Open in TheBrain

NIST SP 800-30r1


source: true

origin:

document: "NIST SP 800-30r1"

title: "NIST Special Publication 800-30 Revision 1, Guide for Conducting Risk Assessments"

identifier: "full publication"

format: "official PDF"

file: "https://nvlpubs.nist.gov/nistpubs/Legacy/SP/nistspecialpublication800-30r1.pdf"

doi: "https://doi.org/10.6028/NIST.SP.800-30r1"

sha256: "f214087f0bdb35932a28c16eb93932a33c67a6edfb5e6f1638866bd201c98e04"

bytes: "826897"

pages: "95"

pdf_created: "2012-09-17"

pdf_modified: "2012-09-17"

local_copy: "NIST.SP.800-30r1.pdf"

transcribed:

by: "tools/nist_source_ingest.py ingest via Claude Haiku 4.5 worker subagent"

on: "2026-09-10"

tool: "pdftotext version 26.08.0"

method: "pdftotext -layout -enc UTF-8, full text verbatim, no edits; page breaks preserved as U+000C form feed"

verified:

by: "tools/nist_source_ingest.py verify (independent pass) via Claude Haiku 4.5 worker subagent"

on: "2026-09-10"

tool: "pdftotext version 26.08.0; pypdf 6.18.0"

method: "diff + independent extractor"

result: "pass"

details:

    v1_local_sha256_matches_record: "True"
    v1_refetched_origin_sha256_matches: "True"
    v2_pdftotext_rerun_byte_identical: "True"
    v3_independent_extractor: "pypdf 6.18.0"
    v3_pages_compared: "95 (pdftotext 96 segments incl. trailing, pypdf 95)"
    v3_len_ratio_range: "1.0000..1.0000"
    v3_min_char_coverage: "1.0000"
    v3_min_page_tok_coverage: "0.9977"
    v3_doc_tok_coverage: "1.0000"
    v3_worst_pages_tok: "p70=0.998, p1=1.000, p2=1.000"
    v3_thresholds: "len 0.97..1.03; chars>=0.98; tok page>=0.97, doc>=0.995"
    v3_pass: "True"
    v4_formfeeds_equals_pdfinfo_pages: "95 == 95 -> True"

notes: |

Body is the verbatim text extraction of the official PDF named in origin.local_copy. Nothing in the body was written, edited, reflowed, or annotated by a person or agent. Page breaks are U+000C form feed characters; page N of the PDF is the Nth segment.


NIST Special Publication 800-30

Revision 1 Guide for Conducting

                                  Risk Assessments
                                  JOINT TASK FORCE
                                  TRANSFORMATION INITIATIVE
                INFORMATION                       SECURITY
                                  Computer Security Division
                                  Information Technology Laboratory
                                  National Institute of Standards and Technology
                                  Gaithersburg, MD 20899-8930
                                  September 2012
                                  U.S. Department of Commerce
                                  Rebecca M. Blank, Acting Secretary
                                  National Institute of Standards and Technology
                                  Patrick D. Gallagher, Under Secretary for Standards and Technology
                                  and Director

Special Publication 800-30 Guide for Conducting Risk Assessments


                         Reports on Computer Systems Technology

The Information Technology Laboratory (ITL) at the National Institute of Standards and

Technology (NIST) promotes the U.S. economy and public welfare by providing technical

leadership for the nation’s measurement and standards infrastructure. ITL develops tests, test

methods, reference data, proof of concept implementations, and technical analyses to advance the

development and productive use of information technology. ITL’s responsibilities include the

development of management, administrative, technical, and physical standards and guidelines for

the cost-effective security and privacy of other than national security-related information in

federal information systems. The Special Publication 800-series reports on ITL’s research,

guidelines, and outreach efforts in information system security, and its collaborative activities

with industry, government, and academic organizations.

                                              PAGE ii

Special Publication 800-30 Guide for Conducting Risk Assessments


                                                Authority

This publication has been developed by NIST to further its statutory responsibilities under the

Federal Information Security Management Act (FISMA), Public Law (P.L.) 107-347. NIST is

responsible for developing information security standards and guidelines, including minimum

requirements for federal information systems, but such standards and guidelines shall not apply to

national security systems without the express approval of appropriate federal officials exercising

policy authority over such systems. This guideline is consistent with the requirements of the

Office of Management and Budget (OMB) Circular A-130, Section 8b(3), Securing Agency

Information Systems, as analyzed in Circular A-130, Appendix IV: Analysis of Key Sections.

Supplemental information is provided in Circular A-130, Appendix III, Security of Federal

Automated Information Resources.

Nothing in this publication should be taken to contradict the standards and guidelines made

mandatory and binding on federal agencies by the Secretary of Commerce under statutory

authority. Nor should these guidelines be interpreted as altering or superseding the existing

authorities of the Secretary of Commerce, Director of the OMB, or any other federal official.

This publication may be used by nongovernmental organizations on a voluntary basis and is not

subject to copyright in the United States. Attribution would, however, be appreciated by NIST.

                             NIST Special Publication 800-30, 95 pages
                                           (September 2012)
                                              CODEN: NSPUE2

Certain commercial entities, equipment, or materials may be identified in this document in order to

describe an experimental procedure or concept adequately. Such identification is not intended to imply

recommendation or endorsement by NIST, nor is it intended to imply that the entities, materials, or

equipment are necessarily the best available for the purpose.

There may be references in this publication to other publications currently under development by NIST

in accordance with its assigned statutory responsibilities. The information in this publication, including

concepts and methodologies, may be used by federal agencies even before the completion of such

companion publications. Thus, until each publication is completed, current requirements, guidelines,

and procedures, where they exist, remain operative. For planning and transition purposes, federal

agencies may wish to closely follow the development of these new publications by NIST.

Organizations are encouraged to review all draft publications during public comment periods and

provide feedback to NIST. All NIST publications are available at http://csrc.nist.gov/publications.

                         Comments on this publication may be submitted to:
                           National Institute of Standards and Technology
                 Attn: Computer Security Division, Information Technology Laboratory
                  100 Bureau Drive (Mail Stop 8930) Gaithersburg, MD 20899-8930
                                 Electronic mail: sec-cert@nist.gov
                                                    PAGE iii

Special Publication 800-30 Guide for Conducting Risk Assessments


                     Compliance with NIST Standards and Guidelines

In accordance with the provisions of FISMA, 1 the Secretary of Commerce shall, on the basis of

standards and guidelines developed by NIST, prescribe standards and guidelines pertaining to

federal information systems. The Secretary shall make standards compulsory and binding to the

extent determined necessary by the Secretary to improve the efficiency of operation or security of

federal information systems. Standards prescribed shall include information security standards

that provide minimum information security requirements and are otherwise necessary to improve

the security of federal information and information systems.

     •    Federal Information Processing Standards (FIPS) are approved by the Secretary of
          Commerce and issued by NIST in accordance with FISMA. FIPS are compulsory and
          binding for federal agencies. 2 FISMA requires that federal agencies comply with these
          standards, and therefore, agencies may not waive their use.
     •    Special Publications (SPs) are developed and issued by NIST as recommendations and
          guidance documents. For other than national security programs and systems, federal
          agencies must follow those NIST Special Publications mandated in a Federal Information
          Processing Standard. FIPS 200 mandates the use of Special Publication 800-53, as
          amended. In addition, OMB policies (including OMB Reporting Instructions for FISMA
          and Agency Privacy Management) state that for other than national security programs
          and systems, federal agencies must follow certain specific NIST Special Publications. 3
     •    Other security-related publications, including interagency reports (NISTIRs) and ITL
          Bulletins, provide technical and other information about NIST's activities. These
          publications are mandatory only when specified by OMB.
     •    Compliance schedules for NIST security standards and guidelines are established by
          OMB in policies, directives, or memoranda (e.g., annual FISMA Reporting Guidance).4

1

The E-Government Act (P.L. 107-347) recognizes the importance of information security to the economic and

national security interests of the United States. Title III of the E-Government Act, entitled the Federal Information

Security Management Act (FISMA), emphasizes the need for organizations to develop, document, and implement an

organization-wide program to provide security for the information systems that support its operations and assets.

2

The term agency is used in this publication in lieu of the more general term organization only in those circumstances

where its usage is directly related to other source documents such as federal legislation or policy.

3

While federal agencies are required to follow certain specific NIST Special Publications in accordance with OMB

policy, there is flexibility in how agencies apply the guidance. Federal agencies apply the security concepts and

principles articulated in the NIST Special Publications in accordance with and in the context of the agency’s missions,

business functions, and environment of operation. Consequently, the application of NIST guidance by federal agencies

can result in different security solutions that are equally acceptable, compliant with the guidance, and meet the OMB

definition of adequate security for federal information systems. Given the high priority of information sharing and

transparency within the federal government, agencies also consider reciprocity in developing their information security

solutions. When assessing federal agency compliance with NIST Special Publications, Inspectors General, evaluators,

auditors, and assessors consider the intent of the security concepts and principles articulated within the specific

guidance document and how the agency applied the guidance in the context of its mission/business responsibilities,

operational environment, and unique organizational conditions.

4

Unless otherwise stated, all references to NIST publications in this document (i.e., Federal Information Processing

Standards and Special Publications) are to the most recent version of the publication.

                                                         PAGE iv

Special Publication 800-30 Guide for Conducting Risk Assessments


                                           Acknowledgements

This publication was developed by the Joint Task Force Transformation Initiative Interagency

Working Group with representatives from the Civil, Defense, and Intelligence Communities in an

ongoing effort to produce a unified information security framework for the federal government.

The National Institute of Standards and Technology wishes to acknowledge and thank the senior

leaders from the Departments of Commerce and Defense, the Office of the Director of National

Intelligence, the Committee on National Security Systems, and the members of the interagency

technical working group whose dedicated efforts contributed significantly to the publication. The

senior leaders, interagency working group members, and their organizational affiliations include:

Department of Defense Office of the Director of National Intelligence

Teresa M. Takai Adolpho Tarasiuk Jr.

DoD Chief Information Officer Assistant DNI and Intelligence Community

                                                                 Chief Information Officer

Richard Hale Charlene Leubecker

Deputy Chief Information Officer for Cybersecurity Deputy Intelligence Community Chief

                                                                 Information Officer

Paul Grant Catherine A. Henson

Director, Cybersecurity Policy Director, Data Management

Dominic Cussatt Greg Hall

Deputy Director, Cybersecurity Policy Chief, Risk Management and Information

                                                                 Security Programs Division

Kurt Eleam

Policy Advisor

National Institute of Standards and Technology Committee on National Security Systems

Charles H. Romine Teresa M. Takai

Director, Information Technology Laboratory Chair, CNSS

Donna Dodson Richard Spires

Cybersecurity Advisor, Information Technology Laboratory Co-Chair, CNSS

Donna Dodson Dominic Cussatt

Chief, Computer Security Division CNSS Subcommittee Co-Chair

Ron Ross Jeffrey Wilk

FISMA Implementation Project Leader CNSS Subcommittee Co-Chair

                   Joint Task Force Transformation Initiative Interagency Working Group

Ron Ross Gary Stoneburner Jennifer Fabius Kelley Dempsey

NIST, JTF Leader Johns Hopkins APL The MITRE Corporation NIST

Deborah Bodeau Steve Rodrigo Peter Gouldmann Arnold Johnson

The MITRE Corporation Tenacity Solutions, Inc. Department of State NIST

Peter Williams Karen Quigg Christina Sames Christian Enloe

Booz Allen Hamilton The MITRE Corporation TASC NIST

In addition to the above acknowledgments, a special note of thanks goes to Peggy Himes and

Elizabeth Lennon of NIST for their superb technical editing and administrative support. The

authors also gratefully acknowledge and appreciate the significant contributions from individuals

and organizations in the public and private sectors, both nationally and internationally, whose

thoughtful and constructive comments improved the overall quality, thoroughness, and usefulness

of this publication.

                                                        PAGE v

Special Publication 800-30 Guide for Conducting Risk Assessments


                 DEVELOPING COMMON INFORMATION SECURITY FOUNDATIONS
                             COLLABORATION AMONG PUBLIC AND PRIVATE SECTOR ENTITIES

In developing standards and guidelines required by FISMA, NIST consults with other federal agencies

and offices as well as the private sector to improve information security, avoid unnecessary and costly

duplication of effort, and ensure that NIST publications are complementary with the standards and

guidelines employed for the protection of national security systems. In addition to its comprehensive

public review and vetting process, NIST is collaborating with the Office of the Director of National

Intelligence (ODNI), the Department of Defense (DoD), and the Committee on National Security

Systems (CNSS) to establish a common foundation for information security across the federal

government. A common foundation for information security will provide the Intelligence, Defense, and

Civil sectors of the federal government and their contractors, more uniform and consistent ways to

manage the risk to organizational operations and assets, individuals, other organizations, and the

Nation that results from the operation and use of information systems. A common foundation for

information security will also provide a strong basis for reciprocal acceptance of security authorization

decisions and facilitate information sharing. NIST is also working with public and private sector

entities to establish specific mappings and relationships between the security standards and guidelines

developed by NIST and the International Organization for Standardization and International

Electrotechnical Commission (ISO/IEC).

                                                     PAGE vi

Special Publication 800-30 Guide for Conducting Risk Assessments


                                                    Table of Contents

CHAPTER ONE INTRODUCTION .......................................................................................... 1

1.1 PURPOSE AND APPLICABILITY .................................................................................................. 2

1.2 TARGET AUDIENCE.................................................................................................................. 2

1.3 RELATED PUBLICATIONS .......................................................................................................... 3

1.4 ORGANIZATION OF THIS SPECIAL PUBLICATION.......................................................................... 3

CHAPTER TWO THE FUNDAMENTALS .................................................................................. 4

2.1 RISK MANAGEMENT PROCESS .................................................................................................. 4

2.2 RISK ASSESSMENT .................................................................................................................. 5

2.3 KEY RISK CONCEPTS ............................................................................................................... 6

2.4 APPLICATION OF RISK ASSESSMENTS ..................................................................................... 17

CHAPTER THREE THE PROCESS ...................................................................................... 23

3.1 PREPARING FOR THE RISK ASSESSMENT ................................................................................ 24

3.2 CONDUCTING THE RISK ASSESSMENT ..................................................................................... 29

3.3 COMMUNICATING AND SHARING RISK ASSESSMENT INFORMATION ............................................ 37

3.4 MAINTAINING THE RISK ASSESSMENT ..................................................................................... 38

APPENDIX A REFERENCES ............................................................................................ A-1

APPENDIX B GLOSSARY ................................................................................................ B-1

APPENDIX C ACRONYMS ............................................................................................... C-1

APPENDIX D THREAT SOURCES ..................................................................................... D-1

APPENDIX E THREAT EVENTS ........................................................................................ E-1

APPENDIX F VULNERABILITIES AND PREDISPOSING CONDITIONS ...................................... F-1

APPENDIX G LIKELIHOOD OF OCCURRENCE .................................................................... G-1

APPENDIX H IMPACT ..................................................................................................... H-1

APPENDIX I RISK DETERMINATION...................................................................................I-1

APPENDIX J INFORMING RISK RESPONSE ........................................................................ J-1

APPENDIX K RISK ASSESSMENT REPORTS ...................................................................... K-1

APPENDIX L SUMMARY OF TASKS ...................................................................................L-1

                                                                PAGE vii

Special Publication 800-30 Guide for Conducting Risk Assessments


                                               Prologue

“... Through the process of risk management, leaders must consider risk to U.S. interests from

adversaries using cyberspace to their advantage and from our own efforts to employ the global

nature of cyberspace to achieve objectives in military, intelligence, and business operations...”

“... For operational plans development, the combination of threats, vulnerabilities, and impacts

must be evaluated in order to identify important trends and decide where effort should be applied

to eliminate or reduce threat capabilities; eliminate or reduce vulnerabilities; and assess,

coordinate, and deconflict all cyberspace operations...”

“... Leaders at all levels are accountable for ensuring readiness and security to the same degree

as in any other domain...”

-- THE NATIONAL STRATEGY FOR CYBERSPACE OPERATIONS

OFFICE OF THE CHAIRMAN, JOINT CHIEFS OF STAFF, U.S. DEPARTMENT OF DEFENSE

                                                  PAGE viii

Special Publication 800-30 Guide for Conducting Risk Assessments


                                           CAUTIONARY NOTES
                                 SCOPE AND APPLICABILITY OF RISK ASSESSMENTS

• Risk assessments are a key part of effective risk management and facilitate decision making at all

      three tiers in the risk management hierarchy including the organization level, mission/business
      process level, and information system level.

• Because risk management is ongoing, risk assessments are conducted throughout the system

      development life cycle, from pre-system acquisition (i.e., material solution analysis and technology
      development), through system acquisition (i.e., engineering/manufacturing development and
      production/deployment), and on into sustainment (i.e., operations/support).

• There are no specific requirements with regard to: (i) the formality, rigor, or level of detail that

      characterizes any particular risk assessment; (ii) the methodologies, tools, and techniques used to
      conduct such risk assessments; or (iii) the format and content of assessment results and any
      associated reporting mechanisms. Organizations have maximum flexibility on how risk assessments
      are conducted and are encouraged to apply the guidance in this document so that the various needs
      of organizations can be addressed and the risk assessment activities can be integrated into broader
      organizational risk management processes.

• Organizations are also cautioned that risk assessments are often not precise instruments of

      measurement and reflect: (i) the limitations of the specific assessment methodologies, tools, and
      techniques employed; (ii) the subjectivity, quality, and trustworthiness of the data used; (iii) the
      interpretation of assessment results; and (iv) the skills and expertise of those individuals or groups
      conducting the assessments.

• Since cost, timeliness, and ease of use are a few of the many important factors in the application of

      risk assessments, organizations should attempt to reduce the level of effort for risk assessments by
      sharing risk-related information, whenever possible.
                                                    PAGE ix

Special Publication 800-30 Guide for Conducting Risk Assessments


CHAPTER ONE

INTRODUCTION

THE NEED FOR RISK ASSESSMENTS TO SUPPORT ENTERPRISE-WIDE RISK MANAGEMENT

O rganizations 5 in the public and private sectors depend on information technology 6 and

         information systems 7 to successfully carry out their missions and business functions.
         Information systems can include very diverse entities ranging from office networks,

financial and personnel systems to very specialized systems (e.g., industrial/process control

systems, weapons systems, telecommunications systems, and environmental control systems).

Information systems are subject to serious threats that can have adverse effects on organizational

operations and assets, individuals, other organizations, and the Nation by exploiting both known

and unknown vulnerabilities to compromise the confidentiality, integrity, or availability of the

information being processed, stored, or transmitted by those systems. Threats to information

systems can include purposeful attacks, environmental disruptions, human/machine errors, and

structural failures, and can result in harm to the national and economic security interests of the

United States. Therefore, it is imperative that leaders and managers at all levels understand their

responsibilities and are held accountable for managing information security risk—that is, the risk

associated with the operation and use of information systems that support the missions and

business functions of their organizations.

Risk assessment is one of the fundamental components of an organizational risk management

process as described in NIST Special Publication 800-39. Risk assessments are used to identify,

estimate, and prioritize risk to organizational operations (i.e., mission, functions, image, and

reputation), organizational assets, individuals, other organizations, and the Nation, resulting from

the operation and use of information systems. The purpose of risk assessments is to inform

decision makers and support risk responses by identifying: (i) relevant threats to organizations or

threats directed through organizations against other organizations; (ii) vulnerabilities both internal

and external to organizations; (iii) impact (i.e., harm) to organizations that may occur given the

potential for threats exploiting vulnerabilities; and (iv) likelihood that harm will occur. The end

result is a determination of risk (i.e., typically a function of the degree of harm and likelihood of

harm occurring). Risk assessments can be conducted at all three tiers in the risk management

hierarchy—including Tier 1 (organization level), Tier 2 (mission/business process level), and Tier

3 (information system level). At Tiers 1 and 2, organizations use risk assessments to evaluate, for

example, systemic information security-related risks associated with organizational governance

and management activities, mission/business processes, enterprise architecture, or the funding of

information security programs. At Tier 3, organizations use risk assessments to more effectively

support the implementation of the Risk Management Framework (i.e., security categorization;

security control selection, implementation, and assessment; information system and common

control authorization; and security control monitoring). 8

5

The term organization describes an entity of any size, complexity, or positioning within an organizational structure

(e.g., a federal agency or, as appropriate, any of its operational elements) that is charged with carrying out assigned

mission/business processes and that uses information systems in support of those processes.

6

Organizations also manage information technology in the form of common infrastructures, sets of shared services, and

sets of common controls.

7

An information system is a discrete set of information resources organized for the collection, processing, maintenance,

use, sharing, dissemination, or disposition of information.

8

    The Risk Management Framework is described in NIST Special Publication 800-37.

CHAPTER 1 PAGE 1

Special Publication 800-30 Guide for Conducting Risk Assessments


1.1 PURPOSE AND APPLICABILITY

The purpose of Special Publication 800-30 is to provide guidance for conducting risk assessments

of federal information systems and organizations, amplifying the guidance in Special Publication

800-39. Risk assessments, carried out at all three tiers in the risk management hierarchy, are part

of an overall risk management process—providing senior leaders/executives with the information

needed to determine appropriate courses of action in response to identified risks. In particular,

this document provides guidance for carrying out each of the steps in the risk assessment process

(i.e., preparing for the assessment, conducting the assessment, communicating the results of the

assessment, and maintaining the assessment) and how risk assessments and other organizational

risk management processes complement and inform each other. Special Publication 800-30 also

provides guidance to organizations on identifying specific risk factors to monitor on an ongoing

basis, so that organizations can determine whether risks have increased to unacceptable levels

(i.e., exceeding organizational risk tolerance) and different courses of action should be taken.

This publication satisfies the requirements of FISMA and meets or exceeds the information

security requirements established for executive agencies 9 by the Office of Management and

Budget (OMB) in Circular A-130, Appendix III, Security of Federal Automated Information

Resources. The guidelines in this publication are applicable to all federal information systems

other than those systems designated as national security systems as defined in 44 U.S.C., Section

  1. The guidelines have been broadly developed from a technical perspective to complement

similar guidelines for national security systems and may be used for such systems with the

approval of appropriate federal officials exercising policy authority over such systems. State,

local, and tribal governments, as well as private sector organizations are encouraged to consider

using these guidelines, as appropriate.

1.2 TARGET AUDIENCE

This publication is intended to serve a diverse group of risk management professionals including:

• Individuals with oversight responsibilities for risk management (e.g., heads of agencies, chief

     executive officers, chief operating officers, risk executive [function]);

• Individuals with responsibilities for conducting organizational missions/business functions

     (e.g., mission/business owners, information owners/stewards, authorizing officials);

• Individuals with responsibilities for acquiring information technology products, services, or

     information systems (e.g., acquisition officials, procurement officers, contracting officers);

• Individuals with information system/security design, development, and implementation

     responsibilities (e.g., program managers, enterprise architects, information security architects,
     information system/security engineers, information systems integrators);

• Individuals with information security oversight, management, and operational responsibilities

     (e.g., chief information officers, senior information security officers,10 information security
     managers, information system owners, common control providers); and

9

An executive agency is: (i) an executive department specified in 5 U.S.C., Section 101; (ii) a military department

specified in 5 U.S.C., Section 102; (iii) an independent establishment as defined in 5 U.S.C., Section 104(1); and (iv) a

wholly owned government corporation fully subject to the provisions of 31 U.S.C., Chapter 91. In this publication, the

term executive agency is synonymous with the term federal agency.

10

At the agency level, this position is known as the Senior Agency Information Security Officer. Organizations may

also refer to this position as the Chief Information Security Officer.

CHAPTER 1 PAGE 2

Special Publication 800-30 Guide for Conducting Risk Assessments


• Individuals with information security/risk assessment and monitoring responsibilities (e.g.,

     system evaluators, penetration testers, security control assessors, risk assessors, independent
     verifiers/validators, inspectors general, auditors).

1.3 RELATED PUBLICATIONS

The risk assessment approach described in this publication is supported by a series of security

standards and guidelines necessary for managing information security risk. In addition to this

publication, the Special Publications developed by the Joint Task Force Transformation Initiative

supporting the unified information security framework for the federal government include:

• Special Publication 800-39, Managing Information Security Risk: Organization, Mission, and

     Information System View; 11

• Special Publication 800-37, Guide for Applying the Risk Management Framework to Federal

     Information Systems: A Security Life Cycle Approach;

• Special Publication 800-53, Recommended Security Controls for Federal Information

     Systems and Organizations; and

• Special Publication 800-53A, Guide for Assessing the Security Controls in Federal

     Information Systems and Organizations: Building Effective Security Assessment Plans.

