Open in TheBrain

NERC CIP — CIP-007-7.1 Applicability and Compliance


type: "standard-scope-reference"

standard: "CIP-007-7.1"

updated: "2026-09-13"


CIP-007-7.1 Applicability and Compliance

Version and enforcement

U.S. status checked 2026-09-13: Subject to Future Enforcement. Standard effective date: 07/01/2028. Jurisdiction-specific applicability and transitional obligations must be checked against the implementation plan.

Standard Scope and Compliance Text

A. Introduction

    - **`4.1.`** Functional Entities: For the purpose of the requirements contained herein, the following list of functional entities will be collectively referred to as “Responsible Entities.” For requirements in this standard where a specific functional entity or subset of functional entities are the applicable entity or entities, the functional entity or entities are specified explicitly.
        - **`4.1.1`** Balancing Authority
        - **`4.1.2`** Distribution Provider that owns one or more of the following Facilities, systems, and equipment for the protection or restoration of the BES:
            - **`4.1.2.1`** Each underfrequency Load shedding (UFLS) or undervoltage Load shedding (UVLS) system that:
                - **`4.1.2.1.1`** is part of a Load shedding program that is subject to one or more requirements in a NERC or Regional Reliability Standard; and
                - **`4.1.2.1.2`** performs automatic Load shedding under a common control system owned by the Responsible Entity, without human operator initiation, of 300 MW or more.
            - **`4.1.2.2`** Each Remedial Action Scheme (RAS) where the RAS is subject to one or more requirements in a NERC or Regional Reliability Standard.
            - **`4.1.2.3`** Each Protection System (excluding UFLS and UVLS) that applies to Transmission where the Protection System is subject to one or more requirements in a NERC or Regional Reliability Standard.
            - **`4.1.2.4`** Each Cranking Path and group of Elements meeting the initial switching requirements from a Blackstart Resource up to and including the first interconnection point of the starting station service of the next generation unit(s) to be started.
        - **`4.1.3`** Generator Operator
        - **`4.1.4`** Generator Owner
        - **`4.1.5`** Reliability Coordinator
        - **`4.1.6`** Transmission Operator
        - **`4.1.7`** Transmission Owner
    - **`4.2.`** Facilities: For the purpose of the requirements contained herein, the following Facilities, systems, and equipment owned by each Responsible Entity in 4.1 above are those to which these requirements are applicable. For requirements in this standard where a specific type of Facilities, system, or equipment or subset of Facilities, systems, and equipment are applicable, these are specified explicitly.
        - **`4.2.1`** Distribution Provider: One or more of the following Facilities, systems and equipment owned by the Distribution Provider for the protection or restoration of the BES:
            - **`4.2.1.1`** Each UFLS or UVLS System that:
                - **`4.2.1.1.1`** is part of a Load shedding program that is subject to one or more requirements in a NERC or Regional Reliability Standard; and
                - **`4.2.1.1.2`** performs automatic Load shedding under a common control system owned by the Responsible Entity, without human operator initiation, of 300 MW or more.
            - **`4.2.1.2`** Each RAS where the RAS is subject to one or more requirements in a NERC or Regional Reliability Standard.
            - **`4.2.1.3`** Each Protection System (excluding UFLS and UVLS) that applies to Transmission where the Protection System is subject to one or more requirements in a NERC or Regional Reliability Standard.
            - **`4.2.1.4`** Each Cranking Path and group of Elements meeting the initial switching requirements from a Blackstart Resource up to and including the first interconnection point of the starting station service of the next generation unit(s) to be started.
        - **`4.2.2`** Responsible Entities listed in 4.1 other than Distribution Providers:
            All BES Facilities.
        - **`4.2.3`** Exemptions: The following are exempt from Standard CIP-007-7.1:
            - **`4.2.3.1`** Cyber Systems at Facilities regulated by the Canadian Nuclear Safety Commission.
            - **`4.2.3.2`** Cyber Systems associated with communication networks and data communication links between discrete Electronic Security Perimeters (ESP).
            - **`4.2.3.3`** Cyber Systems, associated with communication networks and data communication links, between the Cyber Systems providing confidentiality and integrity of an ESP that extends to one or more geographic locations.
            - **`4.2.3.4`** The systems, structures, and components that are regulated by the Nuclear Regulatory Commission under a cyber security plan pursuant to 10 C.F.R. Section 73.54.
            - **`4.2.3.5`** For Distribution Providers, the systems and equipment that are not included in section 4.2.1 above.
            - **`4.2.3.6`** Responsible Entities that identify that they have no BES Cyber Systems categorized as high impact or medium impact according to the CIP-002- identification and categorization processes.
    - **`4.3.`** “Applicable Systems”: Each table has an “Applicable Systems” column to define the scope of systems to which a specific requirement part applies.

C. Compliance

    - **`1.1.`** Compliance Enforcement Authority: As defined in the NERC Rules of Procedure, “Compliance Enforcement Authority” (CEA) means NERC or the Regional Entity in their respective roles of monitoring and enforcing compliance with the NERC Reliability Standards.
    - **`1.2.`** Evidence Retention: The following evidence retention periods identify the period of time an entity is required to retain specific evidence to demonstrate compliance. For instances where the evidence retention period specified below is shorter than the time since the last audit, the CEA may ask an entity to provide other evidence to show that it was compliant for the full time period since the last audit.
        The Responsible Entity shall keep data or evidence to show compliance as identified below unless directed by its CEA to retain specific evidence for a longer period of time as part of an investigation:
        - Each Responsible Entity shall retain evidence of each requirement in this standard for three calendar years.
        - If a Responsible Entity is found non-compliant, it shall keep information related to the non-compliance until mitigation is complete and approved or for the time specified above, whichever is longer.
        - The CEA shall keep the last audit records and all requested and submitted subsequent audit records.
    - **`1.3.`** Compliance Monitoring and Assessment Processes: As defined in the NERC Rules of Procedure, “Compliance Monitoring and Enforcement Program” refers to the identification of the processes that will be used to evaluate data or information for the purpose of assessing performance or outcomes with the associated Reliability Standard.
    - **`1.4.`** Additional Compliance Information: None

D. Regional Variances

None.

E. Interpretations

None.

F. Associated Documents

Requirement Cards

Referenced Publications