NERC CIP — CIP-002-8 R1 BES Cyber System Identification and Categorization
source: false
type: "canonical-control-reference"
standard: "NERC Critical Infrastructure Protection"
document_version: "CIP-002-8"
criterion_id: "CIP-002-8 R1"
family_id: "CIP-002-8"
family: "Cyber Security - BES Cyber System Categorization"
title: "BES Cyber System Identification and Categorization"
status: "approved-future-enforcement"
assessment_criterion: true
normative_text_included: true
updated: "2026-09-13"
source_pdf: "Resources/CMMC Brain 2.1/Sources/NERC CIP/CIP-002-8.pdf"
source_pages: [4, 6, 7, 10, 11, 12]
requirement_pages: [4]
us_effective_date: "07/01/2028"
mapping_status: "not-transferred-from-2024-SCF-set"
CIP-002-8 R1 BES Cyber System Identification and Categorization
Version and enforcement
U.S. status checked 2026-09-13: Subject to Future Enforcement. Standard effective date: 07/01/2028. Jurisdiction-specific applicability and transitional obligations must be checked against the implementation plan.
Requirement
Each Responsible Entity shall implement a process that considers each of the following assets for purposes of Parts 1.1 through 1.3: [Violation Risk Factor: High] [Time Horizon: Operations Planning]
-
i.Control Centers and backup Control Centers;
-
ii.Transmission stations and substations;
-
iii.Generation resources;
-
iv.Systems and facilities critical to system restoration, including Blackstart Resources and Cranking Paths and initial switching requirements;
-
v.RAS that support the reliable operation of the BES; and
-
vi.For Distribution Providers, Protection Systems specified in Applicability section 4.2.1 above.
-
1.1.Identify each of the high impact BCS according to Attachment 1, Section 1, if any, at each asset;
-
1.2.Identify each of the medium impact BCS according to Attachment 1, Section 2, if any, at each asset; and
-
1.3.Identify each asset that contains a low impact BCS according to Attachment 1, Section 3, if any (a discrete list of low impact BCS is not required).
Assessment Measure
Acceptable evidence includes, but is not limited to, dated electronic or physical lists required by Requirement R1.
Attachment 1 — Required Criteria
Attachment 1 – Impact Rating Criteria
Impact Rating Criteria
The criteria defined in Attachment 1 do not constitute stand-alone compliance requirements, but are criteria characterizing the level of impact and are referenced by requirements.
1. High impact rating
Each BCS used by and located at any of the following:
-
1.1.For Reliability Coordinators, each Control Center or backup Control Center used to perform the reliability tasks of the Reliability Coordinator.
-
1.2.For Balancing Authorities, each Control Center or backup Control Center used to perform the reliability tasks of the Balancing Authority for: 1) generation equal to or greater than an aggregate of 3000 MW in a single Interconnection, or 2) one or more of the assets that meet criterion 2.3, 2.6, or 2.9.
-
1.3.For Transmission Operators and Transmission Owners, each Control Center or backup Control Center for one or more of the assets that meet criterion 2.2, 2.4, 2.5, 2.7, 2.8, 2.9, or 2.10.
-
1.4For Generator Operators, each Control Center or backup Control Center used to perform the reliability tasks of the Generator Operator for one or more of the assets that meet criterion 2.1, 2.3, 2.6, or 2.9.
2. Medium impact rating
Each BCS, not included in Section 1 above, associated with any of the following:
-
2.1.Commissioned generation, by each group of generating units at a single plant location, with an aggregate highest rated net Real Power capability of the preceding 12 calendar months equal to or exceeding 1500 MW in a single Interconnection. For each group of generating units, the only BCS that meet this criterion are each discrete shared BCS that could, within 15 minutes, adversely impact the reliable operation of any combination of units that in aggregate equal or exceed 1500 MW in a single Interconnection.
-
2.2.Each BES reactive resource or group of resources at a single location (excluding generation Facilities) with an aggregate maximum Reactive Power nameplate rating of 1000 MVAR or greater (excluding those at generation Facilities). The only BCS that meet this criterion are each discrete shared BCS that could, within 15 minutes, adversely impact the reliable operation of any combination of resources that in aggregate equal or exceed 1000 MVAR.
-
2.3.Each generation Facility that its Planning Coordinator or Transmission Planner designates, and informs the Generator Owner or Generator Operator, as necessary to avoid an Adverse Reliability Impact in the planning horizon of more than one year.
-
2.4.Transmission Facilities operated at 500 kV or higher. For the purpose of this criterion, the collector bus for a generation plant is not considered a Transmission Facility, but is part of the generation interconnection Facility.