The concepts and principles associated with the risk assessment processes and approaches

contained in this publication are intended to be similar to and consistent with the processes and

approaches described in International Organization for Standardization (ISO) and International

Electrotechnical Commission (IEC) standards. Extending the concepts and principles of these

international standards for the federal government and its contractors and promoting the reuse of

risk assessment results, reduces the burden on organizations that must conform to ISO/IEC and

NIST standards.

1.4 ORGANIZATION OF THIS SPECIAL PUBLICATION

The remainder of this special publication is organized as follows:

• Chapter Two describes: (i) the risk management process and how risk assessments are an

     integral part of that process; (ii) the basic terminology used in conducting risk assessments;
     and (iii) how risk assessments can be applied across the organization’s risk management tiers
     (i.e., organization level, mission/business process level, and information system level).

• Chapter Three describes the process of assessing information security risk including: (i) a

     high-level overview of the risk assessment process; (ii) the activities necessary to prepare for
     a risk assessment; (iii) the activities necessary to conduct a risk assessment; (iv) the activities
     necessary to communicate risk assessment results and share risk-related information across
     the organization; and (v) the activities necessary to maintain the results of a risk assessment.

• Supporting appendices provide additional risk assessment information including: (i) general

     references; (ii) a glossary of terms; (iii) acronyms; (iv) threat sources; (v) threat events; (vi)
     vulnerabilities and predisposing conditions; (vii) likelihood of threat event occurrence; (viii)
     organizational impact; (ix) risk determination; (x) informing risk response; (xi) essential
     information for risk assessment reports; and (xii) a summary of risk assessment tasks.

11

Special Publication 800-39 supersedes Special Publication 800-30 as the primary source for guidance on information

security risk management.

CHAPTER 1 PAGE 3

Special Publication 800-30 Guide for Conducting Risk Assessments


CHAPTER TWO

THE FUNDAMENTALS

BASIC CONCEPTS ASSOCIATED WITH RISK ASSESSMENTS

T his chapter describes the fundamental concepts associated with assessing information

       security risk within an organization including: (i) a high-level overview of the risk
       management process and the role risk assessments play in that process; (ii) the basic

concepts used in conducting risk assessments; and (iii) how risk assessments can be applied

across the organization’s risk management tiers. 12

2.1 RISK MANAGEMENT PROCESS

Risk assessment is a key component of a holistic, organization-wide risk management process as

defined in NIST Special Publication 800-39, Managing Information Security Risk: Organization,

Mission, and Information System View. Risk management processes include: (i) framing risk; (ii)

assessing risk; (iii) responding to risk; and (iv) monitoring risk. Figure 1 illustrates the four steps

in the risk management process—including the risk assessment step and the information and

communications flows necessary to make the process work effectively. 13

                                                       ASSESS
                       Information and                                        Information and
                    Communications Flows                                   Communications Flows
                                                       FRAME
                                 MONITOR                                   RESPOND
                   FIGURE 1: RISK ASSESSMENT WITHIN THE RISK MANAGEMENT PROCESS

The first component of risk management addresses how organizations frame risk or establish a

risk context—that is, describing the environment in which risk-based decisions are made. The

purpose of the risk framing component is to produce a risk management strategy that addresses

how organizations intend to assess risk, respond to risk, and monitor risk—making explicit and

12

NIST Special Publication 800-39 provides guidance on the three tiers in the risk management hierarchy including

Tier 1 (organization), Tier 2 (mission/business process), and Tier 3 (information system).

13

Many of the outputs from the risk framing step provide essential inputs to the risk assessment step and the associated

risk assessment process. These include, for example, the risk management strategy, organizational risk tolerance, risk

assessment methodology, assumptions, constraints, and mission/business priorities.

CHAPTER 2 PAGE 4

Special Publication 800-30 Guide for Conducting Risk Assessments


transparent the risk perceptions that organizations routinely use in making both investment and

operational decisions. The risk management strategy establishes a foundation for managing risk

and delineates the boundaries for risk-based decisions within organizations. 14

The second component of risk management addresses how organizations assess risk within the

context of the organizational risk frame. The purpose of the risk assessment component is to

identify: (i) threats to organizations (i.e., operations, assets, or individuals) or threats directed

through organizations against other organizations or the Nation; (ii) vulnerabilities internal and

external to organizations; 15 (iii) the harm (i.e., adverse impact) that may occur given the potential

for threats exploiting vulnerabilities; and (iv) the likelihood that harm will occur. The end result is

a determination of risk (i.e., typically a function of the degree of harm and likelihood of harm

occurring).

The third component of risk management addresses how organizations respond to risk once that

risk is determined based on the results of a risk assessment. The purpose of the risk response

component is to provide a consistent, organization-wide response to risk in accordance with the

organizational risk frame by: (i) developing alternative courses of action for responding to risk;

(ii) evaluating the alternative courses of action; (iii) determining appropriate courses of action

consistent with organizational risk tolerance; and (iv) implementing risk responses based on

selected courses of action.

The fourth component of risk management addresses how organizations monitor risk over time.

The purpose of the risk monitoring component is to: (i) determine the ongoing effectiveness of

risk responses (consistent with the organizational risk frame); (ii) identify risk-impacting changes

to organizational information systems and the environments in which the systems operate; 16 and

(iii) verify that planned risk responses are implemented and information security requirements

derived from and traceable to organizational missions/business functions, federal legislation,

directives, regulations, policies, standards, and guidelines are satisfied.

2.2 RISK ASSESSMENT

This publication focuses on the risk assessment component of risk management—providing a

step-by-step process for organizations on: (i) how to prepare for risk assessments; (ii) how to

conduct risk assessments; (iii) how to communicate risk assessment results to key organizational

personnel; and (iv) how to maintain the risk assessments over time. Risk assessments are not

simply one-time activities that provide permanent and definitive information for decision makers

to guide and inform responses to information security risks. Rather, organizations employ risk

assessments on an ongoing basis throughout the system development life cycle and across all of

the tiers in the risk management hierarchy—with the frequency of the risk assessments and the

resources applied during the assessments, commensurate with the expressly defined purpose and

scope of the assessments.

14

In the absence of an explicit or formal organizational risk management strategy, organizational resources (e.g., tools,

data repositories) and references (e.g., exemplary risk assessment reports) can be used to discern those aspects of the

organization’s approach to risk management that affect risk assessment.

15

Organizational vulnerabilities are not confined to information systems but can include, for example, vulnerabilities in

governance structures, mission/business processes, enterprise architecture, information security architecture, facilities,

equipment, system development life cycle processes, supply chain activities, and external service providers.

16

Environments of operation include, but are not limited to: the threat space; vulnerabilities; missions/business

functions; mission/business processes; enterprise and information security architectures; information technologies;

personnel; facilities; supply chain relationships; organizational governance/culture; procurement/acquisition processes;

organizational policies/procedures; organizational assumptions, constraints, risk tolerance, and priorities/trade-offs).

CHAPTER 2 PAGE 5

Special Publication 800-30 Guide for Conducting Risk Assessments


Risk assessments address the potential adverse impacts to organizational operations and assets,

individuals, other organizations, and the economic and national security interests of the United

States, arising from the operation and use of information systems and the information processed,

stored, and transmitted by those systems. Organizations conduct risk assessments to determine

risks that are common to the organization’s core missions/business functions, mission/business

processes, mission/business segments, common infrastructure/support services, or information

systems. Risk assessments can support a wide variety of risk-based decisions and activities by

organizational officials across all three tiers in the risk management hierarchy including, but not

limited to, the following:

• Development of an information security architecture;

• Definition of interconnection requirements for information systems (including systems

supporting mission/business processes and common infrastructure/support services);

• Design of security solutions for information systems and environments of operation including

selection of security controls, information technology products, suppliers/supply chain, and

contractors;

• Authorization (or denial of authorization) to operate information systems or to use security

controls inherited by those systems (i.e., common controls);

• Modification of missions/business functions and/or mission/business processes permanently,

or for a specific time frame (e.g., until a newly discovered threat or vulnerability is addressed,

until a compensating control is replaced);

• Implementation of security solutions (e.g., whether specific information technology products

or configurations for those products meet established requirements); and

• Operation and maintenance of security solutions (e.g., continuous monitoring strategies and

programs, ongoing authorizations).

Because organizational missions and business functions, supporting mission/business processes,

information systems, threats, and environments of operation tend to change over time, the validity

and usefulness of any risk assessment is bounded in time.

2.3 KEY RISK CONCEPTS

Risk is a measure of the extent to which an entity is threatened by a potential circumstance or

event, and is typically a function of: (i) the adverse impacts that would arise if the circumstance

or event occurs; and (ii) the likelihood of occurrence. Information security risks are those risks

that arise from the loss of confidentiality, integrity, or availability of information or information

systems and reflect the potential adverse impacts to organizational operations (i.e., mission,

functions, image, or reputation), organizational assets, individuals, other organizations, and the

Nation. Risk assessment is the process of identifying, estimating, and prioritizing information

security risks. Assessing risk requires the careful analysis of threat and vulnerability information

to determine the extent to which circumstances or events could adversely impact an organization

and the likelihood that such circumstances or events will occur.

A risk assessment methodology typically includes: (i) a risk assessment process (as described in

Chapter Three); (ii) an explicit risk model, defining key terms and assessable risk factors and the

relationships among the factors; (iii) an assessment approach (e.g., quantitative, qualitative, or

semi-qualitative), specifying the range of values those risk factors can assume during the risk

assessment and how combinations of risk factors are identified/analyzed so that values of those

CHAPTER 2 PAGE 6

Special Publication 800-30 Guide for Conducting Risk Assessments


factors can be functionally combined to evaluate risk; and (iv) an analysis approach (e.g., threat-

oriented, asset/impact-oriented, or vulnerability-oriented), describing how combinations of risk

factors are identified/analyzed to ensure adequate coverage of the problem space at a consistent

level of detail. Risk assessment methodologies are defined by organizations and are a component

of the risk management strategy developed during the risk framing step of the risk management

process.17 Figure 2 illustrates the fundamental components in organizational risk frames and the

relationships among those components.

      - Risk Assumptions                                                                   - Establishes Foundation
      - Risk Constraints                                                                     for Risk Management
      - Priorities and Tradeoffs         ORGANIZATIONAL RISK FRAME                         - Delineates Boundaries
      - Risk Tolerance                    RISK MANAGEMENT STRATEGY OR APPROACH               for Risk-Based Decisions
      - Uncertainty
                          DETERMINES                                                DETERMINES
                                            Risk Assessment Methodology
                 Risk Assessment                Risk              Assessment                Analysis
                     Process                    Model              Approach                 Approach
                         FIGURE 2: RELATIONSHIP AMONG RISK FRAMING COMPONENTS

Organizations can use a single risk assessment methodology or can employ multiple assessment

methodologies, with the selection of a specific methodology depending on, for example: (i) the

time frame for investment planning or for planning policy changes; (ii) the complexity/maturity

of organizational mission/business processes (by enterprise architecture segments); (iii) the phase

of the information systems in the system development life cycle; or (iv) the criticality/sensitivity 18

of the information and information systems supporting the core organizational missions/business

functions. By making explicit the risk model, the assessment approach, and the analysis approach

employed, and requiring as part of the assessment process, a rationale for the assessed values of

risk factors, organizations can increase the reproducibility and repeatability of risk assessments. 19

17

Risk assessment methodologies are influenced in large measure by the organizational risk management strategy.

However, risk assessment methodologies can be customized for each risk assessment based on the purpose and scope

of the assessment and the specific inputs organizations choose to make regarding the risk assessment process, risk

model, assessment approach, and analysis approach.

18

NIST Special Publication 800-60 discusses the concepts of criticality and sensitivity of information with respect to

security categorization.

19

Reproducibility refers to the ability of different experts to produce the same results from the same data. Repeatability

refers to the ability to repeat the assessment in the future, in a manner that is consistent with and hence comparable to

prior assessments—enabling the organization to identify trends.

CHAPTER 2 PAGE 7

Special Publication 800-30 Guide for Conducting Risk Assessments


2.3.1 Risk Models

Risk models define the risk factors to be assessed and the relationships among those factors.20

Risk factors are characteristics used in risk models as inputs to determining levels of risk in risk

assessments. Risk factors are also used extensively in risk communications to highlight what

strongly affects the levels of risk in particular situations, circumstances, or contexts. Typical risk

factors include threat, vulnerability, impact, likelihood, and predisposing condition. Risk factors

can be decomposed into more detailed characteristics (e.g., threats decomposed into threat

sources and threat events). 21 These definitions are important for organizations to document prior

to conducting risk assessments because the assessments rely upon well-defined attributes of

threats, vulnerabilities, impact, and other risk factors to effectively determine risk.

Threats

A threat is any circumstance or event with the potential to adversely impact organizational

operations and assets, individuals, other organizations, or the Nation through an information

system via unauthorized access, destruction, disclosure, or modification of information, and/or

denial of service. 22 Threat events are caused by threat sources. A threat source is characterized as:

(i) the intent and method targeted at the exploitation of a vulnerability; or (ii) a situation and

method that may accidentally exploit a vulnerability. In general, types of threat sources include:

(i) hostile cyber or physical attacks; (ii) human errors of omission or commission; (iii) structural

failures of organization-controlled resources (e.g., hardware, software, environmental controls);

and (iv) natural and man-made disasters, accidents, and failures beyond the control of the

organization. Various taxonomies of threat sources have been developed. 23 Some taxonomies of

threat sources use the type of adverse impacts as an organizing principle. Multiple threat sources

can initiate or cause the same threat event—for example, a provisioning server can be taken off-

line by a denial-of-service attack, a deliberate act by a malicious system administrator, an

administrative error, a hardware fault, or a power failure.

Risk models differ in the degree of detail and complexity with which threat events are identified.

When threat events are identified with great specificity, threat scenarios can be modeled,

developed, and analyzed. 24 Threat events for cyber or physical attacks are characterized by the

tactics, techniques, and procedures (TTPs) employed by adversaries. Understanding adversary-

based threat events gives organizations insights into the capabilities associated with certain threat

sources. In addition, having greater knowledge about who is carrying out the attacks gives

organizations a better understanding of what adversaries desire to gain by the attacks. Knowing

20

Documentation of a risk model includes: (i) identification of risk factors (definitions, descriptions, value scales); and

(ii) identification of the relationships among those risk factors (both conceptual relationships, presented descriptively,

and algorithms for combining values). The risk model presented in this section (and described in Appendices D-I) does

not specify algorithms for combining values.

21

A risk factor can have a single assessable characteristic (e.g., impact severity) or multiple characteristics, some of

which may be assessable and some of which may not be assessable. Characteristics which are not assessable typically

help determine what lower-level characteristics are relevant. For example, a threat source has a (characteristic) threat

type (using a taxonomy of threat types, which are nominal rather than assessable). The threat type determines which of

the more detailed characteristics are relevant (e.g., a threat source of type adversary has associated characteristics of

capabilities, intent, and targeting, which are directly assessable characteristics).

22

Organizations can choose to specify threat events as: (i) single events, actions, or circumstances; or (ii) sets and/or

sequences of related actions, activities, and/or circumstances.

23

     Appendix D provides an exemplary taxonomy of threat sources and associated threat characteristics.

24

A threat scenario is a set of discrete threat events, attributed to a specific threat source or multiple threat sources,

ordered in time, that result in adverse effects.

CHAPTER 2 PAGE 8

Special Publication 800-30 Guide for Conducting Risk Assessments


the intent and targeting aspects of a potential attack helps organizations narrow the set of threat

events that are most relevant to consider.

Threat shifting is the response of adversaries to perceived safeguards and/or countermeasures

(i.e., security controls), in which adversaries change some characteristic of their intent/targeting

in order to avoid and/or overcome those safeguards/countermeasures. Threat shifting can occur in

one or more domains including: (i) the time domain (e.g., a delay in an attack or illegal entry to

conduct additional surveillance); (ii) the target domain (e.g., selecting a different target that is not

as well protected); (iii) the resource domain (e.g., adding resources to the attack in order to reduce

uncertainty or overcome safeguards and/or countermeasures); or (iv) the attack planning/attack

method domain (e.g., changing the attack weapon or attack path). Threat shifting is a natural

consequence of a dynamic set of interactions between threat sources and types of organizational

assets targeted. With more sophisticated threat sources, it also tends to default to the path of least

resistance to exploit particular vulnerabilities, and the responses are not always predictable. In

addition to the safeguards and/or countermeasures implemented and the impact of a successful

exploit of an organizational vulnerability, another influence on threat shifting is the benefit to the

attacker. That perceived benefit on the attacker side can also influence how much and when threat

shifting occurs.

Vulnerabilities and Predisposing Conditions

A vulnerability is a weakness in an information system, system security procedures, internal

controls, or implementation that could be exploited by a threat source. 25 Most information system

vulnerabilities can be associated with security controls that either have not been applied (either

intentionally or unintentionally), or have been applied, but retain some weakness. However, it is

also important to allow for the possibility of emergent vulnerabilities that can arise naturally over

time as organizational missions/business functions evolve, environments of operation change,

new technologies proliferate, and new threats emerge. In the context of such change, existing

security controls may become inadequate and may need to be reassessed for effectiveness. The

tendency for security controls to potentially degrade in effectiveness over time reinforces the

need to maintain risk assessments during the entire system development life cycle and also the

importance of continuous monitoring programs to obtain ongoing situational awareness of the

organizational security posture.

Vulnerabilities are not identified only within information systems. Viewing information systems

in a broader context, vulnerabilities can be found in organizational governance structures (e.g.,

the lack of effective risk management strategies and adequate risk framing, poor intra-agency

communications, inconsistent decisions about relative priorities of missions/business functions, or

misalignment of enterprise architecture to support mission/business activities). Vulnerabilities can

also be found in external relationships (e.g., dependencies on particular energy sources, supply

chains, information technologies, and telecommunications providers), mission/business processes

(e.g., poorly defined processes or processes that are not risk-aware), and enterprise/information

security architectures (e.g., poor architectural decisions resulting in lack of diversity or resiliency

in organizational information systems). 26

25

The severity of a vulnerability is an assessment of the relative importance of mitigating/remediating the vulnerability.

The severity can be determined by the extent of the potential adverse impact if such a vulnerability is exploited by a

threat source. Thus, the severity of vulnerabilities, in general, is context-dependent.

26

NIST Special Publication 800-39 provides guidance on vulnerabilities at all three tiers in the risk management

hierarchy and the potential adverse impact that can occur if threats exploit such vulnerabilities.

CHAPTER 2 PAGE 9

Special Publication 800-30 Guide for Conducting Risk Assessments


In general, risks materialize as a result of a series of threat events, each of which takes advantage

of one or more vulnerabilities. Organizations define threat scenarios to describe how the events

caused by a threat source can contribute to or cause harm. Development of threat scenarios is

analytically useful, since some vulnerabilities may not be exposed to exploitation unless and until

other vulnerabilities have been exploited. Analysis that illuminates how a set of vulnerabilities,

taken together, could be exploited by one or more threat events is therefore more useful than the

analysis of individual vulnerabilities. In addition, a threat scenario tells a story, and hence is

useful for risk communication as well as for analysis.

In addition to vulnerabilities as described above, organizations also consider predisposing

conditions. A predisposing condition is a condition that exists within an organization, a mission

or business process, enterprise architecture, information system, or environment of operation,

which affects (i.e., increases or decreases) the likelihood that threat events, once initiated, result

in adverse impacts to organizational operations and assets, individuals, other organizations, or the

Nation. 27 Predisposing conditions include, for example, the location of a facility in a hurricane- or

flood-prone region (increasing the likelihood of exposure to hurricanes or floods) or a stand-alone

information system with no external network connectivity (decreasing the likelihood of exposure

to a network-based cyber attack). Vulnerabilities resulting from predisposing conditions that

cannot be easily corrected could include, for example, gaps in contingency plans, use of outdated

technologies, or weaknesses/deficiencies in information system backup and failover mechanisms.

In all cases, these types of vulnerabilities create a predisposition toward threat events having

adverse impacts on organizations. Vulnerabilities (including those attributed to predisposing

conditions) are part of the overall security posture of organizational information systems and

environments of operation that can affect the likelihood of occurrence of a threat event.

Likelihood

The likelihood of occurrence is a weighted risk factor based on an analysis of the probability that

a given threat is capable of exploiting a given vulnerability (or set of vulnerabilities). The

likelihood risk factor combines an estimate of the likelihood that the threat event will be initiated

with an estimate of the likelihood of impact (i.e., the likelihood that the threat event results in

adverse impacts). For adversarial threats, an assessment of likelihood of occurrence is typically

based on: (i) adversary intent; (ii) adversary capability; and (iii) adversary targeting. For other

than adversarial threat events, the likelihood of occurrence is estimated using historical evidence,

empirical data, or other factors. Note that the likelihood that a threat event will be initiated or will

occur is assessed with respect to a specific time frame (e.g., the next six months, the next year, or

the period until a specified milestone is reached). If a threat event is almost certain to be initiated

or occur in the (specified or implicit) time frame, the risk assessment may take into consideration

the estimated frequency of the event. The likelihood of threat occurrence can also be based on the

state of the organization (including for example, its core mission/business processes, enterprise

architecture, information security architecture, information systems, and environments in which

those systems operate)—taking into consideration predisposing conditions and the presence and

effectiveness of deployed security controls to protect against unauthorized/undesirable behavior,

detect and limit damage, and/or maintain or restore mission/business capabilities. The likelihood

of impact addresses the probability (or possibility) that the threat event will result in an adverse

impact, regardless of the magnitude of harm that can be expected.

27

The concept of predisposing condition is also related to the term susceptibility or exposure. Organizations are not

susceptible to risk (or exposed to risk) if a threat cannot exploit a vulnerability to cause adverse impact. For example,

organizations that do not employ database management systems are not vulnerable to the threat of SQL injections and

therefore, are not susceptible to such risk.

CHAPTER 2 PAGE 10

Special Publication 800-30 Guide for Conducting Risk Assessments


Organizations typically employ a three-step process to determine the overall likelihood of threat

events. First, organizations assess the likelihood that threat events will be initiated (for adversarial

threat events) or will occur (for non-adversarial threat events). Second, organizations assess the

likelihood that the threat events once initiated or occurring, will result in adverse impacts or harm

to organizational operations and assets, individuals, other organizations, or the Nation. Finally,

organizations assess the overall likelihood as a combination of likelihood of initiation/occurrence

and likelihood of resulting in adverse impact.

Threat-vulnerability pairing (i.e., establishing a one-to-one relationship between threats and

vulnerabilities) may be undesirable when assessing likelihood at the mission/business function

level, and in many cases, can be problematic even at the information system level due to the

potentially large number of threats and vulnerabilities. This approach typically drives the level of

detail in identifying threat events and vulnerabilities, rather than allowing organizations to make

effective use of threat information and/or to identify threats at a level of detail that is meaningful.

Depending on the level of detail in threat specification, a given threat event could exploit multiple

vulnerabilities. In assessing likelihoods, organizations examine vulnerabilities that threat events

could exploit and also the mission/business function susceptibility to events for which no security

controls or viable implementations of security controls exist (e.g., due to functional dependencies,

particularly external dependencies). In certain situations, the most effective way to reduce

mission/business risk attributable to information security risk is to redesign the mission/business

processes so there are viable work-arounds when information systems are compromised. Using

the concept of threat scenarios described above, may help organizations overcome some of the

limitations of threat-vulnerability pairing.

Impact

The level of impact from a threat event is the magnitude of harm that can be expected to result

from the consequences of unauthorized disclosure of information, unauthorized modification of

information, unauthorized destruction of information, or loss of information or information

system availability. Such harm can be experienced by a variety of organizational and non-

organizational stakeholders including, for example, heads of agencies, mission and business

owners, information owners/stewards, mission/business process owners, information system

owners, or individuals/groups in the public or private sectors relying on the organization—in

essence, anyone with a vested interest in the organization’s operations, assets, or individuals,

including other organizations in partnership with the organization, or the Nation. 28 Organizations

make explicit: (i) the process used to conduct impact determinations; (ii) assumptions related to

impact determinations; (iii) sources and methods for obtaining impact information; and (iv) the

rationale for conclusions reached with regard to impact determinations.

Organizations may explicitly define how established priorities and values guide the identification

of high-value assets and the potential adverse impacts to organizational stakeholders. If such

information is not defined, priorities and values related to identifying targets of threat sources and

associated organizational impacts can typically be derived from strategic planning and policies.

For example, security categorization levels indicate the organizational impacts of compromising

different types of information. Privacy Impact Assessments and criticality levels (when defined as

part of contingency planning or Mission/Business Impact Analysis) indicate the adverse impacts

of destruction, corruption, or loss of accountability for information resources to organizations.

28

The term organizational assets can have a very wide scope of applicability to include, for example, high-impact

programs, physical plant, mission-critical information systems, personnel, equipment, or a logically related group of

systems. More broadly, organizational assets represent any resource or set of resources which the organization values,

including intangible assets such as image or reputation.

