NERC CIP — CIP-009-7.1 R3 Recovery Plan Review, Update and Communication
source: false
type: "canonical-control-reference"
standard: "NERC Critical Infrastructure Protection"
document_version: "CIP-009-7.1"
criterion_id: "CIP-009-7.1 R3"
family_id: "CIP-009-7.1"
family: "Cyber Security — Recovery Plans for BES Cyber Systems"
title: "Recovery Plan Review, Update and Communication"
status: "approved-future-enforcement"
assessment_criterion: true
normative_text_included: true
updated: "2026-09-13"
source_pdf: "Resources/CMMC Brain 2.1/Sources/NERC CIP/CIP-009-7.1.pdf"
source_pages: [8, 9, 12, 13]
requirement_pages: [8, 9]
us_effective_date: "07/01/2028"
mapping_status: "not-transferred-from-2024-SCF-set"
CIP-009-7.1 R3 Recovery Plan Review, Update and Communication
Version and enforcement
U.S. status checked 2026-09-13: Subject to Future Enforcement. Standard effective date: 07/01/2028. Jurisdiction-specific applicability and transitional obligations must be checked against the implementation plan.
Requirement
Each Responsible Entity shall maintain each of its recovery plan(s) in accordance with each of the applicable Requirement Parts in CIP-009-7.1 Table R3 – Recovery Plan Review, Update and Communication. [Violation Risk Factor: Lower] [Time Horizon: Operations Assessment].
Assessment Measure
Acceptable evidence includes, but is not limited to, each of the Applicable Requirement parts in CIP-009-7.1 Table R3 – Recovery Plan Review, Update and Communication.
Requirement Parts
Part 3.1
Applicable Systems
High impact BCS and their associated:
-
1.EACMS; and
-
2.PACS
Medium impact BCS at Control Centers and their associated:
-
1.EACMS; and
-
2.PACS
Requirement
No later than 90 calendar days after completion of a recovery plan test or actual recovery:
-
3.1.1.Document any lessons learned associated with a recovery plan test or actual recovery or document the absence of any lessons learned;
-
3.1.2.Update the recovery plan based on any documented lessons learned associated with the plan; and
-
3.1.3.Notify each person or group with a defined role in the recovery plan of the updates to the recovery plan based on any documented lessons learned.
Measures
Examples of evidence may include, but are not limited to, all of the following:
-
1.Dated documentation of identified deficiencies or lessons learned for each recovery plan test or actual incident recovery or dated documentation stating there were no lessons learned;
-
2.Dated and revised recovery plan showing any changes based on the lessons learned; and
-
3.Evidence of plan update distribution including, but not limited to:
- Emails;
- USPS or other mail service;
- Electronic distribution system; or
- Training sign-in sheets.
Part 3.2
Applicable Systems
High impact BCS and their associated:
-
1.EACMS; and
-
2.PACS
Medium impact BCS at Control Centers and their associated:
-
1.EACMS; and
-
2.PACS
Requirement
No later than 60 calendar days after a change to the roles or responsibilities, responders, or technology that the Responsible Entity determines would impact the ability to execute the recovery plan:
-
3.2.1.Update the recovery plan; and
-
3.2.2.Notify each person or group with a defined role in the recovery plan of the updates.
Measures
Examples of evidence may include, but are not limited to, all of the following:
-
1.Dated and revised recovery plan with changes to the roles or responsibilities, responders, or technology; and
-
2.Evidence of plan update distribution including, but not limited to:
- Emails;
- USPS or other mail service;
- Electronic distribution system; or
- Training sign-in sheets.
Violation Severity Levels
Lower
The Responsible Entity did not notify each person or group with a defined role in the recovery plan(s) of updates within 90 and less than 120 calendar days of the update being completed. (Part 3.1.3)
Moderate
The Responsible Entity did not update the recovery plan(s) based on any documented lessons learned within 90 and less than 120 calendar days of each recovery plan test or actual recovery. (Part 3.1.2)
OR
The Responsible Entity did not notify each person or group with a defined role in the recovery plan(s) of updates within 120 calendar days of the update being completed. (Part 3.1.3)
OR
The Responsible Entity did not update the recovery plan(s) or notified each person or group with a defined role within 60 and less than 90 calendar days of any of the following changes that the responsible entity determines would impact the ability to execute the plan:
- Roles or responsibilities, or
- Responders, or
- Technology changes. (Part 3.2)
High
The Responsible Entity neither documented lessons learned nor documented the absence of any lessons learned within 90 and less than 120 calendar days of each recovery plan test or actual recovery. (Part 3.1.1)
OR
The Responsible Entity did not update the recovery plan(s) based on any documented lessons learned within 120 calendar days of each recovery plan test or actual recovery. (Part 3.1.2)
OR
The Responsible Entity did not update the recovery plan(s) or notified each person or group with a defined role within 90 calendar days of any of the following changes that the responsible entity determines would impact the ability to execute the plan:
- Roles or responsibilities, or
- Responders, or
- Technology changes. (Part (3.2)
Severe
The Responsible Entity neither documented lessons learned nor documented the absence of any lessons learned within 120 calendar days of each recovery plan test or actual recovery. (Part 3.1.1)
Applicability and Evidence Retention
CIP-009-7.1 applicability, exemptions, compliance monitoring, and evidence retention.
Referenced Publications
- CIP-009-7.1 official standard; PDF page(s) 8, 9, 12, 13. NERC original PDF.
- NERC standard status and dates (checked 2026-09-13).
- CIP-009-7.1 implementation plan. NERC original implementation plan.
Notes
- Assessment reference scope: the complete numbered requirement, associated parts and measures are kept together. Source wording is transcribed; line wrapping and presentation are normalized. The official PDF controls if a discrepancy is found.
- Table columns are presented as labeled subsections for each part so applicability, requirements, and measures remain associated.
- Publicly available does not mean public domain. This is an internal reference, not an NERC publication or endorsement.
- Legacy SCF relationships refer to the 2024 versioned mapping set; no cross-version equivalence is asserted.