Open in TheBrain

NIST RMF SP 800-37r2 — TASK I-2 Update Control Implementation Information


source: false

type: canonical-control-reference

standard: "NIST SP 800-37 Rev. 2 RMF"

document_version: "2"

criterion_id: "TASK I-2"

family_id: "I"

family: "I Implement"

title: "Update Control Implementation Information"

status: active

assessment_criterion: true

reference_basis: "complete published NIST task block; supplemental SCF mappings"

normative_text_included: true

updated: 2026-09-13

scf_mappings:

- "IAO-05"

source_pdf_pages: [79]

authoritative_sources:

- "NIST SP 800-37 Rev. 2, December 2018"

- "SCF STRM NIST SP 800-37r2"


TASK I-2 Update Control Implementation Information

Public-source assessment reference

This card contains the complete task block from NIST SP 800-37 Rev. 2 (December 2018): task, inputs, outputs, responsibilities, discussion, and published references. SCF relationships are supplemental mappings, not the source of RMF task text.

Criterion Text

Document changes to planned control implementations based on the “as-implemented” state of controls.

Potential Inputs

Security and privacy plans; information from control implementation efforts.

Expected Outputs

Security and privacy plans updated with implementation detail sufficient for use by assessors; system configuration baseline.

Primary Responsibility

System Owner; Common Control Provider.

Supporting Roles

Information Owner or Steward; Security Architect; Privacy Architect; Systems Security Engineer; Privacy Engineer; System Security Officer; System Privacy Officer; Enterprise Architect; System Administrator.

System Development Life Cycle Phase

Discussion

Despite the control implementation details in the security and privacy plans and the system design documents, it is not always feasible to implement controls as planned. Therefore, as control implementations are carried out, the security and privacy plans are updated with as-implemented control implementation details. The updates include revised descriptions of implemented controls including changes to planned inputs, expected behavior, and expected outputs with sufficient detail to support control assessments. Documenting the “as implemented” control information is essential to providing the capability to determine when there are changes to the controls, whether those changes are authorized, and the impact of the changes on the security and privacy posture of the system and the organization.

Task References

SP 800-531; SP 800-1282; SP 800-160 v13 (Implementation, Integration, Verification, and Transition, Configuration Management Processes).

SCF Relationships

Notes

References

Referenced Publications and Source Notes


1 National Institute of Standards and Technology Special Publication 800-53, Revision 4, Security and Privacy Controls for Federal Information Systems and Organizations, April 2013. https://doi.org/10.6028/NIST.SP.800-53r4 (NIST source reference SP 800-53.)

2 National Institute of Standards and Technology Special Publication 800-128, Guide for Security-Focused Configuration Management of Information Systems, August 2011. https://doi.org/10.6028/NIST.SP.800-128 (NIST source reference SP 800-128.)

3 National Institute of Standards and Technology Special Publication 800-160, Volume 1, Systems Security Engineering: Considerations for a Multidisciplinary Approach in the Engineering of Trustworthy Secure Systems, November 2016. https://doi.org/10.6028/NIST.SP.800-160v1 (NIST source reference SP 800-160 v1.)