CHAPTER 2 PAGE 11

Special Publication 800-30 Guide for Conducting Risk Assessments


Strategic plans and policies also assert or imply the relative priorities of immediate or near-term

mission/business function accomplishment and long-term organizational viability (which can be

undermined by the loss of reputation or by sanctions resulting from the compromise of sensitive

information). Organizations can also consider the range of effects of threat events including the

relative size of the set of resources affected, when making final impact determinations. Risk

tolerance assumptions may state that threat events with an impact below a specific value do not

warrant further analysis.

Risk

Figure 3 illustrates an example of a risk model including the key risk factors discussed above and

the relationship among the factors. Each of the risk factors is used in the risk assessment process

in Chapter Three.

                Threat                                   Threat                                                                       Adverse
                Source                  initiates        Event             exploits       Vulnerability          causing              Impact
                                with                                          with                                with
               with       Likelihood of                    with          Likelihood of     with Severity         Degree              with Risk
          Characteristics    Initiation               Sequence of          Success                                              as a combination of
       (e.g., Capability, Intent, and               actions, activities,                  In the context of                   Impact and Likelihood
        Targeting for Adversarial
                                                      or scenarios
                 Threats)
                                                                                          Predisposing
                                                                                                                                        producing
                                                                                           Conditions
                                                                                               with
               Inputs from Risk Framing Step                                              Pervasiveness
       (Risk Management Strategy or Approach)                                                                           ORGANIZATIONAL RISK
                                                                                                                       To organizational operations (mission,
                                                                                         Security Controls          functions, image, reputation), organizational
          Influencing and Potentially Modifying Key                                      Planned / Implemented      assets, individuals, other organizations, and
                        Risk Factors                                                                                                 the Nation.
                                                                                               with                                       Risk Framing
                                                                                          Effectiveness
                                         FIGURE 3: GENERIC RISK MODEL WITH KEY RISK FACTORS

As noted above, risk is a function of the likelihood of a threat event’s occurrence and potential

adverse impact should the event occur. This definition accommodates many types of adverse

impacts at all tiers in the risk management hierarchy described in Special Publication 800-39

(e.g., damage to image or reputation of the organization or financial loss at Tier 1; inability to

successfully execute a specific mission/business process at Tier 2; or the resources expended in

responding to an information system incident at Tier 3). It also accommodates relationships

among impacts (e.g., loss of current or future mission/business effectiveness due to the loss of

data confidentiality; loss of confidence in critical information due to loss of data or system

integrity; or unavailability or degradation of information or information systems). This broad

definition also allows risk to be represented as a single value or as a vector (i.e., multiple values),

in which different types of impacts are assessed separately. For purposes of risk communication,

risk is generally grouped according to the types of adverse impacts (and possibly the time frames

in which those impacts are likely to be experienced).

CHAPTER 2 PAGE 12

Special Publication 800-30 Guide for Conducting Risk Assessments


Aggregation

Organizations may use risk aggregation to roll up several discrete or lower-level risks into a more

general or higher-level risk. Organizations may also use risk aggregation to efficiently manage

the scope and scale of risk assessments involving multiple information systems and multiple

mission/business processes with specified relationships and dependencies among those systems

and processes. Risk aggregation, conducted primarily at Tiers 1 and 2 and occasionally at Tier 3,

assesses the overall risk to organizational operations, assets, and individuals given the set of

discrete risks. In general, for discrete risks (e.g., the risk associated with a single information

system supporting a well-defined mission/business process), the worst-case impact establishes an

upper bound for the overall risk to organizational operations, assets, and individuals. 29 One issue

for risk aggregation is that this upper bound for risk may fail to apply. For example, it may be

advantageous for organizations to assess risk at the organization level when multiple risks

materialize concurrently or when the same risk materializes repeatedly over a period of time. In

such situations, there is the possibility that the amount of overall risk incurred is beyond the risk

capacity of the organization, and therefore the overall impact to organizational operations and

assets (i.e., mission/business impact) goes beyond that which was originally assessed for each

specific risk.

When aggregating risk, organizations consider the relationship among various discrete risks. For

example, there may be a cause and effect relationship in that if one risk materializes, another risk

is more or less likely to materialize. If there is a direct or inverse relationship among discrete

risks, then the risks can be coupled (in a qualitative sense) or correlated (in a quantitative sense)

either in a positive or negative manner. Risk coupling or correlation (i.e., finding relationships

among risks that increase or decrease the likelihood of any specific risk materializing) can be

done at Tiers 1, 2, or 3.

Uncertainty

Uncertainty is inherent in the evaluation of risk, due to such considerations as: (i) limitations on

the extent to which the future will resemble the past; (ii) imperfect or incomplete knowledge of

the threat (e.g., characteristics of adversaries including tactics, techniques, and procedures); (iii)

undiscovered vulnerabilities in technologies or products; and (iv) unrecognized dependencies,

which can lead to unforeseen impacts. Uncertainty about the value of specific risk factors can also

be due to the step in the RMF or phase in the system development life cycle at which a risk

assessment is performed. For example, at early phases in the system development life cycle, the

presence and effectiveness of security controls may be unknown, while at later phases in the life

cycle, the cost of evaluating control effectiveness may outweigh the benefits in terms of more

fully informed decision making. Finally, uncertainty can be due to incomplete knowledge of the

risks associated with other information systems, mission/ business processes, services, common

infrastructures, and/or organizations. The degree of uncertainty in risk assessment results, due to

these different reasons, can be communicated in the form of the results (e.g., by expressing results

qualitatively, by providing ranges of values rather than single values for identified risks, or by

using a visual representations of fuzzy regions rather than points).

29

Security categorizations conducted in accordance with FIPS Publication 199 provide examples of worst-case impact

analyses (using the high water mark concept). This type of impact analysis provides an upper bound for risk when

applied to discrete situations within organizations.

CHAPTER 2 PAGE 13

Special Publication 800-30 Guide for Conducting Risk Assessments


2.3.2 Assessment Approaches

Risk, and its contributing factors, can be assessed in a variety of ways, including quantitatively,

qualitatively, or semi-quantitatively. Each risk assessment approach considered by organizations

has advantages and disadvantages. A preferred approach (or situation-specific set of approaches)

can be selected based on organizational culture and, in particular, attitudes toward the concepts of

uncertainty and risk communication. Quantitative assessments typically employ a set of methods,

principles, or rules for assessing risk based on the use of numbers—where the meanings and

proportionality of values are maintained inside and outside the context of the assessment. This

type of assessment most effectively supports cost-benefit analyses of alternative risk responses or

courses of action. However, the meaning of the quantitative results may not always be clear and

may require interpretation and explanation—particularly to explain the assumptions and

constraints on using the results. For example, organizations may typically ask if the numbers or

results obtained in the risk assessments are reliable or if the differences in the obtained values are

meaningful or insignificant. Additionally, the rigor of quantification is significantly lessened

when subjective determinations are buried within the quantitative assessments, or when

significant uncertainty surrounds the determination of values. The benefits of quantitative

assessments (in terms of the rigor, repeatability, and reproducibility of assessment results) can, in

some cases, be outweighed by the costs (in terms of the expert time and effort and the possible

deployment and use of tools required to make such assessments).

In contrast to quantitative assessments, qualitative assessments typically employ a set of methods,

principles, or rules for assessing risk based on nonnumerical categories or levels (e.g., very low,

low, moderate, high, very high). This type of assessment supports communicating risk results to

decision makers. However, the range of values in qualitative assessments is comparatively small

in most cases, making the relative prioritization or comparison within the set of reported risks

difficult. Additionally, unless each value is very clearly defined or is characterized by meaningful

examples, different experts relying on their individual experiences could produce significantly

different assessment results. The repeatability and reproducibility of qualitative assessments are

increased by the annotation of assessed values (e.g., this value is high because of the following

reasons) and by the use of tables or other well-defined functions to combine qualitative values.

Finally, semi-quantitative assessments typically employ a set of methods, principles, or rules for

assessing risk that uses bins, scales, or representative numbers whose values and meanings are not

maintained in other contexts. This type of assessment can provide the benefits of quantitative and

qualitative assessments. The bins (e.g., 0-15, 16-35, 36-70, 71-85, 86-100) or scales (e.g., 1-10)

translate easily into qualitative terms that support risk communications for decision makers (e.g.,

a score of 95 can be interpreted as very high), while also allowing relative comparisons between

values in different bins or even within the same bin (e.g., the difference between risks scored 70

and 71 respectively is relatively insignificant, while the difference between risks scored 36 and 70

is relatively significant). The role of expert judgment in assigning values is more evident than in a

purely quantitative approach. Moreover, if the scales or sets of bins provide sufficient granularity,

relative prioritization among results is better supported than in a purely qualitative approach. As

in a quantitative approach, rigor is significantly lessened when subjective determinations are

buried within assessments, or when significant uncertainty surrounds a determination of value. As

with the nonnumeric categories or levels used in a well-founded qualitative approach, each bin or

range of values needs to be clearly defined and/or characterized by meaningful examples.

Independent of the type of value scale selected, assessments make explicit the temporal element

of risk factors. For example, organizations can associate a specific time period with assessments

of likelihood of occurrence and assessments of impact severity.

CHAPTER 2 PAGE 14

Special Publication 800-30 Guide for Conducting Risk Assessments


2.3.3 Analysis Approaches

Analysis approaches differ with respect to the orientation or starting point of the risk assessment,

level of detail in the assessment, and how risks due to similar threat scenarios are treated. An

analysis approach can be: (i) threat-oriented; (ii) asset/impact-oriented; or (iii) vulnerability-

oriented. 30 A threat-oriented approach starts with the identification of threat sources and threat

events, and focuses on the development of threat scenarios; vulnerabilities are identified in the

context of threats, and for adversarial threats, impacts are identified based on adversary intent. An

asset/impact-oriented approach starts with the identification of impacts or consequences of

concern and critical assets, possibly using the results of a mission or business impact analyses 31

and identifying threat events that could lead to and/or threat sources that could seek those impacts

or consequences. A vulnerability-oriented approach starts with a set of predisposing conditions or

exploitable weaknesses/deficiencies in organizational information systems or the environments in

which the systems operate, and identifies threat events that could exercise those vulnerabilities

together with possible consequences of vulnerabilities being exercised. Each analysis approach

takes into consideration the same risk factors, and thus entails the same set of risk assessment

activities, albeit in different order. Differences in the starting point of the risk assessment can

potentially bias the results, causing some risks not to be identified. Therefore, identification of

risks from a second orientation (e.g., complementing a threat-oriented analysis approach with an

asset/impact-oriented analysis approach) can improve the rigor and effectiveness of the analysis.

In addition to the orientation of the analysis approach, organizations can apply more rigorous

analysis techniques (e.g., graph-based analyses) to provide an effective way to account for the

many-to-many relationships between: (i) threat sources and threat events (i.e., a single threat

event can be caused by multiple threat sources and a single threat source can cause multiple threat

events); (ii) threat events and vulnerabilities (i.e., a single threat event can exploit multiple

vulnerabilities and a single vulnerability can be exploited by multiple threat events); and (iii)

threat events and impacts/assets (i.e., a single threat event can affect multiple assets or have

multiple impacts, and a single asset can be affected by multiple threat events). 32 Rigorous analysis

approaches also provide a way to account for whether, in the time frame for which risks are

assessed, a specific adverse impact could occur (or a specific asset could be harmed) at most

once, or perhaps repeatedly, depending on the nature of the impacts and on how organizations

(including mission/business processes or information systems) recover from such adverse

impacts.

30

Organizations have great flexibility in choosing a particular analysis approach. The specific approach taken is driven

by different organizational considerations (e.g., the quality and quantity of information available with respect to threats,

vulnerabilities, and impacts/assets; the specific orientation carrying the highest priority for organizations; availability of

analysis tools emphasizing certain orientations; or a combination of the above).

31

A Business Impact Analysis (BIA) identifies high-value assets and adverse impacts with respect to the loss of

integrity or availability. DHS Federal Continuity Directive 2 provides guidance on BIAs at the organization and

mission/business process levels of the risk management hierarchy, respectively. NIST Special Publication 800-34

provides guidance on BIAs at the information system level of the risk management hierarchy.

32

For example, graph-based analysis techniques (e.g., functional dependency network analysis, attack tree analysis for

adversarial threats, fault tree analysis for other types of threats) provide ways to use specific threat events to generate

threat scenarios. Graph-based analysis techniques can also provide ways to account for situations in which one event

can change the likelihood of occurrence for another event. Attack and fault tree analyses, in particular, can generate

multiple threat scenarios that are nearly alike, for purposes of determining the levels of risk. With automated modeling

and simulation, large numbers of threat scenarios (e.g., attack/fault trees, traversals of functional dependency networks)

can be generated. Thus, graph-based analysis techniques include ways to restrict the analysis to define a reasonable

subset of all possible threat scenarios.

CHAPTER 2 PAGE 15

Special Publication 800-30 Guide for Conducting Risk Assessments


2.3.4 Effects of Organizational Culture on Risk Assessments

Organizations can differ in the risk models, assessment approaches, and analysis approaches that

they prefer for a variety of reasons. For example, cultural issues 33 can predispose organizations to

employ risk models that assume a constant value for one or more possible risk factors, so that

some factors that are present in other organizations’ models are not represented. Culture can also

predispose organizations to employ risk models that require detailed analyses using quantitative

assessments (e.g., nuclear safety). Alternately, organizations may prefer qualitative or semi-

quantitative assessment approaches. In addition to differences among organizations, differences

can also exist within organizations. For example, organizations can use coarse or high-level risk

models early in the system development life cycle to select security controls, and subsequently,

more detailed models to assess risk to given missions or business functions. Organizational risk

frames 34 determine which risk models, assessment approaches, and analysis approaches to use

under varying circumstances.

                                            THE USE OF RISK MODELS
     A single risk model (consisting of a fixed set of factors, a fixed assessment scale for each factor, and a
     fixed algorithm for combining factors) cannot meet the diverse needs of the organizations in the public
     and private sectors that rely on Special Publication 800-30. For example, while some organizations may
     emphasize adversarial threats and provide detailed information about such threats, other organizations
     may choose instead to focus on non-adversarial threats, providing greater detail for those types of
     threats and lesser detail for adversarial threats. Therefore, the risk models developed by organizations
     with different assumptions regarding threats will involve different factors as well as different levels of
     detail.
     Similarly, within a single organization or community of interest, different assessment scales may be
     appropriate for different missions/business functions, different categories of information systems, and/or
     for systems at different stages in the system development life cycle. For example, during an initial risk
     assessment performed when an information system is first being considered, the information available
     about threats and vulnerabilities may be nonspecific and highly uncertain. For such risk assessments, a
     qualitative assessment, using only a few factors, may be appropriate. By contrast, a risk assessment
     informed by a security controls assessment can be far more specific, and estimates can be made with
     greater fidelity. For such assessments, a semi-quantitative assessment using the 0-100 value scales
     may be more appropriate.
     The expectation set forth in Special Publications 800-39 and 800-30 is that each organization or
     community will define a risk model appropriate to its view of risk (i.e., formulas that reflect organizational
     or community views of which risk factors must be considered, which factors can be combined, which
     factors must be further decomposed, and how assessed values should be combined algorithmically).
     Special Publication 800-30 does identify risk factors that are common across a wide spectrum of risk
     models. In addition, by defining multiple aligned value scales, this publication provides a foundation for a
     consistent approach to estimating information security risk across the system development life cycle,
     without forcing assessments early in the life cycle to be more detailed than can be justified by available
     information.

33

     NIST Special Publication 800-39 describes how organizational culture affects risk management.

34

NIST Special Publication 800-39 defines an organization’s risk frame as the set of assumptions, constraints, risk

tolerances, priorities, and trade-offs that underpin the organization’s risk management strategy—establishing a solid

foundation for managing risk and bounding its risk-based decisions.

CHAPTER 2 PAGE 16

Special Publication 800-30 Guide for Conducting Risk Assessments


2.4 APPLICATION OF RISK ASSESSMENTS

As stated previously, risk assessments can be conducted at all three tiers in the risk management

hierarchy—organization level, mission/business process level, and information system level.

Figure 4 illustrates the risk management hierarchy defined in NIST Special Publication 800-39,

which provides multiple risk perspectives from the strategic level to the tactical level. Traditional

risk assessments generally focus at the Tier 3 level (i.e., information system level) and as a result,

tend to overlook other significant risk factors that may be more appropriately assessed at the Tier

1 or Tier 2 levels (e.g., exposure of a core mission/business function to an adversarial threat based

on information system interconnections).

                                             STRATEGIC RISK

- Traceability and Transparency of - Inter-Tier and Intra-Tier

    Risk-Based Decisions                                                         Communications
                                                  TIER 1

- Organization-Wide ORGANIZATION - Feedback Loop for

    Risk Awareness                                                               Continuous Improvement
                                                  TIER 2
                                        MISSION / BUSINESS PROCESSES
                                                  TIER 3
                                           INFORMATION SYSTEMS
                                             TACTICAL RISK
                                   FIGURE 4: RISK MANAGEMENT HIERARCHY

Risk assessments support risk response decisions at the different tiers of the risk management

hierarchy. At Tier 1, risk assessments can affect, for example: (i) organization-wide information

security programs, policies, procedures, and guidance; (ii) the types of appropriate risk responses

(i.e., risk acceptance, avoidance, mitigation, sharing, or transfer); (iii) investment decisions for

information technologies/systems; (iv) procurements; (v) minimum organization-wide security

controls; (vi) conformance to enterprise/security architectures; and (vii) monitoring strategies and

ongoing authorizations of information systems and common controls. At Tier 2, risk assessments

can affect, for example: (i) enterprise architecture/security architecture design decisions; (ii) the

selection of common controls; (iii) the selection of suppliers, services, and contractors to support

organizational missions/business functions; (iv) the development of risk-aware mission/business

processes; and (v) the interpretation of information security policies with respect to organizational

information systems and environments in which those systems operate. Finally, at Tier 3, risk

assessments can affect, for example: (i) design decisions (including the selection, tailoring, and

supplementation of security controls and the selection of information technology products for

organizational information systems); (ii) implementation decisions (including whether specific

information technology products or product configurations meet security control requirements);

and (iii) operational decisions (including the requisite level of monitoring activity, the frequency

of ongoing information system authorizations, and system maintenance decisions).

CHAPTER 2 PAGE 17

Special Publication 800-30 Guide for Conducting Risk Assessments


Risk assessments can also inform other risk management activities across the three tiers that are

not security-related. For example, at Tier 1, risk assessments can provide useful inputs to: (i)

operational risk determinations (including business continuity for organizational missions and

business functions); (ii) organizational risk determinations (including financial risk, compliance

risk, regulatory risk, reputation risk, and cumulative acquisition risk across large-scale projects);

and (iii) multiple-impact risk (including supply chain risk and risk involving partnerships). At

Tier 2, risk assessments can provide the same useful inputs to operational, organizational, and

multiple-impact risks, specific to mission/business processes. At Tier 3, risk assessments can

inform assessments of cost, schedule, and performance risks associated with information systems,

with information security experts coordinating with program managers, information system

owners, and authorizing officials. This type of coordination is essential within organizations in

order to eliminate silos and/or stove-piped activities that produce less than optimal or inefficient

information technology and security solutions—thus affecting the ability of organizations to carry

out assigned missions/business functions with maximum efficiency and cost-effectiveness.

It is important to note that information security risk contributes to non-security risks at each tier.

Thus, the results of a risk assessment at a given tier serve as inputs to, and are aligned with, non-

security risk management activities at that tier. 35 In addition, the results of risk assessments at

lower tiers serve as inputs to risk assessments at higher tiers. Risks can arise on different time

scales (e.g., the disclosure of information about current organizational operations can compromise

the effectiveness of those operations immediately, while the disclosure of strategic planning

information can compromise future operational capabilities). Risk response decisions can also

take effect in different time frames (e.g., changes in organizational policies or investment

strategies can sometimes require years to take effect, while configuration changes in an individual

system can often be implemented immediately). In general, the risk management process tends to

move more slowly at Tiers 1 and 2 than at Tier 3. This is due to how organizations typically

respond to risks that potentially affect widespread organizational operations and assets—where

such risk responses may need to address systemic or institutional issues. However, some Tier 1

decisions (e.g., newly discovered threats or vulnerabilities requiring the implementation of an

organization-wide mandate for mitigation) can involve immediate action.

2.4.1 Risk Assessments at the Organizational Tier

At Tier 1, risk assessments support organizational strategies, policies, guidance, and processes for

managing risk. Risk assessments conducted at Tier 1 focus on organizational operations, assets,

and individuals—comprehensive assessments across mission/business lines. For example, Tier 1

risk assessments may address: (i) the specific types of threats directed at organizations that may

be different from other organizations and how those threats affect policy decisions; (ii) systemic

weaknesses or deficiencies discovered in multiple organizational information systems capable of

being exploited by adversaries; (iii) the potential adverse impact on organizations from the loss or

compromise of organizational information (either intentionally or unintentionally); and (iv) the

use of new information and computing technologies such as mobile and cloud and the potential

effect on the ability of organizations to successfully carry out their missions/business operations

while using those technologies. Organization-wide assessments of risk can be based solely on the

assumptions, constraints, risk tolerances, priorities, and trade-offs established in the risk framing

step (i.e., derived primarily from Tier 1 activities). However, more realistic and meaningful risk

assessments are based on assessments conducted across multiple mission/business lines (i.e.,

derived primarily from Tier 2 activities). The ability of organizations to effectively use Tier 2 risk

35

In particular, risk assessment results support investment risk management. NIST Special Publication 800-65 provides

guidance on integrating information security into the Capital Planning and Investment Control (CPIC) process.

CHAPTER 2 PAGE 18

Special Publication 800-30 Guide for Conducting Risk Assessments


assessments as inputs to Tier 1 risk assessments is shaped by such considerations as: (i) the

similarity of organizational missions/business functions and mission/business processes; and (ii)

the degree of autonomy that organizational entities or subcomponents have with respect to parent

organizations. In decentralized organizations or organizations with varied missions/business

functions and/or environments of operation, expert analysis may be needed to normalize the

results from Tier 2 risk assessments. Finally, risk assessments at Tier 1 take into consideration the

identification of mission-essential functions from Continuity of Operations Plans (COOP) 36

prepared by organizations when determining the contribution of Tier 2 risks. Risk assessment

results at Tier 1 are communicated to organizational entities at Tier 2 and Tier 3.

2.4.2 Risk Assessments at the Mission/Business Process Tier

At Tier 2, risk assessments support the determination of mission/business process protection and

resiliency requirements, and the allocation of those requirements to the enterprise architecture as

part of mission/business segments (that support mission/business processes). This allocation is

accomplished through an information security architecture embedded within the enterprise

architecture. Tier 2 risk assessments also inform and guide decisions on whether, how, and when

to use information systems for specific mission/business processes, in particular for alternative

mission/business processing in the face of compromised information systems. Risk management

and associated risk assessment activities at Tier 2 are closely aligned with the development of

Business Continuity Plans (BCPs). Tier 2 risk assessments focus on mission/business segments,

which typically include multiple information systems, with varying degrees of criticality and/or

sensitivity with regard to core organizational missions/business functions. 37 Risk assessments at

Tier 2 can also focus on information security architecture as a critical component of enterprise

architecture to help organizations select common controls inherited by organizational information

systems at Tier 3. Risk assessment results produced at Tier 2 are communicated to and shared

with organizational entities at Tier 3 to help inform and guide the allocation of security controls

to information systems and environments in which those systems operate. Tier 2 risk assessments

also provide assessments of the security and risk posture of organizational mission/business

processes, which inform assessments of organizational risks at Tier 1. Thus, risk assessment

results at Tier 2 are routinely communicated to organizational entities at Tier 1 and Tier 3.

2.4.3 Risk Assessments at the Information System Tier

The Tier 2 context and the system development life cycle determine the purpose and define the

scope of risk assessment activities at Tier 3. While initial risk assessments (i.e., risk assessments

performed for the first time, rather than updating prior risk assessments) can be performed at any

phase in the system development life cycle, ideally these assessments should be performed in the

Initiation phase.38 In the Initiation phase, risk assessments evaluate the anticipated vulnerabilities

and predisposing conditions affecting the confidentiality, integrity, and availability of information

systems in the context of the planned environments of operation. Such assessments inform risk

response, enabling information system owners/program managers, together with mission/business

owners to make the final decisions about the security controls necessary based on the security

categorization and the environment of operation. Risk assessments are also conducted at later

phases in the system development life cycle, updating risk assessment results from earlier phases.

These risk assessment results for as-built or as-deployed information systems typically include

36

     NIST Special Publication 800-34 provides guidance on Information System Contingency Planning (ISCP).

