
moderate: false
high: false
privacy: false
SI-13(04) Standby Component Installation and Notification
Canonical combined reference
Control text and discussion come from NIST SP 800-53r5; assessment procedures come from NIST SP 800-53Ar5; baseline membership comes from NIST SP 800-53B.
NIST SP 800-53r5 — Control
If system component failures are detected:
- (a) Ensure that the standby components are successfully and transparently installed within [Assignment: organization-defined time period]; and
- (b) [Selection (one or more): Activate [Assignment: organization-defined alarm]; Automatically shut down the system; [Assignment: organization-defined action]].
Discussion
Automatic or manual transfer of components from standby to active mode can occur upon the detection of component failures.
Related Controls
- None specified.
Supporting Publications
- None specified.
NIST SP 800-53Ar5 — Assessment Procedure
Assessment Objective
Determine if:
-
SI-13(04)_ODP[01]— time period for standby components to be installed is defined; -
SI-13(04)_ODP[02]— one or more of the following PARAMETER VALUES is/are selected: {activate <SI-13(04)_ODP[03]alarm>; automatically shut down the system; <SI-13(04)_ODP[04]action>}; -
SI-13(04)_ODP[03]— alarm to be activated when system component failures are detected is defined (if selected); -
SI-13(04)_ODP[04]— action to be taken when system component failures are detected is defined (if selected); -
SI-13(04)(a)— the standby components are successfully and transparently installed within <SI-13(04)_ODP[01]time period> if system component failures are detected; -
SI-13(04)(b)— <SI-13(04)_ODP[02]SELECTED PARAMETER VALUE(S)> are performed if system component failures are detected.
Potential Assessment Methods and Objects
Examine
Select from:
- System and information integrity policy.
- system and information integrity procedures.
- procedures addressing predictable failure prevention.
- system design documentation.
- system configuration settings and associated documentation.
- list of actions to be taken once system component failure is detected.
- system audit records.
- system security plan.
- other relevant documents or records.
Interview
Select from:
- Organizational personnel responsible for MTTF activities.
- organizational personnel with information security responsibilities.
- system/ network administrators.
- organizational personnel with contingency planning responsibilities.
Test
Select from:
- Organizational processes for managing MTTF.
- automated mechanisms supporting and/or implementing the transparent installation of standby components.
- automated mechanisms supporting and/or implementing alarms or system shutdown if component failures are detected.
References
Source Assessment Procedure — NIST SP 800-53Ar5
- NIST SP 800-53Ar5 SI-13(04)
NIST SP 800-53B — Baseline Membership
| Baseline | Membership |
|---|---|
| Low | Not included |
| Moderate | Not included |
| High | Not included |
| Privacy | Not included |
Reference
- NIST SP 800-53B baseline tables