-
2.5.Transmission Facilities that are operating between 200 kV and 499 kV at a single station or substation, where the station or substation is connected at 200 kV or higher voltages to three or more other Transmission stations or substations and has an "aggregate weighted value" exceeding 3000 according to the table below. The "aggregate weighted value" for a single station or substation is determined by summing the "weight value per line" shown in the table below for each incoming and each outgoing BES Transmission Line that is connected to another Transmission station or substation. For the purpose of this criterion, the collector bus for a generation plant is not considered a Transmission Facility, but is part of the generation interconnection Facility.
| Voltage Value of a Line | Weight Value per Line |
|---|---|
| less than 200 kV (not applicable) | (not applicable) |
| 200 kV to 299 kV | 700 |
| 300 kV to 499 kV | 1300 |
| 500 kV and above | 0 (N/A) |
-
2.6.Generation at a single plant location or Transmission Facilities at a single station or substation location that are identified by its Reliability Coordinator, Planning Coordinator, or Transmission Planner as critical to the derivation of Interconnection Reliability Operating Limits (IROLs) and their associated contingencies.
-
2.7.Transmission Facilities identified as essential to meeting Nuclear Plant Interface Requirements.
-
2.8.Transmission Facilities, including generation interconnection Facilities, providing the generation interconnection required to connect generator output to the Transmission Systems that, if destroyed, degraded, misused, or otherwise rendered unavailable, would result in the loss of the generation Facilities identified by any Generator Owner as a result of its application of Attachment 1, criterion 2.1 or 2.3.
-
2.9.Each RAS or automated switching System that operates BES Elements, that, if destroyed, degraded, misused, or otherwise rendered unavailable, would cause one or more IROLs violations for failure to operate as designed or cause a reduction in one or more IROLs if destroyed, degraded, misused, or otherwise rendered unavailable.
-
2.10.Each system or group of Elements that performs automatic Load shedding under a common control system, without human operator initiation, of 300 MW or more implementing UVLS or UFLS under a load shedding program that is subject to one or more requirements in a NERC or regional reliability standard.
-
2.11.For Generator Operators, each Control Center or backup Control Center used to perform the reliability tasks of the Generator Operator for an aggregate highest rated net Real Power capability of the preceding 12 calendar months equal to or exceeding 1500 MW in a single Interconnection.
-
2.12.For Transmission Operators and Transmission Owners, each Control Center or backup Control Center with an “aggregate weighted value” exceeding 6000 according to the table below and subject to the listed exclusion. The “aggregate weighted value” for a Control Center or backup Control Center is determined by summing the “weight value per BES Transmission Line,” shown in the table below, for lines that are monitored and controlled by the Control Center or backup Control Center. Include each BES Transmission Line that is connected between two or more Transmission stations or substations.
| Voltage Value of a BES Transmission Line | Weight Value per BES Transmission Line |
|---|---|
| <100 kV | 100 |
| 100 kV to 199 kV | 250 |
| 200 kV to 299 kV | 700 |
| 300 kV to 499 kV | 1300 |
| 500 kV and above | 0 (N/A) |
Exclusion: Provided that the “aggregate weighted value” calculated according to the table above is less than 12000, a Transmission Operator or a Transmission Owner may exclude the BES Transmission Lines that are contained in a single group of contiguous Elements from their “aggregate weighted value” calculation, where a group of contiguous Elements is defined as:
- a group of contiguous Elements emanating from multiple points of connection at 69 kV or higher;
- that are operated at less than 300 kV; and
- where the gross export does not exceed 75 MWh during non-Energy Emergency Alert conditions. The gross export is based on the hourly integrated values of the preceding 12 calendar months.
-
2.13.For Balancing Authorities, each Control Center or backup Control Center used to perform the reliability tasks of the Balancing Authority for generation equal to or greater than an aggregate of 1500 MW in a single Interconnection.
3. Low impact rating
BCS not included in Sections 1 or 2 above that are associated with any of the following assets and that meet the applicability qualifications in Section 4 - Applicability, part 4.2 – Facilities, of this standard:
-
3.1.Control Centers and backup Control Centers.
-
3.2.Transmission stations and substations.
-
3.3.Generation resources.
-
3.4.Systems and facilities critical to system restoration, including Blackstart Resources and Cranking Paths and initial switching requirements.
-
3.5.RAS that support the reliable operation of the BES.
-
3.6.For Distribution Providers, Protection Systems specified in Applicability section 4.2.1 above.