37

The criticality of information systems to organizational missions/business functions may be identified in Business

Impact Analyses.

38

     NIST Special Publication 800-64 provides guidance for security considerations in the system development life cycle.

CHAPTER 2 PAGE 19

Special Publication 800-30 Guide for Conducting Risk Assessments


descriptions of vulnerabilities in the systems, an assessment of the risks associated with each

vulnerability (thereby updating the assessment of vulnerability severity), and corrective actions

that can be taken to mitigate the risks. The risk assessment results also include an assessment of

the overall risk to the organization and the information contained in the information systems by

operating the systems as evaluated. Risk assessment results at Tier 3 are communicated to

organizational entities at Tier 1 and Tier 2.

Risk assessment activities can be integrated with the steps in the Risk Management Framework

(RMF), as defined in NIST Special Publication 800-37. The RMF, in its system development life

cycle approach, operates primarily at Tier 3 with some application at Tiers 1 and 2, for example,

in the selection of common controls. Risk assessments can be tailored to each step in the RMF as

reflected in the purpose and scope of the assessments described in Section 3.1. Risk assessments

can also help determine the type of security assessments conducted during various phases of the

system development life cycle, the frequency of such assessments, the level of rigor applied

during the assessments, the assessment methods used, and the types/number of objects assessed.

The benefit of risk assessments conducted as part of the RMF can be realized from both initial

assessments and from updated assessments, as described below.

RMF Step 1 – Categorize

Organizations can use initial risk assessments to make security categorization decisions consistent

with the risk management strategy provided by the risk executive (function) and as a preparatory

step to security control selection. Conducting initial risk assessments brings together the available

information on threat sources, threat events, vulnerabilities, and predisposing conditions—thus

enabling organizations to use such information to categorize information and information systems

based on known and potential threats to and vulnerabilities in organizational information systems

and environments in which those systems operate. 39 Security categorization decisions inform the

selection of initial baseline security controls. Baseline security controls serve as the starting point

for organizational tailoring and supplementation activities described in the RMF Select step.

RMF Step 2 – Select

Organizations can use risk assessments to inform and guide the selection of security controls for

organizational information systems and environments of operation. After the initial security

control baseline is selected based on the security categorization process, the risk assessment

results help organizations: (i) apply appropriate tailoring guidance to adjust the controls based on

specific mission/business requirements, assumptions, constraints, priorities, trade-offs, or other

organization-defined conditions; and (ii) supplement the controls based on specific and credible

threat information. 40 Threat data from risk assessments provide critical information on adversary

capabilities, intent, and targeting that may affect the decisions by organizations regarding the

selection of additional security controls including the associated costs and benefits. Organizations

also consider risk assessment results when selecting common controls (typically a Tier 1 and Tier

2 activity). Risk is introduced if the implementation of a common control results in a single point

of failure because the control provides a security capability potentially inherited by multiple

information systems. As risk assessments are updated and refined, organizations use the results to

modify current security control selections based on the most recent threat and vulnerability

information available.

39

Even when an initial risk assessment is performed prior to the existence of an information system, vulnerabilities

may be present in certain technologies that will be used in the system, in common controls that will be inherited by the

system, or in the environment in which the system will operate.

40

     Supplementation will be incorporated into the tailoring process in NIST Special Publication 800-53, Revision 4.

CHAPTER 2 PAGE 20

Special Publication 800-30 Guide for Conducting Risk Assessments


RMF Step 3 – Implement

Organizations can use risk assessment results to identify alternative implementations of selected

security controls (e.g., considering vulnerabilities inherent in one security control implementation

versus another). Some information technology products, system components, or architectural

configurations may be more susceptible to certain types of threat sources; these susceptibilities

are subsequently addressed during security control development and implementation. In addition,

the strength of security mechanisms selected for implementation can take into consideration the

threat data from risk assessments. Individual configuration settings for information technology

products and system components can eliminate vulnerabilities identified during the analysis of

threat events. Risk assessment results also help inform decisions regarding the cost, benefit, and

risk trade-offs in using one type of technology versus another or how security controls are

effectively implemented in particular operational environments (e.g., when compensating controls

must be used due to the unavailability of certain technologies). As risk assessments are updated

and refined, organizations use the results to help determine if current security control

implementations remain effective given changes to the threat space.

RMF Step 4 – Assess

Organizations can use the results from security control assessments to inform risk assessments.

Security control assessments (documented in security assessment reports) identify vulnerabilities

in organizational information systems and the environments in which those systems operate.

Partial or complete failure of deployed security controls or the absence of planned controls

represents potential vulnerabilities that can be exploited by threat sources. Organizations use the

results from risk assessments to help determine the severity of such vulnerabilities which in turn,

can guide and inform organizational risk responses (e.g., prioritizing risk response activities,

establishing milestones for corrective actions).

RMF Step 5 – Authorize

Organizations can use risk assessment results to provide risk-related information to authorizing

officials. The risk responses carried out by organizations based on the risk assessments result in a

known security posture of organizational information systems and environments of operation.

Risk assessment results provide essential information to enable authorizing officials to make risk-

based decisions on whether to operate those systems in the current security posture or take actions

to provide additional security controls, thereby further reducing risk to organizational operations

and assets, individuals, other organizations, or the Nation.

RMF Step 6 – Monitor

Organizations can update risk assessments on an ongoing basis using security-related information

from organizational continuous monitoring processes. 41 Continuous monitoring processes

evaluate: (i) the effectiveness of security controls; (ii) changes to information systems and

environments of operation; and (iii) compliance to federal legislation, regulations, directives,

policies, standards, and guidance. As risk assessments are updated and refined, organizations use

the results to update the risk management strategy, thereby incorporating lessons learned into risk

management processes, improving responses to risk, and building a solid foundation of threat and

vulnerability information tailored to organizational missions/business functions.

41

NIST Special Publication 800-137 provides guidance on information security continuous monitoring for information

systems and organizations.

CHAPTER 2 PAGE 21

Special Publication 800-30 Guide for Conducting Risk Assessments


2.4.4 Risk Communications and Information Sharing

The risk assessment process entails ongoing communications and information sharing among

stakeholders to ensure that: (i) the inputs to such assessments are as accurate as possible; (ii)

intermediate assessment results can be used, for example, to support risk assessments at other

tiers; and (iii) the results are meaningful and useful inputs to the risk response step in the risk

management process. The manner and form in which risks are communicated are an expression

of organizational culture as well as legal, regulatory, and contractual constraints. To be effective,

communication of information security risks and other risk-related information produced during

the risk assessment is consistent with other forms of risk communication within organizations. To

maximize the benefit of risk assessments, organizations should establish policies, procedures, and

implementing mechanisms to ensure that the information produced during such assessments is

effectively communicated and shared across all three risk management tiers. 42 To reinforce the

importance of risk communication and information sharing within organizations, the input tables

in Appendices D, E, F, G, H, and I (i.e., threat sources, threat events, vulnerabilities, predisposing

conditions, likelihood, impact, and risk) and the recommended elements of a risk assessment

report (Appendix K) provide recommendations for risk communication/sharing among the tiers.

                                     TARGETED RISK ASSESSMENTS

Organizations can use targeted risk assessments, in which the scope is narrowly defined, to produce

answers to specific questions (e.g., what is the risk associated with relying on a given technology, how

should prior assessments of risk be revised based on incidents that have occurred, what new risks can

be identified based on knowledge about a newly discovered threat or vulnerability) or to inform specific

decisions (e.g., which risks should be managed at Tier 1 rather than Tier 2 or 3). Organizations may

consider assessing risk at Tier 1 and Tier 2 arising from a set of common threats and vulnerabilities

applicable to a wide range of organizational information systems. Assessing risk at Tiers 1 and 2 allows

organizations to reduce the number of threats and vulnerabilities considered at the individual information

system level and develop common risk responses for such organization-wide risks. This approach can

support the common control selection process for organizations and increase the efficiency and cost-

effectiveness of risk assessments across the organization.

With respect to all three tiers in the risk management hierarchy, there are no specific requirements

with regard to: (i) the formality, rigor, or level of detail that characterizes any particular risk assessment;

(ii) the methodologies, tools, and techniques used to conduct such risk assessments; or (iii) the format

and content of assessment results and any associated reporting mechanisms. Organizations have

maximum flexibility on how risk assessments are conducted, where such assessments are applied,

and how the results will be used. Organizations are encouraged to use the guidance in a manner that

most effectively and cost-effectively provides the information necessary to senior leaders/executives to

facilitate informed risk management decisions.

42

NIST Special Publications 800-117 and 800-126 provide guidance on the Security Content Automation Protocol

(SCAP) program. The SCAP program provides a standard, consistent way to communicate threat and vulnerability

information.

CHAPTER 2 PAGE 22

Special Publication 800-30 Guide for Conducting Risk Assessments


CHAPTER THREE

THE PROCESS

CONDUCTING RISK ASSESSMENTS WITHIN ORGANIZATIONS

T his chapter describes the process of assessing information security risk including: (i) a

        high-level overview of the risk assessment process; (ii) the activities necessary to prepare
        for risk assessments; (iii) the activities necessary to conduct effective risk assessments;

(iv) the activities necessary to communicate the assessment results and share risk-related

information; and (v) the activities necessary to maintain the results of risk assessments on an

ongoing basis. The risk assessment process 43 is composed of four steps: (i) prepare for the

assessment; (ii) conduct the assessment; (iii) communicate assessment results; and (iv) maintain

the assessment. 44 Each step is divided into a set of tasks. For each task, supplemental guidance

provides additional information for organizations conducting risk assessments. Risk tables and

exemplary assessment scales are listed in appropriate tasks and cross-referenced to additional,

more detailed information in the supporting appendices. Figure 5 illustrates the basic steps in the

risk assessment process and highlights the specific tasks for conducting the assessment.

                                                       Step 1: Prepare for Assessment
                                                      Derived from Organizational Risk Frame
                                                        Step 2: Conduct Assessment
                                                                 Expanded Task View
                       Step 3: Communicate Results                                                           Step 4: Maintain Assessment
                                                       Identify Threat Sources and Events
                                                           Identify Vulnerabilities and
                                                            Predisposing Conditions
                                                       Determine Likelihood of Occurrence
                                                         Determine Magnitude of Impact
                                                                 Determine Risk
                                                     FIGURE 5: RISK ASSESSMENT PROCESS

43

The intent of the process description in Chapter Three is to provide a common expression of the essential elements of

an effective risk assessment. It is not intended to limit organizational flexibility in conducting those assessments. Other

procedures can be implemented if organizations choose to do so, consistent with the intent of the process description.

44

The four-step risk assessment process described in this publication is consistent with the general risk assessment

process described in NIST Special Publication 800-39. The additional steps and tasks result from the need to provide

more detailed guidance to effectively carry out the specific activities associated with risk assessments.

CHAPTER 3 PAGE 23

Special Publication 800-30 Guide for Conducting Risk Assessments


3.1 PREPARING FOR THE RISK ASSESSMENT

The first step in the risk assessment process is to prepare for the assessment. The objective of this

step is to establish a context for the risk assessment. This context is established and informed by

the results from the risk framing step of the risk management process. Risk framing identifies, for

example, organizational information regarding policies and requirements for conducting risk

assessments, specific assessment methodologies to be employed, procedures for selecting risk

factors to be considered, scope of the assessments, rigor of analyses, degree of formality, and

requirements that facilitate consistent and repeatable risk determinations across the organization.

Organizations use the risk management strategy to the extent practicable to obtain information to

prepare for the risk assessment. Preparing for a risk assessment includes the following tasks:

• Identify the purpose of the assessment;

• Identify the scope of the assessment;

• Identify the assumptions and constraints associated with the assessment;

• Identify the sources of information to be used as inputs to the assessment; and

• Identify the risk model and analytic approaches (i.e., assessment and analysis approaches) to

     be employed during the assessment.

STEP 1: PREPARE FOR THE ASSESSMENT

IDENTIFY PURPOSE

TASK 1-1: Identify the purpose of the risk assessment in terms of the information that the assessment is

intended to produce and the decisions the assessment is intended to support.

Supplemental Guidance: The purpose of the risk assessment is explicitly stated in sufficient detail to ensure that the

assessment produces the appropriate information and supports the intended decisions. Organizations can provide

guidance on how to capture and present information produced during the risk assessment (e.g., using a defined

organizational template). Appendix K provides an exemplary template for a risk assessment report or the preferred

vehicle for risk communication. At Tier 3, risk assessments support: (i) authorization-related decisions throughout the

system development life cycle; (ii) reciprocity, particularly for reuse of assessment information; (iii) risk management

activities at Tier 2; and (iv) programmatic risk management activities throughout the system development life cycle. At

Tier 2, risk assessments enable organizations to: (i) understand dependencies and ways in which risks are accepted,

rejected, shared, transferred, or mitigated among information systems that support organizational mission/business

processes; (ii) support architectural and operational decisions for organizational risk responses (e.g., reducing

dependencies, limiting connectivity, enhancing or focusing monitoring, and enhancing information/system resiliency);

(iii) identify trends, so that proactive risk response strategies and courses of action for mission/business processes can

be defined; and (iv) support reciprocity, particularly to enable information sharing. At Tier 1, risk assessments: (i)

support the risk executive (function); and (ii) serve as a key input to the risk management strategy. In addition to these

common purposes, risk assessments may have a very specific purpose, to answer a specific question (e.g., What are the

risk implications of a newly discovered vulnerability or class of vulnerabilities, allowing new connectivity, outsourcing

a specific function, or adopting a new technology?). Risk assessment results from all tiers can be used by organizations

to inform the acquisition process by helping to ensure information security requirements are clearly specified.

The purpose of the risk assessment is influenced by whether the assessment is: (i) an initial assessment; or (ii) a

subsequent assessment initiated from the risk response or monitoring steps in the risk management process. For initial

assessments, the purpose can include, for example: (i) establishing a baseline assessment of risk; or (ii) identifying

threats and vulnerabilities, impacts to organizational operations and assets, individuals, other organizations, and the

Nation, and other risk factors to be tracked over time as part of risk monitoring. For a reassessment initiated from the

risk response step, the purpose can include, for example, providing a comparative analysis of alternative risk responses

or answering a specific question (see discussion of targeted risk assessments above). Alternatively, for a reassessment

initiated from the risk monitoring step, the purpose can include, for example, updating the risk assessment based on: (i)

ongoing determinations of the effectiveness of security controls in organizational information systems or environments

of operation; (ii) changes to information systems or environments of operation (e.g., changes to hardware, firmware,

software; changes to system-specific, hybrid, or common controls; changes to mission/business processes, common

CHAPTER 3 PAGE 24

Special Publication 800-30 Guide for Conducting Risk Assessments


infrastructure and support services, threats, vulnerabilities, or facilities); and (iii) results from compliance verification

activities. Reassessments can also be initiated by organizations due to incidents that have occurred (e.g., cyber attacks

compromising organizational information or information systems).

IDENTIFY SCOPE

TASK 1-2: Identify the scope of the risk assessment in terms of organizational applicability, time frame

supported, and architectural/technology considerations.

Supplemental Guidance: The scope of the risk assessment determines what will be considered in the assessment. Risk

assessment scope affects the range of information available to make risk-based decisions and is determined by the

organizational official requesting the assessment and the risk management strategy. Establishing the scope of the risk

assessment helps organizations to determine: (i) what tiers are addressed in the assessment; (ii) what parts of

organizations are affected by the assessment and how they are affected; (iii) what decisions the assessment results

support; (iv) how long assessment results are relevant; and (v) what influences the need to update the assessment.

Establishing the scope of the risk assessment helps to determine the form and content of the risk assessment report, as

well as the information to be shared as a result of conducting the assessment. At Tier 3, the scope of a risk assessment

can depend on the authorization boundary for the information system. Appendix K provides an example of the type of

information that may be included in a risk assessment report or the preferred vehicle for risk communication.

Organizational Applicability

Organizational applicability describes which parts of the organization or suborganizations are affected by the risk

assessment and the risk-based decisions resulting from the assessment (including the parts of the organization or

suborganizations responsible for implementing the activities and tasks related to the decisions). For example, the risk

assessment can inform decisions regarding information systems supporting a particular organizational mission/business

function or mission/business process. This can include decisions regarding the selection, tailoring, or supplementation

of security controls for specific information systems or the selection of common controls. Alternatively, the risk

assessment can inform decisions regarding a set of closely related missions/business functions or mission/business

processes. The scope of the risk assessment can include not only the missions/business functions, mission/business

processes, common infrastructure, or shared services on which the organization currently depends, but also those which

the organization might use under specific operational conditions.

Effectiveness Time Frame

Organizations determine how long the results of particular risk assessments can be used to legitimately inform risk-

based decisions. The time frame is usually related to the purpose of the assessment. For example, a risk assessment to

inform Tier 1 policy-related decisions needs to be relevant for an extended period of time since the governance process

for policy changes can be time-consuming in many organizations. A risk assessment conducted to inform a Tier 3

decision on the use of a compensating security control for an information system may be relevant only until the next

release of the information technology product providing the required security capability. Organizations determine the

useful life of risk assessment results and under what conditions the current assessment results become ineffective or

irrelevant. Risk monitoring can be used to help determine the effectiveness of time frames for risk assessments. In

addition to risk assessment results, organizations also consider the currency/timeliness (i.e., latency or age) of all types

of information/data used in assessing risk. This is of particular concern in information reuse and evaluating the validity

of assessment results.

Architectural/Technology Considerations

Organizations use architectural and technology considerations to clarify the scope of the risk assessment. For example,

at Tier 3, the scope of the risk assessment can be an organizational information system in its environment of operations.

This entails placing the information system in its architectural context, so that vulnerabilities in inherited controls can

be taken into consideration. Alternately, the scope of the assessment can be limited solely to the information system,

without consideration of inherited vulnerabilities. At Tier 2, the scope of the risk assessment can be defined in terms of

the mission/business segment architecture (e.g., including all systems, services, and infrastructures that support a

specific mission/function). For a targeted risk assessment at any tier, the specific question to be answered can restrict

the scope to a specific technology.

IDENTIFY ASSUMPTIONS AND CONSTRAINTS

TASK 1-3: Identify the specific assumptions and constraints under which the risk assessment is conducted.

Supplemental Guidance: As part of the risk framing step in the risk management process, organizations make explicit

the specific assumptions, constraints, risk tolerance, and priorities/trade-offs used within organizations to make

investment and operational decisions. This information guides and informs organizational risk assessments. When an

organizational risk management strategy cannot be cited, risk assessments identify and document assumptions and

constraints. Assumptions and constraints identified by organizations during the risk framing step and included as part

CHAPTER 3 PAGE 25

Special Publication 800-30 Guide for Conducting Risk Assessments


of the organizational risk management strategy need not be repeated in each individual risk assessment. By making

assumptions and constraints explicit, there is greater clarity in the risk model selected for the risk assessment, increased

reproducibility/repeatability of assessment results, and an increased opportunity for reciprocity among organizations.

Organizations identify assumptions in key areas relevant to the risk assessment including, for example: (i) threat

sources; (ii) threat events; (iii) vulnerabilities and predisposing conditions; (iv) potential impacts; (v) assessment and

analysis approaches; and (vi) which missions/business functions are primary. Organizations also identify constraints in

key areas relevant to the risk assessment including, for example: (i) resources available for the assessment; (ii) skills

and expertise required for the assessment; and (iii) operational considerations related to mission/business activities. For

example, organizational assumptions about how threats and impacts should be assessed can range from using worst-

case projections to using best-case projections or anything in between those endpoints. Finally, organizations consider

the uncertainty with regard to assumptions made or other information used in the risk assessment. Uncertainty in

assumptions can affect organizational risk tolerance. For example, assumptions based on a lack of specific or credible

information may reduce an organization’s risk tolerance because of the uncertainty influencing the assumptions. The

following sections provide some representative examples of areas where assumptions/constraints for risk assessments

may be identified.

Threat Sources

Organizations determine which types of threat sources are to be considered during risk assessments. Organizations

make explicit the process used to identify threats and any assumptions related to the threat identification process. If

such information is identified during the risk framing step and included as part of the organizational risk management

strategy, the information need not be repeated in each individual risk assessment. Risk assessments can address all

types of threat sources, a single broad threat source (e.g., adversarial), or a specific threat source (e.g., trusted insider).

Table D-2 provides a sample taxonomy of threat sources that can be considered by organizations in identifying

assumptions for risk assessments. Organizational assumptions about threat sources to consider inform Task 2-1.

Threat Events

Organizations determine which type of threat events are to be considered during risk assessments and the level of detail

needed to describe such events. Descriptions of threat events can be expressed in highly general terms (e.g., phishing,

distributed denial-of-service), in more descriptive terms using tactics, techniques, and procedures, or in highly specific

terms (e.g., the names of specific information systems, technologies, organizations, roles, or locations). In addition,

organizations consider: (i) what representative set of threat events can serve as a starting point for the identification of

the specific threat events in the risk assessment; and (ii) what degree of confirmation is needed for threat events to be

considered relevant for purposes of the risk assessment. For example, organizations may consider only those threat

events that have been observed (either internally or by organizations that are peers/partners) or all possible threat

events. Table E-2 and Table E-3 provide representative examples of adversarial and non-adversarial threat events at a

level of detail that can be used for risk assessments at all tiers. Greater detail can be found in multiple sources (e.g.,

Common Attack Pattern Enumeration and Classification [CAPEC]). Organizational assumptions about threat events to

consider and level of detail, inform Task 2-2.

Vulnerabilities and Predisposing Conditions

Organizations determine the types of vulnerabilities that are to be considered during risk assessments and the level of

detail provided in the vulnerability descriptions. Organizations make explicit the process used to identify vulnerabilities

and any assumptions related to the vulnerability identification process. If such information is identified during the risk

framing step and included as part of the organizational risk management strategy, the information need not be repeated

in each individual risk assessment. Vulnerabilities can be associated with organizational information systems (e.g.,

hardware, software, firmware, internal controls, and security procedures) or the environments in which those systems

operate (e.g., organizational governance, external relationships, mission/business processes, enterprise architectures,

information security architectures). Organizations also determine the types of predisposing conditions that are to be

considered during risk assessments including, for example, architectures and technologies employed, environments of

operation, and personnel. Table F-4 provides representative examples of such predisposing conditions. Organizational

assumptions about vulnerabilities and predisposing conditions to consider and level of detail, inform Task 2-3.

Likelihood

Organizations make explicit the process used to conduct likelihood determinations and any assumptions related to the

likelihood determination process. If such information is identified during the risk framing step and included as part of

the organizational risk management strategy, the information need not be repeated in each individual risk assessment.

Organizational assumptions about how to determine likelihood inform Task 2-4.

Impacts

Organizations determine potential adverse impacts in terms of organizational operations (i.e., missions, functions,

image, and reputation), organizational assets, individuals, other organizations, and the Nation. Organizations make

explicit the process used to conduct impact determinations and any assumptions related to the impact determination

process. If such information is identified during the risk framing step and included as part of the organizational risk

CHAPTER 3 PAGE 26

Special Publication 800-30 Guide for Conducting Risk Assessments


management strategy, the information need not be repeated in each individual risk assessment. Organizations address

impacts at a level of detail that includes, for example, specific mission/business processes or information resources

(e.g., information, personnel, equipment, funds, and information technology). Organizations may include information

from Business Impact Analyses with regard to providing impact information for risk assessments. Table H-2 provides

representative examples of types of impacts (i.e., harm) that can be considered by organizations. Organizational

assumptions about how to determine impacts and at what level of detail, inform Task 2-5.

Risk Tolerance and Uncertainty

Organizations determine the levels and types of risk that are acceptable. Risk tolerance is determined as part of the

organizational risk management strategy to ensure consistency across the organization. Organizations also provide

guidance on how to identify reasons for uncertainty when risk factors are assessed, since uncertainty in one or more

factors will propagate to the resulting evaluation of level of risk, and how to compensate for incomplete, imperfect, or

assumption-dependent estimates. Consideration of uncertainty is especially important when organizations consider

advanced persistent threats (APT) since assessments of the likelihood of threat event occurrence can have a great

degree of uncertainty. To compensate, organizations can take a variety of approaches to determine likelihood, ranging

from assuming the worst-case likelihood (certain to happen sometime in the foreseeable future) to assuming that if an

event has not been observed, it is unlikely to happen. Organizations also determine what levels of risk (combination of

likelihood and impact) indicate that no further analysis of any risk factors is needed.

