NIST SP 800-53r5 — MA-06(02) Predictive Maintenance
source: false
type: canonical-control-reference
standard: NIST SP 800-53r5
assessment_standard: NIST SP 800-53Ar5
baseline_standard: NIST SP 800-53B
control_id: "MA-06(02)"
family_id: "MA"
family: "Maintenance"
title: "Predictive Maintenance"
status: active
updated: 2026-09-10
authoritative_sources:
- "NIST SP 800-53r5 verified transcription"
- "NIST SP 800-53Ar5 verified transcription"
- "NIST SP 800-53B verified transcription"
baseline_membership:
low: false
moderate: false
high: false
privacy: false
MA-06(02) Predictive Maintenance
Canonical combined reference
Control text and discussion come from NIST SP 800-53r5; assessment procedures come from NIST SP 800-53Ar5; baseline membership comes from NIST SP 800-53B.
NIST SP 800-53r5 — Control
Perform predictive maintenance on [Assignment: organization-defined system components] at [Assignment: organization-defined time intervals].
Discussion
Predictive maintenance evaluates the condition of equipment by performing periodic or continuous (online) equipment condition monitoring. The goal of predictive maintenance is to perform maintenance at a scheduled time when the maintenance activity is most cost-effective and before the equipment loses performance within a threshold. The predictive component of predictive maintenance stems from the objective of predicting the future trend of the equipment's condition. The predictive maintenance approach employs principles of statistical process control to determine at what point in the future maintenance activities will be appropriate. Most predictive maintenance inspections are performed while equipment is in service, thus minimizing disruption of normal system operations. Predictive maintenance can result in substantial cost savings and higher system reliability.
Related Controls
- None specified.
Supporting Publications
- None specified.
NIST SP 800-53Ar5 — Assessment Procedure
Assessment Objective
Determine if:
-
MA-06(02)_ODP[01]— system components on which predictive maintenance is to be performed are defined; -
MA-06(02)_ODP[02]— time intervals within which predictive maintenance is to be performed are defined; -
MA-06(02)— predictive maintenance is performed on <MA-06(02)_ODP[01]system components> at <MA-06(02)_ODP[02]time intervals>.
Potential Assessment Methods and Objects
Examine
Select from:
- Maintenance policy.
- procedures addressing system maintenance.
- service provider contracts.
- service-level agreements.
- maintenance records.
- list of system components requiring predictive maintenance.
- system security plan.
- other relevant documents or records.
Interview
Select from:
- Organizational personnel with system maintenance responsibilities.
- organizational personnel with information security responsibilities.
- system/network administrators.
Test
Select from:
- Organizational processes for predictive maintenance.
- mechanisms supporting and/or implementing predictive maintenance.
References
Source Assessment Procedure — NIST SP 800-53Ar5
- NIST SP 800-53Ar5 MA-06(02)
NIST SP 800-53B — Baseline Membership
| Baseline | Membership |
|---|---|
| Low | Not included |
| Moderate | Not included |
| High | Not included |
| Privacy | Not included |
Reference
- NIST SP 800-53B baseline tables