Open in TheBrain

NIST SP 800-53r5 — SR-05(02) Assessments Prior to Selection, Acceptance, Modification, or Update


source: false

type: canonical-control-reference

standard: NIST SP 800-53r5

assessment_standard: NIST SP 800-53Ar5

baseline_standard: NIST SP 800-53B

control_id: "SR-05(02)"

family_id: "SR"

family: "Supply Chain Risk Management"

title: "Assessments Prior to Selection, Acceptance, Modification, or Update"

status: active

updated: 2026-09-10

authoritative_sources:

- "NIST SP 800-53r5 verified transcription"

- "NIST SP 800-53Ar5 verified transcription"

- "NIST SP 800-53B verified transcription"

baseline_membership:

low: false

moderate: false

high: false

privacy: false

related_controls:

- "CA-08"

- "RA-05"

- "SA-11"

- "SI-07"


SR-05(02) Assessments Prior to Selection, Acceptance, Modification, or Update

Canonical combined reference

Control text and discussion come from NIST SP 800-53r5; assessment procedures come from NIST SP 800-53Ar5; baseline membership comes from NIST SP 800-53B.

NIST SP 800-53r5 — Control

Assess the system, system component, or system service prior to selection, acceptance, modification, or update.

Discussion

Organizational personnel or independent, external entities conduct assessments of systems, components, products, tools, and services to uncover evidence of tampering, unintentional and intentional vulnerabilities, or evidence of non-compliance with supply chain controls. These include malicious code, malicious processes, defective software, backdoors, and counterfeits. Assessments can include evaluations; design proposal reviews; visual or physical inspection; static and dynamic analyses; visual, x-ray, or magnetic particle inspections; simulations; white, gray, or black box testing; fuzz testing; stress testing; and penetration testing (see NIST SP 800-53r5 SR-06(01)). Evidence generated during assessments is documented for follow-on actions by organizations. The evidence generated during the organizational or independent assessments of supply chain elements may be used to improve supply chain processes and inform the supply chain risk management process. The evidence can be leveraged in follow-on assessments. Evidence and other documentation may be shared in accordance with organizational agreements.

Related Controls

Supporting Publications

NIST SP 800-53Ar5 — Assessment Procedure

Assessment Objective

Determine if:

Potential Assessment Methods and Objects

Examine

Select from:

Interview

Select from:

Test

Select from:

References

Source Assessment Procedure — NIST SP 800-53Ar5

NIST SP 800-53B — Baseline Membership

Baseline Membership


Low Not included
Moderate Not included
High Not included
Privacy Not included

Reference