Analytic Approach

Risk assessments include both assessment approaches (i.e., quantitative, qualitative, semi-quantitative) and analysis

approaches (i.e., threat-oriented, asset/impact-oriented, vulnerability-oriented). Together, the assessment and analysis

approaches form the analytic approach for the risk assessment. Organizations determine the level of detail and in what

form, threats are analyzed including the level of granularity to describe threat events or threat scenarios. Different

analysis approaches can lead to different levels of detail in characterizing adverse events for which likelihoods are

determined. For example, an adverse event could be characterized in several ways (with increasing levels of detail): (i)

a threat event (for which the likelihood is determined by taking the maximum overall threat sources); (ii) a pairing of a

threat event and a threat source; or (iii) a detailed threat scenario/attack tree. In general, organizations can be expected

to require more detail for highly critical missions/business functions, common infrastructures, or shared services on

which multiple missions or business functions depend (as common points of failure), and information systems with

high criticality or sensitivity. Mission/business owners may amplify this guidance for risk hot spots (information

systems, services, or critical infrastructure components of particular concern) in mission/business segments.

IDENTIFY INFORMATION SOURCES

TASK 1-4: Identify the sources of descriptive, threat, vulnerability, and impact information to be used in the

risk assessment.

Supplemental Guidance: Descriptive information enables organizations to be able to determine the relevance of threat

and vulnerability information. At Tier 1, descriptive information can include, for example, the type of risk management

and information security governance structures in place within organizations and how the organization identifies and

prioritizes critical missions/business functions. At Tier 2, descriptive information can include, for example, information

about: (i) organizational mission/business processes, functional management processes, and information flows; (ii)

enterprise architecture, information security architecture, and the technical/process flow architectures of the systems,

common infrastructures, and shared services that fall within the scope of the risk assessment; and (iii) the external

environments in which organizations operate including, for example, the relationships and dependencies with external

providers. Such information is typically found in architectural documentation (particularly documentation of high-level

operational views), business continuity plans, and risk assessment reports for organizational information systems,

common infrastructures, and shared services that fall within the scope of the risk assessment. At Tier 3, descriptive

information can include, for example, information about: (i) the design of and technologies used in organizational

information systems; (ii) the environment in which the systems operate; (iii) connectivity to and dependency on other

information systems; and (iv) dependencies on common infrastructures or shared services. Such information is found in

system documentation, contingency plans, and risk assessment reports for other information systems, infrastructures,

and services.

Sources of information as described in Tables D-1, E-1, F-1, H-1, and I-1 can be either internal or external to

organizations. Internal sources of information that can provide insights into both threats and vulnerabilities can include,

for example, risk assessment reports, incident reports, security logs, trouble tickets, and monitoring results. Note that

internally, information from risk assessment reports at one tier can serve as input to risk assessments at other tiers.

Mission/business owners are encouraged to identify not only common infrastructure and/or support services they

depend on, but also those they might use under specific operational circumstances. External sources of threat

information can include cross-community organizations (e.g., US Computer Emergency Readiness Team [US-CERT],

sector partners (e.g., Defense Industrial Base [DIB] using the DoD-Defense Industrial Base Collaborative Information

CHAPTER 3 PAGE 27

Special Publication 800-30 Guide for Conducting Risk Assessments


Sharing Environment [DCISE], Information Sharing and Analysis Centers [ISACs] for critical infrastructure sectors),

research and nongovernmental organizations (e.g. Carnegie Mellon University, Software Engineering Institute-CERT),

and security service providers). Organizations using external sources, consider the timeliness, specificity, and relevance

of threat information. Similar to sources of threat information, sources of vulnerability information can also be either

internal or external to organizations (see Table F-1). Internal sources can include, for example, vulnerability assessment

reports. External sources of vulnerability information are similar to the sources identified above for threat information.

As described in Table F-1, information about predisposing conditions can be found in a variety of sources including,

for example, descriptions of information systems, environments of operation, shared services, common infrastructures,

and enterprise architecture. As described in Table H-1, sources of impact information can include, for example,

mission/business impact analyses, information system component inventories, and security categorizations. Security

categorization constitutes a determination of the potential impacts should certain events occur which jeopardize the

information and information systems needed by the organization to accomplish its assigned missions, protect its assets,

fulfill its legal responsibilities, maintain its day-to-day functions, and protect individuals. Security categories are to be

used in conjunction with vulnerability and threat information in assessing the risk to organizational operations and

assets, individuals, other organizations, and the Nation. Security categories constitute an initial summary of impact in

terms of failures to meet the security objectives of confidentiality, integrity, and availability, and are informed by the

types of harm presented in Table H-2.

IDENTIFY RISK MODEL AND ANALYTIC APPROACH

TASK 1-5: Identify the risk model and analytic approach to be used in the risk assessment.

Supplemental Guidance: Organizations define one or more risk models for use in conducting risk assessments (see

Section 2.3.1) and identify which model is to be used for the risk assessment. To facilitate reciprocity of assessment

results, organization-specific risk models include, or can be translated into, the risk factors (i.e., threat, vulnerability,

impact, likelihood, and predisposing condition) defined in the appendices. Organizations also identify the specific

analytic approach to be used for the risk assessment including the assessment approach (i.e., quantitative, qualitative,

semi-quantitative) and the analysis approach (i.e., threat-oriented, asset/impact-oriented, vulnerability-oriented). For

each assessable risk factor, the appendices include three assessment scales (one qualitative and two semi-quantitative

scales) with correspondingly different representations. Organizations typically define (or select and tailor from the

appendices) the assessment scales to be used in their risk assessments, annotating with organizationally-meaningful

examples for specific values and defining break points between bins for semi-quantitative approaches. In addition,

mission/business owners can provide further annotations with mission/business-specific examples. Organizations can

identify different assessment scales to be used in different circumstances. For example, for low-impact information

systems, organizations could use qualitative values, while for moderate- and high-impact systems, the most granular

semi-quantitative values (0-100) could be used. As discussed in Special Publication 800-39, Task 1-1, Risk

Assumptions, organizations vary in the relative weights applied to risk factors. Therefore, this guideline does not

specify algorithms for combining semi-quantitative values. Organization-specific risk models include algorithms (e.g.,

formulas, tables, rules) for combining risk factors. If an organization-specific risk model is not provided in the risk

management strategy as part of the risk framing step, then part of this task is to specify the algorithms for combining

values. Algorithms for combining risk factors reflect organizational risk tolerance (see the supplemental guidance to

Task 2-4 for examples). Organization-specific risk models are refined as part of preparation for a risk assessment by: (i)

identifying the risk model and the rationale for using it (when multiple organization-specific risk models are provided);

(ii) providing additional examples for values of risk factors; and (iii) identifying any assessment-specific algorithms

(e.g., algorithms specific to the use of an attack graph analysis technique). In the absence of pre-existing organization-

specific risk models or analytic approaches defined in the organizational risk management strategy, the risk model and

analytic approaches to be used in the risk assessment are defined and documented in this task.

                    Summary of Key Activities – Preparing for Risk Assessments
       •    Identify the purpose of the risk assessment.
       •    Identify the scope of the risk assessment.
       •    Identify the assumptions and constraints under which the risk assessment is conducted.
       •    Identify sources of threat, vulnerability, and impact information to be used in the risk
            assessment (see Tables D-1, E-1, F-1, H-1, and I-1 as tailored by the organization).
       •    Define or refine the risk model, assessment approach, and analysis approach to be used in
            the risk assessment.

CHAPTER 3 PAGE 28

Special Publication 800-30 Guide for Conducting Risk Assessments


3.2 CONDUCTING THE RISK ASSESSMENT

The second step in the risk assessment process is to conduct the assessment. The objective of this

step is to produce a list of information security risks that can be prioritized by risk level and used

to inform risk response decisions. To accomplish this objective, organizations analyze threats and

vulnerabilities, impacts and likelihood, and the uncertainty associated with the risk assessment

process. This step also includes the gathering of essential information as a part of each task and is

conducted in accordance with the assessment context established in the Prepare step of the risk

assessment process. The expectation for risk assessments is to adequately cover the entire threat

space in accordance with the specific definitions, guidance, and direction established during the

Prepare step. However, in practice, adequate coverage within available resources may dictate

generalizing threat sources, threat events, and vulnerabilities to ensure full coverage and assessing

specific, detailed sources, events, and vulnerabilities only as necessary to accomplish risk

assessment objectives. Conducting risk assessments includes the following specific tasks:

• Identify threat sources that are relevant to organizations;

• Identify threat events that could be produced by those sources;

• Identify vulnerabilities within organizations that could be exploited by threat sources through

     specific threat events and the predisposing conditions that could affect successful
     exploitation;

• Determine the likelihood that the identified threat sources would initiate specific threat events

     and the likelihood that the threat events would be successful;

• Determine the adverse impacts to organizational operations and assets, individuals, other

     organizations, and the Nation resulting from the exploitation of vulnerabilities by threat
     sources (through specific threat events); and

• Determine information security risks as a combination of likelihood of threat exploitation of

     vulnerabilities and the impact of such exploitation, including any uncertainties associated
     with the risk determinations.

The specific tasks are presented in a sequential manner for clarity. However, in practice, some

iteration among the tasks is both necessary and expected. 45 Depending on the purpose of the risk

assessment, organizations may find reordering the tasks advantageous. 46 Whatever adjustments

organizations make to the tasks described below, risk assessments should meet the stated purpose,

scope, assumptions, and constraints established by the organizations initiating the assessments.

To assist organizations in executing the individual tasks in the risk assessment process, a set of

templates is provided in Appendices D through I. These appendices provide useful information

for organizations in assessing risk and can also be used to record assessment results produced

during essential calculations and analyses. The templates are exemplary and can be tailored by

organizations in accordance with specific organizational mission/business requirements. The use

of the templates is not required in order to conduct risk assessments.

45

For example, as vulnerabilities are identified, additional threat events might be identified by asking how the newly

identified vulnerabilities could be exploited. If organizations identify vulnerabilities first and then define threat events,

there may be some events that do not map cleanly to vulnerabilities but do map to predisposing conditions.

46

For example, the risk assessment could start with an identification of mission/business impacts at Tiers 1 and 2 using

common techniques such as Mission Impact Analyses, Business Impact Analyses, Mission/Business Thread Analyses,

or Business Continuity Analyses. The results of such analyses could enable risk assessors to focus attention on, and

perform more detailed analysis of, potential threats to critical information systems, databases, communications links, or

other assets.

CHAPTER 3 PAGE 29

Special Publication 800-30 Guide for Conducting Risk Assessments


STEP 2: CONDUCT THE ASSESSMENT

IDENTIFY THREAT SOURCES

TASK 2-1: Identify and characterize threat sources of concern, including capability, intent, and targeting

characteristics for adversarial threats and range of effects for non-adversarial threats.

Supplemental Guidance: Organizations identify threat sources of concern and determine the characteristics associated

with those threat sources. For adversarial threat sources, assess the capabilities, intentions, and targeting associated

with the threat sources. For non-adversarial threat sources, assess the potential range of effects from the threat sources.

The risk management strategy and the results of the Prepare step provide organizational direction and guidance for

conducting threat source identification and characterization including, for example: (i) sources for obtaining threat

information; (ii) threat sources to consider (by type/name); (iii) threat taxonomy to be used; and (iv) the process for

identifying which threat sources are of concern for the risk assessment. As identified in Task 1-3, organizations make

explicit any assumptions concerning threat sources including decisions regarding the identification of threat sources

when specific and credible threat information is unavailable. Organizations can also view adversarial threat sources

from a broad-based perspective, considering the time such threat sources may have to exploit identified organizational

vulnerabilities, the scale of the attack, and the potential use of multiple attack vectors. The identification and

characterization of Advanced Persistent Threats (APTs) can involve considerable uncertainty. Organizations annotate

such threat sources with appropriate rationale and references (and providing classifications as necessary).

Appendix D provides a set of exemplary tables for use in identifying threat sources:

• Table D-1 provides a set of exemplary inputs to the threat source identification task;

• Table D-2 provides an exemplary taxonomy that can be used to identify and characterize threat sources;

• Tables D-3, D-4, and D-5 provide exemplary assessment scales to assess the risk factors (i.e., characteristics) of

adversarial threat sources with regard to capability, intent, and targeting;

• Table D-6 provides an exemplary assessment scale for assessing the ranges of effects from threat events initiated by

non-adversarial threat sources; and

• Tables D-7 and D-8 provide templates for summarizing and documenting the results of threat source identification

and characterization.

If a particular type of threat source is outside the scope of the risk assessment or not relevant to the organization, the

information in Tables D-7 and D-8 can be truncated accordingly. The information produced in Task 2-1 provides threat

source inputs to the risk tables in Appendix I.

                                    Summary of Key Activities – Task 2-1
       •    Identify threat source inputs (see Table D-1, as tailored by the organization).
       •    Identify threat sources (see Table D-2, as tailored by the organization).
       •    Determine if threat sources are relevant to the organization and in scope (see Table D-1, as
            tailored by the organization).
       •    Create or update the assessment of threat sources (see Table D-7 for adversarial threat
            sources and Table D-8 for non-adversarial threat sources, as tailored by the organization).
            •    For relevant adversarial threat sources:
                 -    Assess adversary capability (see Table D-3, as tailored by the organization).
                 -    Assess adversary intent (see Table D-4, as tailored by the organization).
                 -    Assess adversary targeting (see Table D-5, as tailored by the organization).
            •    For relevant non-adversarial threat sources:
                 -     Assess the range of effects from threat sources (see Table D-6, as tailored by the
                       organization).

CHAPTER 3 PAGE 30

Special Publication 800-30 Guide for Conducting Risk Assessments


IDENTIFY THREAT EVENTS

TASK 2-2: Identify potential threat events, relevance of the events, and the threat sources that could initiate

the events.

Supplemental Guidance: Threat events are characterized by the threat sources that could initiate the events, and for

adversarial events, the TTPs used to carry out attacks. Organizations define these threat events with sufficient detail to

accomplish the purpose of the risk assessment. At Tier 1, threat events that could affect the organizational level are of

particular interest. At Tier 2, threat events that cross or span information system boundaries, exploit functional

dependencies or connectivity among systems, or affect mission/business owners, are of particular interest. At Tier 3,

threat events that can be described in terms of specific information systems, technologies, or environments of operation

are of particular interest. Multiple threat sources can initiate a single threat event. Conversely, a single threat source can

potentially initiate any of multiple threat events. Therefore, there can be a many-to-many relationship among threat

events and threat sources that can potentially increase the complexity of the risk assessment. To enable effective use

and communication of risk assessment results, organizations tailor the general descriptions of threat events in Tables E-

2 and E-3 to identify how each event could potentially harm organizational operations (including mission, functions,

image, or reputation) and assets, individuals, other organizations, or the Nation. For each threat event identified,

organizations determine the relevance of the event. Table E-4 provides a range of values for relevance of threat events.

The values selected by organizations have a direct linkage to organizational risk tolerance. The more risk averse, the

greater the range of values considered. Organizations accepting greater risk or having a greater risk tolerance are more

likely to require substantive evidence before giving serious consideration to threat events. If a threat event is deemed to

be irrelevant, no further consideration is given. For relevant threat events, organizations identify all potential threat

sources that could initiate the events. For use in Task 2-4, organizations can identify each pairing of threat source and

threat event separately since the likelihood of threat initiation and success could be different for each pairing.

Alternatively, organizations can identify the set of all possible threat sources that could potentially initiate a threat

event.

Appendix E provides a set of exemplary tables for use in identifying threat events:

• Table E-1 provides a set of exemplary inputs to the threat event identification task;

• Table E-2 provides representative examples of adversarial threat events expressed as TTPs;

• Table E-3 provides representative examples of non-adversarial threat events;

• Table E-4 provides exemplary values for the relevance of threat events to organizations; and

• Table E-5 provides a template for summarizing and documenting the results of threat event identification.

The information produced in Task 2-2 provides threat event inputs to the risk tables in Appendix I.

                                     Summary of Key Activities – Task 2-2
       •      Identify threat event inputs (see Table E-1, as tailored by the organization).
       •      Identify threat events (see Table E-2 for adversarial threat events and Table E-3 for non-
              adversarial threat events, as tailored by the organization); create or update Table E-5.
       •      Identify threat sources that could initiate the threat events (see Table D-7 and Table D-8, as
              tailored by the organization); update Table E-5.
       •      Assess the relevance of threat events to the organization (see Table E-4, as tailored by the
              organization); update Table E-5.
       •      Update Columns 1-6 in Table I-5 for adversarial risk (see Table E-5 and Table D-7); or update
              Columns 1-4 in Table I-7 for non-adversarial risk (see Table E-5 and Table D-8).

CHAPTER 3 PAGE 31

Special Publication 800-30 Guide for Conducting Risk Assessments


IDENTIFY VULNERABILITIES AND PREDISPOSING CONDITIONS

TASK 2-3: Identify vulnerabilities and predisposing conditions that affect the likelihood that threat events of

concern result in adverse impacts.

Supplemental Guidance: The primary purpose of vulnerability assessments is to understand the nature and degree to

which organizations, mission/business processes, and information systems are vulnerable to threat sources identified in

Task 2-1 and the threat events identified in Task 2-2 that can be initiated by those threat sources. Vulnerabilities at Tier

1 can be pervasive across organizations and can have wide-ranging adverse impacts if exploited by threat events. For

example, organizational failure to consider supply chain activities can result in organizations acquiring subverted

components that adversaries could exploit to disrupt organizational missions/business functions or to obtain sensitive

organizational information. Vulnerabilities at Tier 2 can be described in terms of organizational mission/business

processes, enterprise architecture, the use of multiple information systems, or common infrastructures/shared services.

At Tier 2, vulnerabilities typically cross or span information system boundaries. Vulnerabilities at Tier 3 can be

described in terms of the information technologies employed within organizational information systems, the

environments in which those systems operate, and/or the lack of or weaknesses in system-specific security controls.

There is potentially a many-to-many relationship between threat events and vulnerabilities. Multiple threat events can

exploit a single vulnerability, and conversely, multiple vulnerabilities can be exploited by a single threat event. The

severity of a vulnerability is an assessment of the relative importance of mitigating such a vulnerability. Initially, the

extent to which mitigation is unplanned can serve as a surrogate for vulnerability severity. Once the risks associated

with a particular vulnerability have been assessed, the impact severity and exposure of the vulnerability given the

security controls implemented and other vulnerabilities can be taken into consideration in assessing vulnerability

severity. Assessments of vulnerability severity support risk response. Vulnerabilities can be identified at varying

degrees of granularity and specificity. The level of detail provided in any particular vulnerability assessment is

consistent with the purpose of the risk assessment and the type of inputs needed to support follow-on likelihood and

impact determinations.

Due to the ever-increasing size and complexity of organizations, mission/business processes, and the information

systems supporting those processes, the number of vulnerabilities tends to be large and can increase the overall

complexity of the analysis. Therefore, organizations have the option of using the vulnerability identification task to

understand the general nature of the vulnerabilities (including scope, number, and type) relevant to the assessment (see

Task 1-3) and performing a cataloging of specific vulnerabilities as necessary to do so. Organizations determine which

vulnerabilities are relevant to which threat events in order to reduce the space of potential risks to be assessed. In

addition to identifying vulnerabilities, organizations also identify any predisposing conditions which may affect

susceptibility to certain vulnerabilities. Predisposing conditions that exist within organizations (including

mission/business processes, information systems, and environments of operation) can contribute to (i.e., increase or

decrease) the likelihood that one or more threat events, once initiated by threat sources, result in adverse impacts to

organizational operations, organizational assets, individuals, other organizations, or the Nation. Organizations

determine which predisposing conditions are relevant to which threat events in order to reduce the space of potential

risks to be assessed. Organizations assess the pervasiveness of predisposing conditions to support determination of the

tier(s) at which risk response could be most effective.

Appendix F provides a set of exemplary tables for use in identifying vulnerabilities and predisposing conditions:

• Table F-1 provides a set of exemplary inputs to the vulnerability and predisposing condition identification task;

• Table F-2 provides an exemplary assessment scale for assessing the severity of identified vulnerabilities;

• Table F-3 provides a template for summarizing/documenting the results of vulnerability identification;

• Table F-4 provides an exemplary taxonomy that can be used to identify and characterize predisposing conditions;

• Table F-5 provides an exemplary assessment scale for assessing the pervasiveness of predisposing conditions; and

• Table F-6 provides a template for summarizing/documenting the results of identifying predisposing conditions.

The information produced in Task 2-3 provides vulnerability and predisposing condition inputs to the risk tables in

Appendix I.

CHAPTER 3 PAGE 32

Special Publication 800-30 Guide for Conducting Risk Assessments


                                     Summary of Key Activities – Task 2-3
       •     Identify vulnerability and predisposing condition inputs (see Table F-1, as tailored by the
             organization).
       •     Identify vulnerabilities using organization-defined information sources; create or update
             Table F-3.
       •     Assess the severity of identified vulnerabilities (see Table F-2, as tailored by the
             organization); update Table F-3.
       •     Identify predisposing conditions (see Table F-4, as tailored by the organization); create or
             update Table F-6.
       •     Assess the pervasiveness of predisposing conditions (see Table F-5, as tailored by the
             organization); update Table F-6.
       •     Update Column 8 in Table I-5 for adversarial risk; or update Column 6 in Table I-7 for non-
             adversarial risk (see Table F-3 and Table F-6).
       •     Update Column 9 in Table I-5 for adversarial risk; or update Column 7 in Table I-7 for non-
             adversarial risk (see Table F-2 and Table F-5).

DETERMINE LIKELIHOOD

TASK 2-4: Determine the likelihood that threat events of concern result in adverse impacts, considering: (i)

the characteristics of the threat sources that could initiate the events; (ii) the vulnerabilities/predisposing

conditions identified; and (iii) the organizational susceptibility reflecting the safeguards/countermeasures

planned or implemented to impede such events.

Supplemental Guidance: Organizations employ a three-step process to determine the overall likelihood of threat events.

First, organizations assess the likelihood that threat events will be initiated (for adversarial threat events) or will occur

(for non-adversarial threat events). Second, organizations assess the likelihood that threat events once initiated or

occurring, will result in adverse impacts to organizational operations and assets, individuals, other organizations, or the

Nation. Finally, organizations assess the overall likelihood as a combination of likelihood of initiation/occurrence and

likelihood of resulting in adverse impact.

Organizations assess the likelihood of threat event initiation by taking into consideration the characteristics of the threat

sources of concern including capability, intent, and targeting (see Task 2-1 and Appendix D). If threat events require

more capability than adversaries possess (and adversaries are cognizant of this fact), then the adversaries are not

expected to initiate the events. If adversaries do not expect to achieve intended objectives by executing threat events,

then the adversaries are not expected to initiate the events. And finally, if adversaries are not actively targeting specific

organizations or their missions/business functions, adversaries are not expected to initiate threat events. Organizations

use the assessment scale in Table G-2 and provide a rationale for the assessment allowing explicit consideration of

deterrence and threat shifting. Organizations can assess the likelihood of threat event occurrence (non-adversarial)

using Table G-3 and provide a similar rationale for the assessment.

Organizations assess the likelihood that threat events result in adverse impacts by taking into consideration the set of

identified vulnerabilities and predisposing conditions (see Task 2-3 and Appendix F). For threat events initiated by

adversaries, organizations consider characteristics of associated threat sources. For non-adversarial threat events,

organizations take into account the anticipated severity and duration of the event (as included in the description of the

event). Organizations use the assessment scale in Table G-4 and provide a rationale for the assessment allowing explicit

consideration as stated above. Threat events for which no vulnerabilities or predisposing conditions are identified, have

a very low likelihood of resulting in adverse impacts. Such threat events can be highlighted and moved to the end of the

table (or to a separate table), so that they can be tracked for consideration in follow-on risk assessments. However, no

further consideration during the current assessment is warranted.

CHAPTER 3 PAGE 33

Special Publication 800-30 Guide for Conducting Risk Assessments


The overall likelihood of a threat event is a combination of: (i) the likelihood that the event will occur (e.g., due to

human error or natural disaster) or be initiated by an adversary; and (ii) the likelihood that the initiation/occurrence will

result in adverse impacts. Organizations assess the overall likelihood of threat events by using inputs from Tables G-2,

G-3, and G-4. Any specific algorithm or rule for combining the determined likelihood values depends on: (i) general

organizational attitudes toward risk, including overall risk tolerance and tolerance for uncertainty; (ii) specific

tolerances toward uncertainty in different risk factors; and (iii) organizational weighting of risk factors. For example,

organizations could use any of the following rules (or could define a different rule): (i) use the maximum of the two

likelihood values; (ii) use the minimum of the two likelihood values; (iii) consider likelihood of initiation/occurrence

only, assuming that if threat events are initiated or occur, the events will result in adverse impacts; (iv) consider

likelihood of impact only, assuming that if threat events could result in adverse impacts, adversaries will initiate the

events; or (v) take a weighted average of the two likelihood values. Organizations make explicit the rules used.

