CMMC 2.0 — SR.L3-03.17.04E Provenance
source: false
type: canonical-control-reference
standard: CMMC 2.0
profile: "Level 3 additive SP 800-172r3 project baseline"
regulatory_status: "project-defined; not the current CMMC v2.13 Level 3 control selection"
document_version: "SP 800-172r3 project baseline"
level: 3
practice_id: "SR.L3-03.17.04E"
source_requirement_id: "03.17.04E"
family_id: "03.17"
domain_id: "SR"
family: "Supply Chain Risk Management"
title: "Provenance"
status: active
baseline_mode: additive
level_2_prerequisite: true
level_2_controls_duplicated: false
scoring_method: "one-point-per-additional-requirement project assumption"
point_value: 1
assessment_reevaluation: conditional
assessment_poam_eligible: "not-defined-for-project-baseline"
deferred_documentation: "re-evaluation-only"
updated: 2026-09-10
authoritative_sources:
- "NIST SP 800-172r3 verified transcription"
- "NIST SP 800-172Ar3 verified transcription"
- "32 CFR Part 170 CMMC Program Final Rule"
canonical_source_card: "NIST SP 800-172r3 03.17.04E"
source_controls:
- "NIST SP 800-53r5 SR-04"
source_assessment_procedures:
- "NIST SP 800-53Ar5 SR-04"
SR.L3-03.17.04E Provenance
Project-defined additive Level 3 profile
This card applies the active NIST SP 800-172r3 enhanced requirement as an additional Level 3 requirement. It is not a representation of the current CMMC v2.13 selection of 24 NIST SP 800-172 (2021) requirements.
CMMC Level 3 — Additive Profile
- Level 2 prerequisite: All Level 2 requirements remain prerequisites and are maintained only in CMMC 2.0 Level 2. They are not duplicated in this folder.
- Additional requirement source: NIST SP 800-172r3 03.17.04E.
- Point value: 1 point under this project profile, following the current CMMC Level 3 one-point-per-additional-requirement model.
- In-assessment correction / re-evaluation: Conditionally permitted for a NOT MET Level 3 requirement during the assessment and for 10 business days following the active assessment period, when additional evidence demonstrates MET, does not materially affect previously assessed requirements, and is provided before the Assessment Findings Report is delivered.
- Assessment POA&M: Not assigned at the individual-card level. The current regulatory exclusion list applies to the legacy 24-requirement CMMC v2.13 selection and cannot be accurately projected onto the complete SP 800-172r3 catalog without an approved successor mapping.
- Deferred documentation: No separate deferred-documentation finding is assumed. Draft, unofficial, or unapproved documentation is not acceptable evidence; corrections are handled through re-evaluation.
Source for the scoring and re-evaluation model: 32 CFR Part 170, §§ 170.18(c)(2), 170.21, and 170.24(c)(3). Application to the complete SP 800-172r3 catalog is a project assumption.
NIST SP 800-172r3 — Enhanced Security Requirement
Document, monitor, and maintain valid provenance of the following systems, system components, and associated CUI: [Assignment: organization-defined systems, system components, and associated CUI].
Discussion
Every system and system component has a point of origin and may be changed throughout its existence. Provenance is the chronology of the origin, development, ownership, location, and changes to a system or system component and associated data. It may also include personnel and processes used to interact with or make modifications to the system, component, or associated data. Organizations have methods to document, monitor, and maintain valid provenance baselines for systems, system components, and related data. These actions help track, assess, and document any changes to the provenance, including changes in supply chain elements or configuration, and help ensure non-repudiation of provenance information and the provenance change records. This requirement does not enhance a specific requirement in SP 800-171 but can be used to strengthen the protection of CUI associated with critical programs or high value assets.
Protection Strategy
PRA, DLO
Adversary Effects
Expose (Detect)
References
Source Controls — NIST SP 800-53r5
NIST SP 800-172Ar3 — Assessment Procedure
Assessment Objective
Determine if:
A.03.17.04E.ODP[01]: systems, system components, and associated CUI that require valid provenance are defined.
A.03.17.04E[01]: valid provenance is documented for <A.03.17.04E.ODP[01]: systems, system components, and associated CUI>.
A.03.17.04E[02]: valid provenance is monitored for <A.03.17.04E.ODP[01]: systems, system components, and associated CUI>.
A.03.17.04E[03]: valid provenance is maintained for <A.03.17.04E.ODP[01]: systems, system components, and associated CUI>.
Assessment Methods and Objects
Examine
[SELECT FROM: Supply chain risk management policy; supply chain risk management procedures; supply chain risk management plan; documentation of critical systems, critical system components, and associated data; documentation showing the history of ownership, custody, and location of and changes to critical systems or critical system components; system architecture; inter-organizational agreements and procedures; contracts; system security plan; other relevant documents or records].
Interview
[SELECT FROM: Organizational personnel with acquisition responsibilities; organizational personnel with information security responsibilities; organizational personnel with supply chain risk management responsibilities].
Test
[SELECT FROM: Organizational processes for identifying the provenance of critical systems and critical system components; mechanisms used to document, monitor, or maintain provenance].
References
Source Assessment Procedure: SR-04
References
Source Assessment Procedures — NIST SP 800-53Ar5
- NIST SP 800-53Ar5 SR-04