Violation Severity Levels
Lower
For Responsible Entities with more than a total of 40 BES assets in Requirement R1, five percent or fewer BES assets have not been considered according to Requirement R1;
OR
For Responsible Entities with a total of 40 or fewer BES assets, 2 or fewer BES assets in Requirement R1, have not been considered according to Requirement R1;
OR
For Responsible Entities with more than a total of 100 high and medium impact BCS, five percent or fewer of identified BCS have not been categorized or have been incorrectly categorized at a lower category;
OR
For Responsible Entities with a total of 100 or fewer high and medium impact BCS, five or fewer identified BCS have not been categorized or have been incorrectly categorized at a lower category.
OR For Responsible Entities with more than a total of 100 high and medium impact BCS, five percent or fewer high or medium BCS have not been identified;
OR
For Responsible Entities with a total of 100 or fewer high and medium impact BCS, five or fewer high or medium BCS have not been identified.
Moderate
For Responsible Entities with more than a total of 40 BES assets in Requirement R1, more than five percent, but less than or equal to 10 percent of BES assets have not been considered, according to Requirement R1;
OR
For Responsible Entities with a total of 40 or fewer BES assets, more than two, but fewer than or equal to four BES assets in Requirement R1, have not been considered according to Requirement R1;
OR
For Responsible Entities with more than a total of 100 high and medium impact BCS, more than five percent, but less than or equal to 10 percent of identified BCS have not been categorized or have been incorrectly categorized at a lower category;
OR
For Responsible Entities with a total of 100 or fewer high and medium impact BCS, more than five, but less than or equal to 10 identified BES Cyber Systems have not been categorized or have been incorrectly categorized at a lower category.
OR
For Responsible Entities with more than a total of 100 high and medium impact BCS, more than five percent, but less than or equal to 10 percent high or medium BCS have not been identified;
OR
For Responsible Entities with a total of 100 or fewer high and medium impact BCS, more than five, but less than or equal to 10 high or medium BCS have not been identified.
High
For Responsible Entities with more than a total of 40 BES assets in Requirement R1, more than 10 percent, but less than or equal to 15 percent of BES assets have not been considered, according to Requirement R1;
OR
For Responsible Entities with a total of 40 or fewer BES assets, more than four, but fewer than or equal to six BES assets in Requirement R1, have not been considered according to Requirement R1;
OR
For Responsible Entities with more than a total of 100 high or medium impact BCS, more than 10 percent, but less than or equal to 15 percent of identified BCS have not been categorized or have been incorrectly categorized at a lower category;
OR
For Responsible Entities with a total of 100 or fewer high or medium impact BCS, more than 10, but less than or equal to 15 identified BCS have not been categorized or have been incorrectly categorized at a lower category.
OR
For Responsible Entities with more than a total of 100 high and medium impact BCS, more than 10 percent, but less than or equal to 15 percent high or medium BCS have not been identified;
OR
For Responsible Entities with a total of 100 or fewer high and medium impact BCS, more than 10, but less than or equal to 15 high or medium BCS have not been identified.
Severe
For Responsible Entities with more than a total of 40 BES assets in Requirement R1, more than 15 percent of BES assets have not been considered, according to Requirement R1;
OR
For Responsible Entities with a total of 40 or fewer BES assets, more than six BES assets in Requirement R1, have not been considered according to Requirement R1;
OR
For Responsible Entities with more than a total of 100 high and medium impact BCS, more than 15 percent of identified BCS have not been categorized or have been incorrectly categorized at a lower category;
OR
For Responsible Entities with a total of 100 or fewer high and medium impact BCS, more than 15 identified BCS have not been categorized or have been incorrectly categorized at a lower category.
OR
For Responsible Entities with more than a total of 100 high and medium impact BCS, more than 15 percent of high or medium impact BCS have not been identified;
OR
For Responsible Entities with a total of 100 or fewer high and medium impact BES Cyber Systems, more than 15 high or medium impact BCS have not been identified.
Applicability and Evidence Retention
CIP-002-8 applicability, exemptions, compliance monitoring, and evidence retention.
Referenced Publications
- CIP-002-8 official standard; PDF page(s) 4, 6, 7, 10, 11, 12. NERC original PDF.
- NERC standard status and dates (checked 2026-09-13).
- CIP-002-8 implementation plan. NERC original implementation plan.
Notes
- Assessment reference scope: the complete numbered requirement, associated parts and measures are kept together. Source wording is transcribed; line wrapping and presentation are normalized. The official PDF controls if a discrepancy is found.
- Table columns are presented as labeled subsections for each part so applicability, requirements, and measures remain associated.
- Publicly available does not mean public domain. This is an internal reference, not an NERC publication or endorsement.
- Legacy SCF relationships refer to the 2024 versioned mapping set; no cross-version equivalence is asserted.