Appendix G provides a set of exemplary tables for use in determining likelihood of threat events:

• Table G-1 provides a set of exemplary inputs to the likelihood determination task;

• Table G-2 provides an exemplary assessment scale for assessing the likelihood of initiation for adversarial threat

events;

• Table G-3 provides an exemplary assessment scale for assessing the likelihood of non-adversarial threat events

occurring;

• Table G-4 provides an exemplary assessment scale for assessing the likelihood of threat events having adverse

impacts if the events are initiated (adversarial) or occur (non-adversarial); and

• Table G-5 provides an exemplary assessment scale for assessing the overall likelihood of threat events (i.e., a

combination of the likelihood of initiation/occurrence and the likelihood of impact).

The information produced in Task 2-4 provides threat event likelihood inputs to the risk tables in Appendix I.

                                    Summary of Key Activities – Task 2-4
       •    Identify likelihood determination inputs (see Table G-1, as tailored by the organization).
       •    Identify likelihood determination factors using organization-defined information sources
            (e.g., threat source characteristics, vulnerabilities, predisposing conditions).
       •    Assess the likelihood of threat event initiation for adversarial threats and the likelihood of
            threat event occurrence for non-adversarial threats (see Table G-2 and Table G-3, as tailored
            by the organization).
       •    Assess the likelihood of threat events resulting in adverse impacts, given likelihood of
            initiation or occurrence (see Table G-4, as tailored by the organization).
       •    Assess the overall likelihood of threat event initiation/occurrence and likelihood of threat
            events resulting in adverse impacts (see Table G-5, as tailored by the organization).
       •    Update Columns 7, 10, and 11 in Table I-5 for adversarial risk (see Table G-2, Table G-4, and
            Table G-5); or update Columns 5, 8, and 9 in Table I-7 for non-adversarial risk (see Table G-3,
            Table G-4, and Table G-5).

DETERMINE IMPACT

TASK 2-5: Determine the adverse impacts from threat events of concern considering: (i) the characteristics of

the threat sources that could initiate the events; (ii) the vulnerabilities/predisposing conditions identified;

and (iii) the susceptibility reflecting the safeguards/countermeasures planned or implemented to impede

such events.

Supplemental Guidance: Organizations describe adverse impacts in terms of the potential harm caused to organizational

operations and assets, individuals, other organizations, or the Nation. Where the threat event occurs and whether the

effects of the event are contained or spread, influences the severity of the impact. Assessing impact can involve

identifying assets or potential targets of threat sources, including information resources (e.g., information, data

CHAPTER 3 PAGE 34

Special Publication 800-30 Guide for Conducting Risk Assessments


repositories, information systems, applications, information technologies, communications links), people, and physical

resources (e.g., buildings, power supplies), which could be affected by threat events. Organizational impacts are

defined and prioritized at Tiers 1 and 2, and communicated to Tier 3 as part of risk framing. At Tier 3, impacts are

associated with information system capabilities (e.g., processing, display, communications, storage, and retrieval) and

resources (e.g., databases, services, components) that could be compromised.

Appendix H provides a set of exemplary tables for use in determining adverse impacts:

• Table H-1 provides a set of exemplary inputs to the impact determination task;

• Table H-2 provides representative examples of adverse impacts to organizations focusing on harm to organizational

operations and assets, individuals, other organizations, and the Nation;

• Table H-3 provides an exemplary assessment scale for assessing the impact of threat events; and

• Table H-4 provides a template for summarizing/documenting adverse impacts.

The information produced in Task 2-5 provides adverse impact inputs to the risk tables in Appendix I.

                                   Summary of Key Activities – Task 2-5
       •    Identify impact determination inputs (see Table H-1 as tailored by the organization).
       •    Identify impact determination factors using organization-defined information sources.
       •    Identify adverse impacts and affected assets (see Table H-2, as tailored by the organization);
            create or update Table H-4.
       •    Assess the maximum impact associated with the affected assets (see Table H-3, as tailored
            by the organization); update Table H-4.
       •    Update Column 12 in Table I-5 for adversarial risk; or update Column 10 in Table I-7 for non-
            adversarial risk.

DETERMINE RISK

TASK 2-6: Determine the risk to the organization from threat events of concern considering: (i) the impact

that would result from the events; and (ii) the likelihood of the events occurring.

Supplemental Guidance: Organizations assess the risks from threat events as a combination of likelihood and impact.

The level of risk associated with identified threat events represents a determination of the degree to which

organizations are threatened by such events. Organizations make explicit the uncertainty in the risk determinations,

including, for example, organizational assumptions and subjective judgments/decisions. Organizations can order the list

of threat events of concern by the level of risk determined during the risk assessment—with the greatest attention going

to high-risk events. Organizations can further prioritize risks at the same level or with similar scores (see Appendix J).

Each risk corresponds to a specific threat event with a level of impact if that event occurs. In general, the risk level is

typically not higher than the impact level, and likelihood can serve to reduce risk below that impact level. However,

when addressing organization-wide risk management issues with a large number of missions/business functions,

mission/business processes, and supporting information systems, impact as an upper bound on risk may not hold. For

example, when multiple risks materialize, even if each risk is at the moderate level, the set of those moderate-level risks

could aggregate to a higher level of risk for organizations. To address situations where harm occurs multiple times,

organizations can define a threat event as multiple occurrences of harm and an impact level associated with the

cumulative degree of harm. During the execution of Tasks 2-1 through 2-5, organizations capture key information

related to uncertainties in risk assessments. These uncertainties arise from sources such as missing information,

subjective determinations, and assumptions made. The effectiveness of risk assessment results is in part determined by

the ability of decision makers to be able to determine the continued applicability of assumptions made as part of the

assessment. Information related to uncertainty is compiled and presented in a manner that readily supports informed

risk management decisions.

Appendix I provides a set of exemplary tables for use in determining risk:

• Table I-1 provides a set of exemplary inputs to the risk and uncertainty determination task;

• Tables I-2 and I-3 provide exemplary assessment scales for assessing levels of risk;

CHAPTER 3 PAGE 35

Special Publication 800-30 Guide for Conducting Risk Assessments


• Tables I-4 and I-6 provide descriptions of column headings for key data elements used in risk determinations for

adversarial and non-adversarial threat events, respectively; and

• Tables I-5 and I-7 provide templates for summarizing/documenting key data elements used in risk determinations

for adversarial and non-adversarial threat events, respectively.

The information produced in Task 2-6 provides risk inputs to the risk tables in Appendix I.

                                   Summary of Key Activities – Task 2-6
       •    Identify risk and uncertainty determination inputs (see Table I-1, as tailored by the
            organization).
       •    Determine risk (see Table I-2 and Table I-3, as tailored by the organization); update Column
            13 in Table I-5 for adversarial risk and Column 11 in Table I-7 for non-adversarial risk.

CHAPTER 3 PAGE 36

Special Publication 800-30 Guide for Conducting Risk Assessments


3.3 COMMUNICATING AND SHARING RISK ASSESSMENT INFORMATION

The third step in the risk assessment process is to communicate the assessment results and share

risk-related information.47 The objective of this step is to ensure that decision makers across the

organization have the appropriate risk-related information needed to inform and guide risk

decisions. Communicating and sharing information consists of the following specific tasks:

• Communicate the risk assessment results; and

• Share information developed in the execution of the risk assessment, to support other risk

     management activities.

STEP 3: COMMUNICATE AND SHARE RISK ASSESSMENT RESULTS

COMMUNICATE RISK ASSESSMENT RESULTS

TASK 3-1: Communicate risk assessment results to organizational decision makers to support risk responses.

Supplemental Guidance: Organizations can communicate risk assessment results in a variety of ways (e.g., executive

briefings, risk assessment reports, dashboards). Such risk communications can be formal or informal with the content

and format determined by organizations initiating and conducting the assessments. Organizations provide guidance on

specific risk communication and reporting requirements, included as part of preparing for the risk assessment (if not

provided in the risk management strategy as part of the risk framing task). Organizations prioritize risks at the same

level or with similar scores (see Appendix J). Appendix K provides an example of type of information that may be

included in a risk assessment report or the preferred vehicle for risk communication.

SHARE RISK-RELATED INFORMATION

TASK 3-2: Share risk-related information produced during the risk assessment with appropriate

organizational personnel.

Supplemental Guidance: Organizations share source information and intermediate results and provide guidance on

sharing risk-related information. Information sharing occurs primarily within organizations, via reports and briefings,

and by updating risk-related data repositories with supporting evidence for the risk assessment results. Information

sharing is also supported by documenting the sources of information, analytical processes, and intermediate results

(e.g., the completed tables in Appendices D-I), so that risk assessments can be easily maintained. Information sharing

may also occur with other organizations.

              Summary of Key Activities – Communicating and Sharing Information
       •     Determine the appropriate method (e.g., executive briefing, risk assessment report, or
             dashboard) to communicate risk assessment results.
       •     Communicate risk assessment results to designated organizational stakeholders.
       •     Share the risk assessment results and supporting evidence in accordance with organizational
             policies and guidance.

47

The risk assessment process entails ongoing communications and information sharing between those personnel

performing assessment activities, subject matter experts, and key organizational stakeholders (e.g., mission/business

owners, risk executive [function], chief information security officers, information system owners/program managers).

This communication and information sharing ensures that: (i) the inputs to risk assessments are as accurate as possible;

(ii) intermediate results can be used (e.g., to support risk assessments at other tiers); and (iii) results are meaningful and

useful inputs to risk response.

CHAPTER 3 PAGE 37

Special Publication 800-30 Guide for Conducting Risk Assessments


3.4 MAINTAINING THE RISK ASSESSMENT

The fourth step in the risk assessment process is to maintain the assessment. The objective of this

step is to keep current, the specific knowledge of the risk organizations incur. The results of risk

assessments inform risk management decisions and guide risk responses. To support the ongoing

review of risk management decisions (e.g., acquisition decisions, authorization decisions for

information systems and common controls, connection decisions), organizations maintain risk

assessments to incorporate any changes detected through risk monitoring. 48 Risk monitoring

provides organizations with the means to, on an ongoing basis: (i) determine the effectiveness of

risk responses; (ii) identify risk-impacting changes to organizational information systems and the

environments in which those systems operate; 49 and (iii) verify compliance. 50 Maintaining risk

assessments includes the following specific tasks:

• Monitor risk factors identified in risk assessments on an ongoing basis and understanding

     subsequent changes to those factors; and

• Update the components of risk assessments reflecting the monitoring activities carried out by

     organizations.

STEP 4: MAINTAIN THE ASSESSMENT

MONITOR RISK FACTORS

TASK 4-1: Conduct ongoing monitoring of the risk factors that contribute to changes in risk to organizational

operations and assets, individuals, other organizations, or the Nation.

Supplemental Guidance: Organizations monitor risk factors of importance on an ongoing basis to ensure that the

information needed to make credible, risk-based decisions continues to be available over time. Monitoring risk factors

(e.g., threat sources and threat events, vulnerabilities and predisposing conditions, capabilities and intent of adversaries,

targeting of organizational operations, assets, or individuals) can provide critical information on changing conditions

that could potentially affect the ability of organizations to conduct core missions and business functions. Information

derived from the ongoing monitoring of risk factors can be used to refresh risk assessments at whatever frequency

deemed appropriate. Organizations can also attempt to capture changes in the effectiveness of risk response measures

in order to maintain the currency of risk assessments. The objective is to maintain an ongoing situational awareness of

the organizational governance structures and activities, mission/business processes, information systems, and

environments of operation, and thereby all of the risk factors that may affect the risk being incurred by organizations.

Therefore, in applying the risk assessment context or risk frame (i.e., scope, purpose, assumptions, constraints, risk

tolerances, priorities, and trade-offs), organizations consider the part risk factors play in the risk response plan

executed. For example, it is expected to be quite common for the security posture of information systems (that is, the

risk factors measured within those systems) to reflect only a part of the organizational risk response, with response

actions at the organization level or mission/business process level providing a significant portion of that response. In

48

Risk monitoring, the fourth step in the risk management process, is described in NIST Special Publication 800-39.

The step in the risk assessment process to maintain the assessment results over time overlaps to some degree with the

risk monitoring step in the risk management process and the continuous monitoring step in the RMF. This overlap

reinforces the important concept that many of the activities in the risk management process are complementary and

mutually reinforcing. For example, the continuous monitoring step in the RMF can be used to monitor the ongoing

effectiveness of deployed security controls with the results used to inform and guide a more extensive organizational

risk monitoring process. At the organization level, risk monitoring may include monitoring key risk factors that are

necessary to conduct subsequent risk assessments. Organizations use the risk management strategy to convey key

requirements for maintaining risk assessments including, for example, risk factors to monitor and the frequency of such

monitoring.

49

NIST Special Publication 800-137 provides guidance on the ongoing monitoring of organizational information

systems and environments of operation.

50

Compliance verification ensures that organizations have implemented required risk response measures and that

information security requirements derived from and traceable to organizational missions/business functions, federal

legislation, directives, regulations, policies, and standards/guidelines are satisfied.

CHAPTER 3 PAGE 38

Special Publication 800-30 Guide for Conducting Risk Assessments


such situations, monitoring only the security posture of information systems would likely not provide sufficient

information to determine the overall risk being incurred by organizations. Highly capable, well-resourced, and purpose-

driven threat sources can be expected to defeat commonly available protection mechanisms (e.g., by bypassing or

tampering with such mechanisms). Thus, process-level risk response measures such as reengineering mission/business

processes, wise use of information technology, or the use of alternate execution processes, in the event of compromised

information systems, can be major elements of organizational risk response plans.

UPDATE RISK ASSESSMENT

TASK 4-2: Update existing risk assessment using the results from ongoing monitoring of risk factors.

Supplemental Guidance: Organizations determine the frequency and the circumstances under which risk assessments

are updated. Such determinations can include, for example, the current level of risk to and/or the importance of, core

organizational missions/business functions. If significant changes (as defined by organizational policies, direction, or

guidance) have occurred since the risk assessment was conducted, organizations can revisit the purpose, scope,

assumptions, and constraints of the assessment to determine whether all tasks in the risk assessment process need to be

repeated. Otherwise, the updates constitute subsequent risk assessments, identifying and assessing only how selected

risk factors have changed, for example: (i) the identification of new threat events, vulnerabilities, predisposing

conditions, undesirable consequences and/or affected assets; and (ii) the assessments of threat source characteristics

(e.g., capability, intent, targeting, range of effects), likelihoods, and impacts. Organizations communicate the results of

subsequent risk assessments to entities across all risk management tiers to ensure that responsible organizational

officials have access to critical information needed to make ongoing risk-based decisions.

                     Summary of Key Activities – Maintaining Risk Assessments
       •    Identify key risk factors that have been identified for ongoing monitoring.
       •    Identify the frequency of risk factor monitoring activities and the circumstances under which
            the risk assessment needs to be updated.
       •    Reconfirm the purpose, scope, and assumptions of the risk assessment.
       •    Conduct the appropriate risk assessment tasks, as needed.
       •    Communicate the subsequent risk assessment results to specified organizational personnel.

CHAPTER 3 PAGE 39

Special Publication 800-30 Guide for Conducting Risk Assessments


APPENDIX A

REFERENCES

LAWS, POLICIES, DIRECTIVES, INSTRUCTIONS, STANDARDS, AND GUIDELINES

                                           LEGISLATION

1. E-Government Act [includes FISMA] (P.L. 107-347), December 2002.

2. Federal Information Security Management Act (P.L. 107-347, Title III), December 2002.

                               POLICIES, DIRECTIVES, INSTRUCTIONS

1. Office of Management and Budget, Circular A-130, Appendix III, Transmittal

        Memorandum #4, Management of Federal Information Resources, November 2000.

2. Committee on National Security Systems Instruction (CNSSI) No. 4009, National

        Information Assurance (IA) Glossary, April 2010.

3. Committee on National Security Systems Instruction (CNSSI) No. 1253, Security

        Categorization and Control Selection for National Security Systems, March 2012.

4. Department of Homeland Security Federal Continuity Directive 2 (FCD 2), Federal

        Executive Branch Mission Essential Function and Primary Mission Essential Function
        Identification and Submission Process, February 2008.
                                           STANDARDS

1. National Institute of Standards and Technology Federal Information Processing

        Standards Publication 199, Standards for Security Categorization of Federal Information
        and Information Systems, February 2004.

2. National Institute of Standards and Technology Federal Information Processing

        Standards Publication 200, Minimum Security Requirements for Federal Information and
        Information Systems, March 2006.

3. ISO/IEC 31000:2009, Risk management – Principles and guidelines.

4. ISO/IEC 30101:2009, Risk management – Risk assessment techniques.

5. ISO/IEC Guide 73, Risk management – Vocabulary.

6. ISO/IEC 27005:2011, Information technology – Security techniques – Information

        security risk management.
                                           GUIDELINES

1. National Institute of Standards and Technology Special Publication 800-18, Revision 1,

        Guide for Developing Security Plans for Federal Information Systems, February 2006.

2. National Institute of Standards and Technology Special Publication 800-34, Revision 1,

        Contingency Planning Guide for Federal Information Systems, May 2010.

3. National Institute of Standards and Technology Special Publication 800-37, Revision 1,

        Guide for Applying the Risk Management Framework to Federal Information Systems: A
        Security Life Cycle Approach, February 2010.

APPENDIX A PAGE A-1

Special Publication 800-30 Guide for Conducting Risk Assessments


4. National Institute of Standards and Technology Special Publication 800-39, Managing

        Information Security Risk: Organization, Mission, and Information System View, March
        2011.

5. National Institute of Standards and Technology Special Publication 800-53, Revision 3,

        Recommended Security Controls for Federal Information Systems and Organizations,
        August 2009.

6. National Institute of Standards and Technology Special Publication 800-53A, Revision 1,

        Guide for Assessing the Security Controls in Federal Information Systems and
        Organizations: Building Effective Security Assessment Plans, June 2010.

7. National Institute of Standards and Technology Special Publication 800-59, Guideline for

        Identifying an Information System as a National Security System, August 2003.

8. National Institute of Standards and Technology Special Publication 800-60, Revision 1,

        Guide for Mapping Types of Information and Information Systems to Security Categories,
        August 2008.

9. National Institute of Standards and Technology Special Publication 800-64, Revision 2,

        Security Considerations in the System Development Life Cycle, October 2008.

10. National Institute of Standards and Technology Special Publication 800-65, Integrating

        IT Security into the Capital Planning and Investment Control Process, January 2005.

11. National Institute of Standards and Technology Special Publication 800-70, Revision 2,

        National Checklist Program for IT Products--Guidelines for Checklist Users and
        Developers, February 2011.

12. National Institute of Standards and Technology Special Publication 800-117, Version 1.0,

        Guide to Adopting and Using the Security Content Automation Protocol (SCAP), July
        2010.

13. National Institute of Standards and Technology Special Publication 800-126, The

        Technical Specification for the Security Content Automation Protocol (SCAP): SCAP
        Version 1.0, November 2009.

14. National Institute of Standards and Technology Special Publication 800-137, Information

        Security Continuous Monitoring for Federal Information Systems and Organizations,
        September 2011.

APPENDIX A PAGE A-2

Special Publication 800-30 Guide for Conducting Risk Assessments


APPENDIX B

GLOSSARY

COMMON TERMS AND DEFINITIONS

T his appendix provides definitions for security terminology used within Special Publication

        800-30. The terms in the glossary are consistent with the terms used in the suite of
        FISMA-related security standards and guidelines developed by NIST. Unless otherwise

stated, all terms used in this publication are also consistent with the definitions contained in the

CNSSI No. 4009, National Information Assurance (IA) Glossary.

Adequate Security Security commensurate with the risk and magnitude of

[OMB Circular A-130, Appendix III] harm resulting from the loss, misuse, or unauthorized

                                        access to or modification of information.

Advanced Persistent Threat An adversary with sophisticated levels of expertise and

[NIST SP 800-39] significant resources, allowing it through the use of

                                        multiple different attack vectors (e.g., cyber, physical,
                                        and deception), to generate opportunities to achieve its
                                        objectives which are typically to establish and extend its
                                        presence within the information technology infrastructure
                                        of organizations for purposes of continually exfiltrating
                                        information and/or to undermine or impede critical
                                        aspects of a mission, program, or organization, or place
                                        itself in a position to do so in the future; moreover, the
                                        advanced persistent threat pursues its objectives
                                        repeatedly over an extended period of time, adapting to a
                                        defender’s efforts to resist it, and with determination to
                                        maintain the level of interaction needed to execute its
                                        objectives.

Adversary Individual, group, organization, or government that

[DHS Risk Lexicon] conducts or has the intent to conduct detrimental

                                        activities.

Agency See Executive Agency.

Analysis Approach The approach used to define the orientation or starting

                                        point of the risk assessment, the level of detail in the
                                        assessment, and how risks due to similar threat scenarios
                                        are treated.

Assessment See Security Control Assessment or Risk Assessment.

Assessment Approach The approach used to assess risk and its contributing risk

                                        factors, including quantitatively, qualitatively, or semi-
                                        quantitatively.

Assessor See Security Control Assessor or Risk Assessor.

Attack Any kind of malicious activity that attempts to collect,

[CNSSI No. 4009] disrupt, deny, degrade, or destroy information system

                                        resources or the information itself.

APPENDIX B PAGE B-1

Special Publication 800-30 Guide for Conducting Risk Assessments


Authentication Verifying the identity of a user, process, or device, often

[FIPS 200] as a prerequisite to allowing access to resources in an

                                      information system.

Authenticity The property of being genuine and being able to be

[CNSSI No. 4009] verified and trusted; confidence in the validity of a

                                      transmission, a message, or message originator. See
                                      Authentication.

Authorization The official management decision given by a senior

(to operate) organizational official to authorize operation of an

[CNSSI No. 4009] information system and to explicitly accept the risk to

                                      organizational operations (including mission, functions,
                                      image, or reputation), organizational assets, individuals,
                                      other organizations, and the Nation based on the
                                      implementation of an agreed-upon set of security
                                      controls.

Authorization Boundary All components of an information system to be

[CNSSI No. 4009] authorized for operation by an authorizing official and

                                      excludes separately authorized systems, to which the
                                      information system is connected.

Authorizing Official Senior (federal) official or executive with the authority to

[CNSSI No. 4009] formally assume responsibility for operating an

                                      information system at an acceptable level of risk to
                                      organizational operations (including mission, functions,
                                      image, or reputation), organizational assets, individuals,
                                      other organizations, and the Nation.

Availability Ensuring timely and reliable access to and use of

[44 U.S.C., Sec. 3542] information.

Chief Information Officer Agency official responsible for:

[PL 104-106, Sec. 5125(b)] (i) Providing advice and other assistance to the head of

                                      the executive agency and other senior management
                                      personnel of the agency to ensure that information
                                      technology is acquired and information resources are
                                      managed in a manner that is consistent with laws,
                                      Executive Orders, directives, policies, regulations, and
                                      priorities established by the head of the agency;
                                      (ii) Developing, maintaining, and facilitating the
                                      implementation of a sound and integrated information
                                      technology architecture for the agency; and
                                      (iii) Promoting the effective and efficient design and
                                      operation of all major information resources management
                                      processes for the agency, including improvements to
                                      work processes of the agency.

Chief Information Security Officer See Senior Agency Information Security Officer.

Common Control A security control that is inherited by one or more

[NIST SP 800-37] organizational information systems. See Security Control

                                      Inheritance.

APPENDIX B PAGE B-2

Special Publication 800-30 Guide for Conducting Risk Assessments


Common Control Provider An organizational official responsible for the

[CNSSI No. 4009] development, implementation, assessment, and

                                      monitoring of common controls (i.e., security controls
                                      inherited by information systems).

Compensating Security Control A management, operational, and/or technical control (i.e.,

[CNSSI No. 4009] safeguard or countermeasure) employed by an

                                      organization in lieu of a recommended security control in
                                      the low, moderate, or high baselines that provides
                                      equivalent or comparable protection for an information
                                      system.

Confidentiality Preserving authorized restrictions on information access

[44 U.S.C., Sec. 3542] and disclosure, including means for protecting personal

                                      privacy and proprietary information.

Course of Action A time-phased or situation-dependent combination of risk

[NIST SP 800-39] response measures. See Risk Response.

Critical Infrastructure System and assets, whether physical or virtual, so vital to

                                      the United States that the incapacity or destruction of
                                      such systems and assets would have a debilitating impact
                                      on security, national economic security, national public
                                      health or safety, or any combination of those matters.

Critical Infrastructure Sectors Information technology; telecommunications; chemical;

[HSPD-7] transportation systems, including mass transit, aviation,

                                      maritime, ground/surface, and rail and pipeline systems;
                                      emergency services; and postal and shipping.

Criticality A measure of the degree to which an organization

[NIST SP 800-60] depends on the information or information system for the

                                      success of a mission or of a business function.

Cyber Attack An attack, via cyberspace, targeting an enterprise’s use of

[CNSSI No. 4009] cyberspace for the purpose of disrupting, disabling,

                                      destroying, or maliciously controlling a computing
                                      environment/infrastructure; or destroying the integrity of
                                      the data or stealing controlled information.

Cyber Security The ability to protect or defend the use of cyberspace

[CNSSI No. 4009] from cyber attacks.

Cyberspace A global domain within the information environment

[CNSSI No. 4009] consisting of the interdependent network of information

                                      systems infrastructures including the Internet,
                                      telecommunications networks, computer systems, and
                                      embedded processors and controllers.

APPENDIX B PAGE B-3

Special Publication 800-30 Guide for Conducting Risk Assessments


Defense-in-Breadth A planned, systematic set of multidisciplinary activities

[CNSSI No. 4009] that seek to identify, manage, and reduce risk of

                                      exploitable vulnerabilities at every stage of the system,
                                      network, or subcomponent life cycle (system, network, or
                                      product design and development; manufacturing;
                                      packaging; assembly; system integration; distribution;
                                      operations; maintenance; and retirement).

Defense-in-Depth Information security strategy integrating people,

[CNSSI No. 4009] technology, and operations capabilities to establish

                                      variable barriers across multiple layers and missions of
                                      the organization.

Enterprise An organization with a defined mission/goal and a

[CNSSI No. 4009] defined boundary, using information systems to execute

                                      that mission, and with responsibility for managing its
                                      own risks and performance. An enterprise may consist of
                                      all or some of the following business aspects: acquisition,
                                      program management, financial management (e.g.,
                                      budgets), human resources, security, and information
                                      systems, information and mission management. See
                                      Organization.

Enterprise Architecture The description of an enterprise’s entire set of

[CNSSI No. 4009] information systems: how they are configured, how they

                                      are integrated, how they interface to the external
                                      environment at the enterprise’s boundary, how they are
                                      operated to support the enterprise mission, and how they
                                      contribute to the enterprise’s overall security posture.

Environment of Operation The physical, technical, and organizational setting in

                                      which an information system operates, including but not
                                      limited to: missions/business functions; mission/business
                                      processes; threat space; vulnerabilities; enterprise and
                                      information security architectures; personnel; facilities;
                                      supply chain relationships; information technologies;
                                      organizational governance and culture; acquisition and
                                      procurement processes; organizational policies and
                                      procedures; organizational assumptions, constraints, risk
                                      tolerance, and priorities/trade-offs).

Executive Agency An executive department specified in 5 U.S.C., Sec. 101;

[41 U.S.C., Sec. 403] a military department specified in 5 U.S.C., Sec. 102; an

                                      independent establishment as defined in 5 U.S.C., Sec.
                                      104(1); and a wholly owned Government corporation
                                      fully subject to the provisions of 31 U.S.C., Chapter 91.

APPENDIX B PAGE B-4

Special Publication 800-30 Guide for Conducting Risk Assessments


Fault Tree Analysis A top-down, deductive failure analysis in which an

                                      undesired state of a system (top event) is analyzed using
                                      Boolean logic to combine a series of lower-level events.
                                      An analytical approach whereby an undesired state of a
                                      system is specified and the system is then analyzed in the
                                      context of its environment of operation to find all realistic
                                      ways in which the undesired event (top event) can occur.

Federal Agency See Executive Agency.

Federal Information An information system used or operated by an executive

System agency, by a contractor of an executive agency, or by

[40 U.S.C., Sec. 11331] another organization on behalf of an executive agency.

Hybrid Security Control A security control that is implemented in an information

[NIST SP 800-53] system in part as a common control and in part as a

                                      system-specific control. See Common Control and
                                      System-Specific Security Control.

Impact Level The magnitude of harm that can be expected to result

[CNSSI No. 4009] from the consequences of unauthorized disclosure of

                                      information, unauthorized modification of information,
                                      unauthorized destruction of information, or loss of
                                      information or information system availability.

Impact Value The assessed potential impact resulting from a

[CNSSI No. 1253] compromise of the confidentiality, integrity, or

                                      availability of an information type, expressed as a value
                                      of low, moderate, or high.

Industrial Control System An information system used to control industrial

[NIST SP 800-39] processes such as manufacturing, product handling,

                                      production, and distribution. Industrial control systems
                                      include supervisory control and data acquisition systems
                                      used to control geographically dispersed assets, as well as
                                      distributed control systems and smaller control systems
                                      using programmable logic controllers to control localized
                                      processes.

Information Any communication or representation of knowledge such

[CNSSI No. 4009] as facts, data, or opinions in any medium or form,

                                      including textual, numerical, graphic, cartographic,
                                      narrative, or audiovisual.

[FIPS 199] An instance of an information type.

Information Owner Official with statutory or operational authority for

[CNSSI No. 4009] specified information and responsibility for establishing

                                      the controls for its generation, classification, collection,
                                      processing, dissemination, and disposal. See Information
                                      Steward.

Information Resources Information and related resources, such as personnel,

[44 U.S.C., Sec. 3502] equipment, funds, and information technology.

APPENDIX B PAGE B-5

Special Publication 800-30 Guide for Conducting Risk Assessments


Information Security The protection of information and information systems

[44 U.S.C., Sec. 3542] from unauthorized access, use, disclosure, disruption,

                                      modification, or destruction in order to provide
                                      confidentiality, integrity, and availability.

Information Security Architecture A description of the structure and behavior for an

[NIST SP 800-39] enterprise’s security processes, information security

                                      systems, personnel and organizational sub-units, showing
                                      their alignment with the enterprise’s mission and strategic
                                      plans.

Information Security Program Plan Formal document that provides an overview of the

[NIST SP 800-53] security requirements for an organization-wide

                                      information security program and describes the program
                                      management controls and common controls in place or
                                      planned for meeting those requirements.

Information Security Risk The risk to organizational operations (including mission,

                                      functions, image, reputation), organizational assets,
                                      individuals, other organizations, and the Nation due to the
                                      potential for unauthorized access, use, disclosure,
                                      disruption, modification, or destruction of information
                                      and/or information systems. See Risk.

Information Steward An agency official with statutory or operational authority

[CNSSI No. 4009] for specified information and responsibility for

                                      establishing the controls for its generation, collection,
                                      processing, dissemination, and disposal.

Information System A discrete set of information resources organized for the

[44 U.S.C., Sec. 3502] collection, processing, maintenance, use, sharing,

                                      dissemination, or disposition of information.

Information System Boundary See Authorization Boundary.

Information System Owner Official responsible for the overall procurement,

(or Program Manager) development, integration, modification, or operation and

                                      maintenance of an information system.

Information System Resilience The ability of an information system to continue to

                                      operate while under attack, even if in a degraded or
                                      debilitated state, and to rapidly recover operational
                                      capabilities for essential functions after a successful
                                      attack.

Information System Individual assigned responsibility by the senior agency

Security Officer information security officer, authorizing official,

                                      management official, or information system owner for
                                      maintaining the appropriate operational security posture
                                      for an information system or program.

APPENDIX B PAGE B-6

Special Publication 800-30 Guide for Conducting Risk Assessments


Information System-Related Risk that arises through the loss of confidentiality,

Security Risk integrity, or availability of information or information

                                      systems considering impacts to organizational operations
                                      and assets, individuals, other organizations, and the
                                      Nation. A subset of Information Security Risk. See Risk.

Information Technology Any equipment or interconnected system or subsystem of

[40 U.S.C., Sec. 1401] equipment that is used in the automatic acquisition,

                                      storage, manipulation, management, movement, control,
                                      display, switching, interchange, transmission, or
                                      reception of data or information by the executive agency.
                                      For purposes of the preceding sentence, equipment is
                                      used by an executive agency if the equipment is used by
                                      the executive agency directly or is used by a contractor
                                      under a contract with the executive agency which: (i)
                                      requires the use of such equipment; or (ii) requires the
                                      use, to a significant extent, of such equipment in the
                                      performance of a service or the furnishing of a product.
                                      The term information technology includes computers,
                                      ancillary equipment, software, firmware, and similar
                                      procedures, services (including support services), and
                                      related resources.

Information Type A specific category of information (e.g., privacy,

[FIPS 199] medical, proprietary, financial, investigative, contractor

                                      sensitive, security management) defined by an
                                      organization or in some instances, by a specific law,
                                      Executive Order, directive, policy, or regulation.

Integrity Guarding against improper information modification or

[44 U.S.C., Sec. 3542] destruction, and includes ensuring information non-

                                      repudiation and authenticity.

Likelihood of Occurrence A weighted factor based on a subjective analysis of the

[CNSSI No. 4009, adapted] probability that a given threat is capable of exploiting a

                                      given vulnerability or a set of vulnerabilities.

Management Controls The security controls (i.e., safeguards or

[FIPS 200] countermeasures) for an information system that focus on

                                      the management of risk and the management of
                                      information system security.

Mission/Business Segment Elements of organizations describing mission areas,

                                      common/shared business services, and organization-wide
                                      services. Mission/business segments can be identified
                                      with one or more information systems which collectively
                                      support a mission/business process.

APPENDIX B PAGE B-7

Special Publication 800-30 Guide for Conducting Risk Assessments


National Security System Any information system (including any

[44 U.S.C., Sec. 3542] telecommunications system) used or operated by an

                                      agency or by a contractor of an agency, or other
                                      organization on behalf of an agency (i) the function,
                                      operation, or use of which involves intelligence activities;
                                      involves cryptologic activities related to national security;
                                      involves command and control of military forces;
                                      involves equipment that is an integral part of a weapon or
                                      weapons system; or is critical to the direct fulfillment of
                                      military or intelligence missions (excluding a system that
                                      is to be used for routine administrative and business
                                      applications, for example, payroll, finance, logistics, and
                                      personnel management applications); or (ii) is protected
                                      at all times by procedures established for information that
                                      have been specifically authorized under criteria
                                      established by an Executive Order or an Act of Congress
                                      to be kept classified in the interest of national defense or
                                      foreign policy.

Operational Controls The security controls (i.e., safeguards or

[FIPS 200] countermeasures) for an information system that are

                                      primarily implemented and executed by people (as
                                      opposed to systems).

Organization An entity of any size, complexity, or positioning within

[FIPS 200, Adapted] an organizational structure (e.g., a federal agency or, as

                                      appropriate, any of its operational elements). See
                                      Enterprise.

Plan of Action and A document that identifies tasks needing to be

Milestones accomplished. It details resources required to accomplish

[OMB Memorandum 02-01] the elements of the plan, any milestones in meeting the

                                      tasks, and scheduled completion dates for the milestones.

Predisposing Condition A condition that exists within an organization, a

                                      mission/business process, enterprise architecture, or
                                      information system including its environment of
                                      operation, which contributes to (i.e., increases or
                                      decreases) the likelihood that one or more threat events,
                                      once initiated, will result in undesirable consequences or
                                      adverse impact to organizational operations and assets,
                                      individuals, other organizations, or the Nation.

Qualitative Assessment Use of a set of methods, principles, or rules for assessing

[DHS Risk Lexicon] risk based on nonnumerical categories or levels.

Quantitative Assessment Use of a set of methods, principles, or rules for assessing

[DHS Risk Lexicon] risks based on the use of numbers where the meanings

                                      and proportionality of values are maintained inside and
                                      outside the context of the assessment.

Repeatability The ability to repeat an assessment in the future, in a

                                      manner that is consistent with, and hence comparable to,
                                      prior assessments.

APPENDIX B PAGE B-8

Special Publication 800-30 Guide for Conducting Risk Assessments


Reproducibility The ability of different experts to produce the same

                                      results from the same data.

Residual Risk Portion of risk remaining after security measures have

[CNSSI No. 4009] been applied.

Risk A measure of the extent to which an entity is threatened

[CNSSI No. 4009] by a potential circumstance or event, and typically a

                                      function of: (i) the adverse impacts that would arise if the
                                      circumstance or event occurs; and (ii) the likelihood of
                                      occurrence. See Information System-Related Security
                                      Risk.

Risk Assessment The process of identifying, estimating, and prioritizing

[NIST SP 800-39] risks to organizational operations (including mission,

                                      functions, image, reputation), organizational assets,
                                      individuals, other organizations, and the Nation, resulting
                                      from the operation of an information system.
                                      Part of risk management, incorporates threat and
                                      vulnerability analyses, and considers mitigations
                                      provided by security controls planned or in place.
                                      Synonymous with risk analysis.

Risk Assessment Methodology A risk assessment process, together with a risk model,

                                      assessment approach, and analysis approach.

Risk Assessment Report The report which contains the results of performing a risk

                                      assessment or the formal output from the process of
                                      assessing risk.

Risk Assessor The individual, group, or organization responsible for

                                      conducting a risk assessment.

Risk Executive (Function) An individual or group within an organization that helps

[CNSSI No. 4009] to ensure that: (i) security risk-related considerations for

                                      individual information systems, to include the
                                      authorization decisions for those systems, are viewed
                                      from an organization-wide perspective with regard to the
                                      overall strategic goals and objectives of the organization
                                      in carrying out its missions and business functions; and
                                      (ii) managing risk from individual information systems is
                                      consistent across the organization, reflects organizational
                                      risk tolerance, and is considered along with other
                                      organizational risks affecting mission/business success.

Risk Factor A characteristic used in a risk model as an input to

                                      determining the level of risk in a risk assessment.

APPENDIX B PAGE B-9

Special Publication 800-30 Guide for Conducting Risk Assessments


Risk Management The program and supporting processes to manage

[NIST SP 800-39] information security risk to organizational operations

[CNSSI No. 4009, adapted] (including mission, functions, image, reputation),

                                      organizational assets, individuals, other organizations,
                                      and the Nation, and includes: (i) establishing the context
                                      for risk-related activities; (ii) assessing risk; (iii)
                                      responding to risk once determined; and (iv) monitoring
                                      risk over time.

Risk Mitigation Prioritizing, evaluating, and implementing the

[CNSSI No. 4009] appropriate risk-reducing controls/countermeasures

                                      recommended from the risk management process. A
                                      subset of Risk Response.

Risk Model A key component of a risk assessment methodology (in

                                      addition to assessment approach and analysis approach)
                                      that defines key terms and assessable risk factors.

Risk Monitoring Maintaining ongoing awareness of an organization’s risk

[NIST SP 800-39] environment, risk management program, and associated

                                      activities to support risk decisions.

Risk Response Accepting, avoiding, mitigating, sharing, or transferring

[NIST SP 800-39] risk to organizational operations (i.e., mission, functions,

                                      image, or reputation), organizational assets, individuals,
                                      other organizations, or the Nation. See Course of Action.

Risk Response Measure A specific action taken to respond to an identified risk.

[NIST SP 800-39]

Root Cause Analysis A principle-based, systems approach for the identification

                                      of underlying causes associated with a particular set of
                                      risks.

Security Authorization See Authorization (to operate).

(to Operate)

Security Categorization The process of determining the security category for

                                      information or an information system. Security
                                      categorization methodologies are described in CNSSI
                                      No.1253 for national security systems and in FIPS 199
                                      for other than national security systems.

Security Control Assessment The testing and/or evaluation of the management,

[NIST SP 800-39] operational, and technical security controls to determine

[CNSSI No. 4009, Adapted] the extent to which the controls are implemented

                                      correctly, operating as intended, and producing the
                                      desired outcome with respect to meeting the security
                                      requirements for an information system or organization.

Security Control Assessor The individual, group, or organization responsible for

                                      conducting a security control assessment.

APPENDIX B PAGE B-10

Special Publication 800-30 Guide for Conducting Risk Assessments


Security Control Baseline The set of minimum security controls defined for a low-

[CNSSI No. 4009] impact, moderate-impact, or high-impact information

                                      system.

[CNSSI No. 1253] A set of information security controls that has been

                                      established through information security strategic
                                      planning activities to address one or more specified
                                      security categorizations; this set of security controls is
                                      intended to be the initial security control set selected for a
                                      specific system once that system’s security categorization
                                      is determined.

Security Control Enhancement Statement of security capability to: (i) build in additional,

[NIST SP 800-39, adapted] but related, functionality to a basic security control;

                                      and/or (ii) increase the strength of a basic control.

Security Control Inheritance A situation in which an information system or application

[CNSSI No. 4009] receives protection from security controls (or portions of

                                      security controls) that are developed, implemented,
                                      assessed, authorized, and monitored by entities other than
                                      those responsible for the system or application; entities
                                      either internal or external to the organization where the
                                      system or application resides. See Common Control.

Security Controls The management, operational, and technical controls

[FIPS 199, CNSSI No. 4009] (i.e., safeguards or countermeasures) prescribed for an

                                      information system to protect the confidentiality,
                                      integrity, and availability of the system and its
                                      information.

Security Impact Analysis The analysis conducted by an organizational official to

[NIST SP 800-37] determine the extent to which changes to the information

                                      system have affected the security state of the system.

Security Objective Confidentiality, integrity, or availability.

[FIPS 199]

Security Plan Formal document that provides an overview of the

[NIST SP 800-18] security requirements for an information system or an

                                      information security program and describes the security
                                      controls in place or planned for meeting those
                                      requirements.
                                      See System Security Plan or Information Security
                                      Program Plan.

Security Policy A set of criteria for the provision of security services.

[CNSSI No. 4009]

Security Posture The security status of an enterprise’s networks,

[CNSSI No. 4009] information, and systems based on information assurance

                                      resources (e.g., people, hardware, software, policies) and
                                      capabilities in place to manage the defense of the
                                      enterprise and to react as the situation changes.

APPENDIX B PAGE B-11

Special Publication 800-30 Guide for Conducting Risk Assessments


Security Requirements Requirements levied on an information system that are

[FIPS 200] derived from applicable laws, Executive Orders,

                                      directives, policies, standards, instructions, regulations,
                                      procedures, or organizational mission/business case needs
                                      to ensure the confidentiality, integrity, and availability of
                                      the information being processed, stored, or transmitted.

Semi-Quantitative Assessment Use of a set of methods, principles, or rules for assessing

[Department of Homeland Security risk based on bins, scales, or representative numbers

(DHS) Risk Lexicon] whose values and meanings are not maintained in other

                                      contexts.

Senior Agency Official responsible for carrying out the Chief

Information Security Information Officer responsibilities under FISMA and

Officer serving as the Chief Information Officer’s primary liaison

[44 U.S.C., Sec. 3544] to the agency’s authorizing officials, information system

                                      owners, and information system security officers.
                                      [Note: Organizations subordinate to federal agencies may use the term
                                      Senior Information Security Officer or Chief Information Security
                                      Officer to denote individuals filling positions with similar
                                      responsibilities to Senior Agency Information Security Officers.]

Senior Information Security See Senior Agency Information Security Officer.

Officer

Sensitivity A measure of the importance assigned to information by

[NIST SP 800-60] its owner, for the purpose of denoting its need for

                                      protection.

Subsystem A major subdivision or component of an information

[NIST SP 800-39] system consisting of information, information

                                      technology, and personnel that performs one or more
                                      specific functions.

Supplementation (Security The process of adding security controls or control

Controls) enhancements to a security control baseline from NIST

[NIST SP 800-39] Special Publication 800-53 or CNSSI No. 1253 in order

                                      to adequately meet the organization’s risk management
                                      needs.

System See Information System.

System Security Plan Formal document that provides an overview of the

[NIST SP 800-18] security requirements for an information system and

                                      describes the security controls in place or planned for
                                      meeting those requirements.

System-Specific Security Control A security control for an information system that has not

[NIST SP 800-37] been designated as a common control or the portion of a

                                      hybrid control that is to be implemented within an
                                      information system.

APPENDIX B PAGE B-12

Special Publication 800-30 Guide for Conducting Risk Assessments


Tailoring The process by which a security control baseline is

[NIST SP 800-53, CNSSI No. 4009] modified based on: (i) the application of scoping

                                      guidance; (ii) the specification of compensating security
                                      controls, if needed; and (iii) the specification of
                                      organization-defined parameters in the security controls
                                      via explicit assignment and selection statements.

Tailored Security Control Baseline A set of security controls resulting from the application

[NIST SP 800-39] of tailoring guidance to the security control baseline. See

                                      Tailoring.

Technical Controls Security controls (i.e., safeguards or countermeasures) for

[FIPS 200] an information system that are primarily implemented

                                      and executed by the information system through
                                      mechanisms contained in the hardware, software, or
                                      firmware components of the system.

Threat Any circumstance or event with the potential to adversely

[CNSSI No.4009] impact organizational operations (including mission,

                                      functions, image, or reputation), organizational assets,
                                      individuals, other organizations, or the Nation through an
                                      information system via unauthorized access, destruction,
                                      disclosure, or modification of information, and/or denial
                                      of service.

Threat Assessment Process of formally evaluating the degree of threat to an

[CNSSI No. 4009] information system or enterprise and describing the

                                      nature of the threat.

Threat Event An event or situation that has the potential for causing

                                      undesirable consequences or impact.

Threat Scenario A set of discrete threat events, associated with a specific

                                      threat source or multiple threat sources, partially ordered
                                      in time. Synonym for Threat Campaign.

Threat Shifting Response from adversaries to perceived safeguards

                                      and/or countermeasures (i.e., security controls), in which
                                      the adversaries change some characteristic of their intent
                                      to do harm in order to avoid and/or overcome those
                                      safeguards/countermeasures.

Threat Source The intent and method targeted at the intentional

[CNSSI No. 4009] exploitation of a vulnerability or a situation and method

                                      that may accidentally exploit a vulnerability.

Vulnerability Weakness in an information system, system security

[CNSSI No. 4009] procedures, internal controls, or implementation that

                                      could be exploited by a threat source.

Vulnerability Assessment Systematic examination of an information system or

[CNSSI No. 4009] product to determine the adequacy of security measures,

                                      identify security deficiencies, provide data from which to
                                      predict the effectiveness of proposed security measures,
                                      and confirm the adequacy of such measures after
                                      implementation.

APPENDIX B PAGE B-13

Special Publication 800-30 Guide for Conducting Risk Assessments


APPENDIX C

ACRONYMS

COMMON ABBREVIATIONS

APT Advanced Persistent Threat

BCP Business Continuity Plan

BIA Business Impact Analysis

CNSS Committee on National Security Systems

COOP Continuity of Operations

DoD Department of Defense

DHS Department of Homeland Security

DNI Director of National Intelligence

EA Enterprise Architecture

FIPS Federal Information Processing Standards

FISMA Federal Information Security Management Act

ICS Industrial Control System

IEC International Electrotechnical Commission

ISO International Organization for Standardization

IT Information Technology

JTF Joint Task Force

NIST National Institute of Standards and Technology

NOFORN Not Releasable to Foreign Nationals

ODNI Office of the Director of National Intelligence

OMB Office of Management and Budget

RAR Risk Assessment Report

RMF Risk Management Framework

SCAP Security Content Automation Protocol

SP Special Publication

TTP Tactic Technique Procedure

U.S.C. United States Code

APPENDIX C PAGE C-1

Special Publication 800-30 Guide for Conducting Risk Assessments


APPENDIX D

THREAT SOURCES

TAXONOMY OF THREATS SOURCES CAPABLE OF INITIATING THREAT EVENTS

T his appendix provides: (i) a description of potentially useful inputs to the threat source

        identification task; (ii) an exemplary taxonomy of threat sources by type, description, and
        risk factors (i.e., characteristics) used to assess the likelihood and/or impact of such threat

sources initiating threat events; (iii) an exemplary set of tailorable assessment scales for assessing

those risk factors; and (iv) templates for summarizing and documenting the results of the threat

source identification Task 2-1. The taxonomy and assessment scales in this appendix can be used

by organizations as a starting point with appropriate tailoring to adjust for organization-specific

conditions. Tables D-7 and D-8, outputs from Task 2-1, provide relevant inputs to the risk tables

in Appendix I.

                                     TABLE D-1: INPUTS – THREAT SOURCE IDENTIFICATION
                                                                                                                     Provided To
                                           Description
                                                                                                            Tier 1     Tier 2       Tier 3

From Tier 1: (Organization level) No Yes Yes

- Sources of threat information deemed to be credible (e.g., open source and/or classified threat if not

reports, previous risk/threat assessments). (Section 3.1, Task 1-4) provided by

- Threat source information and guidance specific to Tier 1 (e.g., threats related to organizational Tier 2

governance, core missions/business functions, management/operational policies, procedures, and

structures, external mission/business relationships).

- Taxonomy of threat sources, annotated by the organization, if necessary. (Table D-2)

- Characterization of adversarial and non-adversarial threat sources.

- Assessment scales for assessing adversary capability, intent, and targeting, annotated by the

      organization, if necessary. (Table D-3, Table D-4, Table D-5)

- Assessment scale for assessing the range of effects, annotated by the organization, if necessary.

      (Table D-6)

- Threat sources identified in previous risk assessments, if appropriate.

From Tier 2: (Mission/business process level) Yes Yes Yes

                                                                                                              via         via

- Threat source information and guidance specific to Tier 2 (e.g., threats related to mission/business

                                                                                                             RAR         peer

processes, EA segments, common infrastructure, support services, common controls, and external sharing

dependencies).

- Mission/business process-specific characterization of adversarial and non-adversarial threat

sources.

From Tier 3: (Information system level) Yes Yes Yes

                                                                                                              via         via          via

- Threat source information and guidance specific to Tier 3 (e.g., threats related to information

                                                                                                             RAR         RAR          peer

systems, information technologies, information system components, applications, networks, sharing

environments of operation).

- Information system-specific characterization of adversarial and non-adversarial threat sources.

APPENDIX D PAGE D-1

Special Publication 800-30 Guide for Conducting Risk Assessments


                                        TABLE D-2: TAXONOMY OF THREAT SOURCES
       Type of Threat Source                                     Description                                      Characteristics

ADVERSARIAL Individuals, groups, organizations, or states that seek to Capability, Intent, Targeting

- Individual exploit the organization’s dependence on cyber

- Outsider resources (i.e., information in electronic form, information

- Insider and communications technologies, and the

- Trusted Insider communications and information-handling capabilities

- Privileged Insider provided by those technologies).

- Group

- Ad hoc

- Established

- Organization

- Competitor

- Supplier

- Partner

- Customer

- Nation-State

ACCIDENTAL Erroneous actions taken by individuals in the course of Range of effects

- User executing their everyday responsibilities.

- Privileged User/Administrator

STRUCTURAL Failures of equipment, environmental controls, or Range of effects

- Information Technology (IT) Equipment software due to aging, resource depletion, or other

- Storage circumstances which exceed expected operating

- Processing parameters.

- Communications

- Display

- Sensor

- Controller

- Environmental Controls

- Temperature/Humidity Controls

- Power Supply

- Software

- Operating System

- Networking

- General-Purpose Application

- Mission-Specific Application

ENVIRONMENTAL Natural disasters and failures of critical infrastructures on Range of effects

- Natural or man-made disaster which the organization depends, but which are outside

- Fire the control of the organization.

- Flood/Tsunami Note: Natural and man-made disasters can also be

- Windstorm/Tornado characterized in terms of their severity and/or duration.

- Hurricane However, because the threat source and the threat event

- Earthquake are strongly identified, severity and duration can be

- Bombing included in the description of the threat event (e.g.,

- Overrun Category 5 hurricane causes extensive damage to the

- Unusual Natural Event (e.g., sunspots) facilities housing mission-critical systems, making those

- Infrastructure Failure/Outage systems unavailable for three weeks).

- Telecommunications

- Electrical Power

APPENDIX D PAGE D-2

Special Publication 800-30 Guide for Conducting Risk Assessments


               TABLE D-3: ASSESSMENT SCALE – CHARACTERISTICS OF ADVERSARY CAPABILITY

Qualitative Semi-Quantitative Description

Values Values

                                     The adversary has a very sophisticated level of expertise, is well-resourced, and can generate

Very High 96-100 10

                                     opportunities to support multiple successful, continuous, and coordinated attacks.
                                     The adversary has a sophisticated level of expertise, with significant resources and opportunities
     High         80-95      8
                                     to support multiple successful coordinated attacks.
                                     The adversary has moderate resources, expertise, and opportunities to support multiple successful

Moderate 21-79 5

                                     attacks.
     Low          5-20       2       The adversary has limited resources, expertise, and opportunities to support a successful attack.
                                     The adversary has very limited resources, expertise, and opportunities to support a successful

Very Low 0-4 0

                                     attack.
                TABLE D-4: ASSESSMENT SCALE – CHARACTERISTICS OF ADVERSARY INTENT

Qualitative Semi-Quantitative Description

Values Values

                                     The adversary seeks to undermine, severely impede, or destroy a core mission or business
                                     function, program, or enterprise by exploiting a presence in the organization’s information systems

Very High 96-100 10

                                     or infrastructure. The adversary is concerned about disclosure of tradecraft only to the extent that it
                                     would impede its ability to complete stated goals.
                                     The adversary seeks to undermine/impede critical aspects of a core mission or business function,
                                     program, or enterprise, or place itself in a position to do so in the future, by maintaining a presence
     High         80-95      8
                                     in the organization’s information systems or infrastructure. The adversary is very concerned about
                                     minimizing attack detection/disclosure of tradecraft, particularly while preparing for future attacks.
                                     The adversary seeks to obtain or modify specific critical or sensitive information or usurp/disrupt
                                     the organization’s cyber resources by establishing a foothold in the organization’s information

Moderate 21-79 5 systems or infrastructure. The adversary is concerned about minimizing attack detection/disclosure

                                     of tradecraft, particularly when carrying out attacks over long time periods. The adversary is willing
                                     to impede aspects of the organization’s missions/business functions to achieve these ends.
                                     The adversary actively seeks to obtain critical or sensitive information or to usurp/disrupt the
     Low          5-20       2       organization’s cyber resources, and does so without concern about attack detection/disclosure of
                                     tradecraft.
                                     The adversary seeks to usurp, disrupt, or deface the organization’s cyber resources, and does so

Very Low 0-4 0

                                     without concern about attack detection/disclosure of tradecraft.
               TABLE D-5: ASSESSMENT SCALE – CHARACTERISTICS OF ADVERSARY TARGETING

Qualitative Semi-Quantitative Description

Values Values

                                     The adversary analyzes information obtained via reconnaissance and attacks to target persistently
                                     a specific organization, enterprise, program, mission or business function, focusing on specific

Very High 96-100 10

                                     high-value or mission-critical information, resources, supply flows, or functions; specific employees
                                     or positions; supporting infrastructure providers/suppliers; or partnering organizations.
                                     The adversary analyzes information obtained via reconnaissance to target persistently a specific
                                     organization, enterprise, program, mission or business function, focusing on specific high-value or
     High         80-95      8
                                     mission-critical information, resources, supply flows, or functions, specific employees supporting
                                     those functions, or key positions.
                                     The adversary analyzes publicly available information to target persistently specific high-value

Moderate 21-79 5

                                     organizations (and key positions, such as Chief Information Officer), programs, or information.
                                     The adversary uses publicly available information to target a class of high-value organizations or
     Low          5-20       2
                                     information, and seeks targets of opportunity within that class.

Very Low 0-4 0 The adversary may or may not target any specific organizations or classes of organizations.

APPENDIX D PAGE D-3

Special Publication 800-30 Guide for Conducting Risk Assessments


    TABLE D-6: ASSESSMENT SCALE – RANGE OF EFFECTS FOR NON-ADVERSARIAL THREAT SOURCES

Qualitative Semi-Quantitative Description

Values Values

                                      The effects of the error, accident, or act of nature are sweeping, involving almost all of the cyber

Very High 96-100 10 resources of the [Tier 3: information systems; Tier 2: mission/business processes or EA segments,

                                      common infrastructure, or support services; Tier 1: organization/governance structure].
                                      The effects of the error, accident, or act of nature are extensive, involving most of the cyber
                                      resources of the [Tier 3: information systems; Tier 2: mission/business processes or EA segments,
     High          80-95      8
                                      common infrastructure, or support services; Tier 1: organization/governance structure], including
                                      many critical resources.
                                      The effects of the error, accident, or act of nature are wide-ranging, involving a significant portion
                                      of the cyber resources of the [Tier 3: information systems; Tier 2: mission/business processes or

Moderate 21-79 5

                                      EA segments, common infrastructure, or support services; Tier 1: organization/governance
                                      structure], including some critical resources.
                                      The effects of the error, accident, or act of nature are limited, involving some of the cyber
                                      resources of the [Tier 3: information systems; Tier 2: mission/business processes or EA segments,
     Low           5-20       2
                                      common infrastructure, or support services; Tier 1: organization/governance structure], but
                                      involving no critical resources.
                                      The effects of the error, accident, or act of nature are minimal, involving few if any of the cyber
                                      resources of the [Tier 3: information systems; Tier 2: mission/business processes or EA segments,

Very Low 0-4 0

                                      common infrastructure, or support services; Tier 1: organization/governance structure], and
                                      involving no critical resources.
                  TABLE D-7: TEMPLATE – IDENTIFICATION OF ADVERSARIAL THREAT SOURCES

Identifier Threat Source In Capability Intent Targeting

                             Source of Information                           Scope
                                                                                            Table D-3         Table D-4           Table D-5

Organization Table D-2 and Task 1-4

                                                                                                or                or                  or

-defined or Yes / No

                                                                                           Organization      Organization        Organization
                               Organization-defined
                                                                                             -defined          -defined            -defined
                TABLE D-8: TEMPLATE – IDENTIFICATION OF NON-ADVERSARIAL THREAT SOURCES

Identifier Threat Source In Range of Effects

                             Source of Information                           Scope
                              Table D-2 and Task 1-4                                                          Table D-6

Organization or Yes / No or

-defined Organization-defined Organization-defined

APPENDIX D PAGE D-4

Special Publication 800-30 Guide for Conducting Risk Assessments


APPENDIX E

THREAT EVENTS

REPRESENTATIVE THREAT EVENTS INITIATED BY THREAT SOURCES

T his appendix provides: (i) a description of potentially useful inputs to the threat event

       identification task; (ii) representative examples of adversarial threat events expressed as
       tactics, techniques, and procedures (TTPs) and non-adversarial threat events; (iii) an

exemplary assessment scale for the relevance of those threat events; and (iv) templates for

summarizing and documenting the results of the threat identification Task 2-2. Organizations can

eliminate certain threat events from further consideration if no adversary with the necessary

capability has been identified. 51 Organizations can also modify the threat events provided to

describe specific TTPs with sufficient detail 52 and at the appropriate classification level. 53

Organizations can use the representative threat events and predicated/expected values for the

relevance of those events as a starting point with tailoring to adjust for any organization-specific

conditions. Table E-5, an output from Task 2-2, provides relevant inputs to the risk tables in

Appendix I.

                                     TABLE E-1: INPUTS – THREAT EVENT IDENTIFICATION
                                                                                                                      Provided To
                                             Description
                                                                                                             Tier 1     Tier 2      Tier 3

From Tier 1: (Organization level) No Yes Yes

                                                                                                                                      If not

- Sources of threat information deemed to be credible (e.g., open source and/or classified threat

                                                                                                                                    provided

reports, previous risk/threat assessments. (Section 3.1, Task 1-4.) by Tier 2

- Threat event information and guidance specific to Tier 1 (e.g., threats related to organizational

governance, core missions/business functions, external mission/business relationships,

management/operational policies, procedures, and structures).

- Exemplary adversarial threat events, annotated by the organization, if necessary. (Table E-2)

- Exemplary non-adversarial threat events, annotated by the organization, if necessary. (Table E-3)

- Assessment scale for assessing the relevance of threat events, annotated by the organization, if

necessary. (Table E-4)

- Threat events identified in previous risk assessments, if appropriate.

From Tier 2: (Mission/business process level) Yes Yes Yes

                                                                                                              Via          Via

- Threat event information and guidance specific to Tier 2 (e.g., threats related to mission/business

                                                                                                              RAR         Peer

processes, EA segments, common infrastructure, support services, common controls, and external Sharing

dependencies).

- Mission/business process-specific characterization of adversarial and non-adversarial threat events.

From Tier 3: (Information system level) Yes Yes Yes

                                                                                                              Via         Via         Via

- Threat event information and guidance specific to Tier 3 (e.g., threats related to information systems,

                                                                                                              RAR         RAR        Peer

information technologies, information system components, applications, networks, environments of Sharing

operation).

- Information system-specific characterization of adversarial and non-adversarial threat events.

- Incident reports.

51

Each entry in Table E-2 implicitly assumes a level of adversary capability, intent, and targeting. Depending on the

results of threat source identification, some entries could be determined to be irrelevant, while other entries could be

combined. In addition, some entries could be rewritten in terms of an organization’s enterprise architecture.

52

The level of detail of TTPs is established as part of the organizational risk frame. The level of detail in Table E-2 is

intended to support risk assessments at all three tiers, and to be tailorable to include additional details, as necessary.

More detailed descriptions of threat events that exploit software, for example, can be found in the Common Attack

Pattern Enumeration and Classification (CAPEC) site at http://capec.mitre.org.

53

The threat events in Table E-2 are provided at the unclassified level. Additional threat events at the classified level

are available from selected federal agencies to individuals with appropriate security clearances and need to know.

APPENDIX E PAGE E-1

Special Publication 800-30 Guide for Conducting Risk Assessments


                                                                                                                                 54
                      TABLE E-2: REPRESENTATIVE EXAMPLES – ADVERSARIAL THREAT EVENTS
                    Threat Events                                                                 Description
                 (Characterized by TTPs)
                                                 Perform reconnaissance and gather information.

Perform perimeter network reconnaissance/scanning. Adversary uses commercial or free software to scan organizational perimeters to

                                                              obtain a better understanding of the information technology infrastructure and
                                                              improve the ability to launch successful attacks.

Perform network sniffing of exposed networks. Adversary with access to exposed wired or wireless data channels used to transmit

                                                              information, uses network sniffing to identify components, resources, and
                                                              protections.

Gather information using open source discovery of Adversary mines publically accessible information to gather information about

organizational information. organizational information systems, business processes, users or personnel, or

                                                              external relationships that the adversary can subsequently employ in support of an
                                                              attack.

Perform reconnaissance and surveillance of targeted Adversary uses various means (e.g., scanning, physical observation) over time to

organizations. examine and assess organizations and ascertain points of vulnerability.

Perform malware-directed internal reconnaissance. Adversary uses malware installed inside the organizational perimeter to identify

                                                              targets of opportunity. Because the scanning, probing, or observation does not cross
                                                              the perimeter, it is not detected by externally placed intrusion detection systems.
                                                            Craft or create attack tools.

Craft phishing attacks. Adversary counterfeits communications from a legitimate/trustworthy source to

                                                              acquire sensitive information such as usernames, passwords, or SSNs. Typical
                                                              attacks occur via email, instant messaging, or comparable means; commonly
                                                              directing users to websites that appear to be legitimate sites, while actually stealing
                                                              the entered information.

Craft spear phishing attacks. Adversary employs phishing attacks targeted at high value targets (e.g., senior

                                                              leaders/executives).

Craft attacks specifically based on deployed information Adversary develops attacks (e.g., crafts targeted malware) that take advantage of

technology environment. adversary knowledge of the organizational information technology environment.

Create counterfeit/spoof website. Adversary creates duplicates of legitimate websites; when users visit a counterfeit

                                                              site, the site can gather information or download malware.

Craft counterfeit certificates. Adversary counterfeits or compromises a certificate authority, so that malware or

                                                              connections will appear legitimate.

Create and operate false front organizations to inject Adversary creates false front organizations with the appearance of legitimate

malicious components into the supply chain. suppliers in the critical life-cycle path that then inject corrupted/malicious information

                                                              system components into the organizational supply chain.
                                                    Deliver/insert/install malicious capabilities.

Deliver known malware to internal organizational Adversary uses common delivery mechanisms (e.g., email) to install/insert known

information systems (e.g., virus via email). malware (e. g., malware whose existence is known) into organizational information

                                                              systems.

Deliver modified malware to internal organizational Adversary uses more sophisticated delivery mechanisms than email (e.g., web

information systems. traffic, instant messaging, FTP) to deliver malware and possibly modifications of

                                                              known malware to gain access to internal organizational information systems.

Deliver targeted malware for control of internal systems Adversary installs malware that is specifically designed to take control of internal

and exfiltration of data. organizational information systems, identify sensitive information, exfiltrate the

                                                              information back to adversary, and conceal these actions.

Deliver malware by providing removable media. Adversary places removable media (e.g., flash drives) containing malware in

                                                              locations external to organizational physical perimeters but where employees are
                                                              likely to find the media (e.g., facilities parking lots, exhibits at conferences attended
                                                              by employees) and use it on organizational information systems.

54

While not restricted to the APT as a threat source, the threat events in Table E-2 generally follow the flow of an APT

campaign. Within each stage in a campaign, similar events are listed in order of adversary capability.

APPENDIX E PAGE E-2

Special Publication 800-30 Guide for Conducting Risk Assessments


                    Threat Events                                                                 Description
                (Characterized by TTPs)

Insert untargeted malware into downloadable software Adversary corrupts or inserts malware into common freeware, shareware or

and/or into commercial information technology products. commercial information technology products. Adversary is not targeting specific

                                                               organizations, simply looking for entry points into internal organizational information
                                                               systems. Note that this is particularly a concern for mobile applications.

Insert targeted malware into organizational information Adversary inserts malware into organizational information systems and information

systems and information system components. system components (e.g., commercial information technology products), specifically

                                                               targeted to the hardware, software, and firmware used by organizations (based on
                                                               knowledge gained via reconnaissance).

Insert specialized malware into organizational Adversary inserts specialized, non-detectable, malware into organizational

information systems based on system configurations. information systems based on system configurations, specifically targeting critical

                                                               information system components based on reconnaissance and placement within
                                                               organizational information systems.

Insert counterfeit or tampered hardware into the supply Adversary intercepts hardware from legitimate suppliers. Adversary modifies the

chain. hardware or replaces it with faulty or otherwise modified hardware.

Insert tampered critical components into organizational Adversary replaces, though supply chain, subverted insider, or some combination

systems. thereof, critical information system components with modified or corrupted

                                                               components.

Install general-purpose sniffers on organization- Adversary installs sniffing software onto internal organizational information systems

controlled information systems or networks. or networks.

Install persistent and targeted sniffers on organizational Adversary places within internal organizational information systems or networks

information systems and networks. software designed to (over a continuous period of time) collect (sniff) network traffic.

Insert malicious scanning devices (e.g., wireless Adversary uses postal service or other commercial delivery services to deliver to

sniffers) inside facilities. organizational mailrooms a device that is able to scan wireless communications

                                                               accessible from within the mailrooms and then wirelessly transmit information back
                                                               to adversary.

Insert subverted individuals into organizations. Adversary places individuals within organizations who are willing and able to carry

                                                               out actions to cause harm to organizational missions/business functions.

Insert subverted individuals into privileged positions in Adversary places individuals in privileged positions within organizations who are

organizations. willing and able to carry out actions to cause harm to organizational

                                                               missions/business functions. Adversary may target privileged functions to gain
                                                               access to sensitive information (e.g., user accounts, system files, etc.) and may
                                                               leverage access to one privileged capability to get to another capability.
                                                              Exploit and compromise.

Exploit physical access of authorized staff to gain Adversary follows (“tailgates”) authorized individuals into secure/controlled locations

access to organizational facilities. with the goal of gaining access to facilities, circumventing physical security checks.

Exploit poorly configured or unauthorized information Adversary gains access through the Internet to information systems that are not

systems exposed to the Internet. authorized for Internet connectivity or that do not meet organizational configuration

                                                               requirements.

Exploit split tunneling. Adversary takes advantage of external organizational or personal information

                                                               systems (e.g., laptop computers at remote locations) that are simultaneously
                                                               connected securely to organizational information systems or networks and to
                                                               nonsecure remote connections.

Exploit multi-tenancy in a cloud environment. Adversary, with processes running in an organizationally-used cloud environment,

                                                               takes advantage of multi-tenancy to observe behavior of organizational processes,
                                                               acquire organizational information, or interfere with the timely or correct functioning
                                                               of organizational processes.

Exploit known vulnerabilities in mobile systems (e.g., Adversary takes advantage of fact that transportable information systems are

laptops, PDAs, smart phones). outside physical protection of organizations and logical protection of corporate

                                                               firewalls, and compromises the systems based on known vulnerabilities to gather
                                                               information from those systems.

Exploit recently discovered vulnerabilities. Adversary exploits recently discovered vulnerabilities in organizational information

                                                               systems in an attempt to compromise the systems before mitigation measures are
                                                               available or in place.

APPENDIX E PAGE E-3

Special Publication 800-30 Guide for Conducting Risk Assessments


                    Threat Events                                                                 Description
                (Characterized by TTPs)

Exploit vulnerabilities on internal organizational Adversary searches for known vulnerabilities in organizational internal information

information systems. systems and exploits those vulnerabilities.

Exploit vulnerabilities using zero-day attacks. Adversary employs attacks that exploit as yet unpublicized vulnerabilities. Zero-day

                                                               attacks are based on adversary insight into the information systems and applications
                                                               used by organizations as well as adversary reconnaissance of organizations.

Exploit vulnerabilities in information systems timed with Adversary launches attacks on organizations in a time and manner consistent with

organizational mission/business operations tempo. organizational needs to conduct mission/business operations.

Exploit insecure or incomplete data deletion in multi- Adversary obtains unauthorized information due to insecure or incomplete data

tenant environment. deletion in a multi-tenant environment (e.g., in a cloud computing environment).

Violate isolation in multi-tenant environment. Adversary circumvents or defeats isolation mechanisms in a multi-tenant

                                                               environment (e.g., in a cloud computing environment) to observe, corrupt, or deny
                                                               service to hosted services and information/data.

Compromise critical information systems via physical Adversary obtains physical access to organizational information systems and makes

access. modifications.

Compromise information systems or devices used Adversary installs malware on information systems or devices while the

externally and reintroduced into the enterprise. systems/devices are external to organizations for purposes of subsequently infecting

                                                               organizations when reconnected.

Compromise software of organizational critical Adversary inserts malware or otherwise corrupts critical internal organizational

information systems. information systems.

Compromise organizational information systems to Adversary implants malware into internal organizational information systems, where

facilitate exfiltration of data/information. the malware over time can identify and then exfiltrate valuable information.

Compromise mission-critical information. Adversary compromises the integrity of mission-critical information, thus preventing

                                                               or impeding ability of organizations to which information is supplied, from carrying
                                                               out operations.

Compromise design, manufacture, and/or distribution of Adversary compromises the design, manufacture, and/or distribution of critical

information system components (including hardware, information system components at selected suppliers.

software, and firmware).

                                        Conduct an attack (i.e., direct/coordinate attack tools or activities).

Conduct communications interception attacks. Adversary takes advantage of communications that are either unencrypted or use

                                                               weak encryption (e.g., encryption containing publically known flaws), targets those
                                                               communications, and gains access to transmitted information and channels.

Conduct wireless jamming attacks. Adversary takes measures to interfere with wireless communications so as to

                                                               impede or prevent communications from reaching intended recipients.

Conduct attacks using unauthorized ports, protocols and Adversary conducts attacks using ports, protocols, and services for ingress and

services. egress that are not authorized for use by organizations.

Conduct attacks leveraging traffic/data movement Adversary makes use of permitted information flows (e.g., email communication,

allowed across perimeter. removable storage) to compromise internal information systems, which allows

                                                               adversary to obtain and exfiltrate sensitive information through perimeters.

Conduct simple Denial of Service (DoS) attack. Adversary attempts to make an Internet-accessible resource unavailable to intended

                                                               users, or prevent the resource from functioning efficiently or at all, temporarily or
                                                               indefinitely.

Conduct Distributed Denial of Service (DDoS) attacks. Adversary uses multiple compromised information systems to attack a single target,

                                                               thereby causing denial of service for users of the targeted information systems.

Conduct targeted Denial of Service (DoS) attacks. Adversary targets DoS attacks to critical information systems, components, or

                                                               supporting infrastructures, based on adversary knowledge of dependencies.

Conduct physical attacks on organizational facilities. Adversary conducts a physical attack on organizational facilities (e.g., sets a fire).

Conduct physical attacks on infrastructures supporting Adversary conducts a physical attack on one or more infrastructures supporting

organizational facilities. organizational facilities (e.g., breaks a water main, cuts a power line).

Conduct cyber-physical attacks on organizational Adversary conducts a cyber-physical attack on organizational facilities (e.g.,

facilities. remotely changes HVAC settings).

APPENDIX E PAGE E-4

Special Publication 800-30 Guide for Conducting Risk Assessments


                    Threat Events                                                                Description
                (Characterized by TTPs)

Conduct data scavenging attacks in a cloud Adversary obtains data used and then deleted by organizational processes running

environment. in a cloud environment.

Conduct brute force login attempts/password guessing Adversary attempts to gain access to organizational information systems by random

attacks. or systematic guessing of passwords, possibly supported by password cracking

                                                              utilities.

Conduct nontargeted zero-day attacks. Adversary employs attacks that exploit as yet unpublicized vulnerabilities. Attacks

                                                              are not based on any adversary insights into specific vulnerabilities of organizations.

Conduct externally-based session hijacking. Adversary takes control of (hijacks) already established, legitimate information

                                                              system sessions between organizations and external entities (e.g., users connecting
                                                              from off-site locations).

Conduct internally-based session hijacking. Adversary places an entity within organizations in order to gain access to

                                                              organizational information systems or networks for the express purpose of taking
                                                              control (hijacking) an already established, legitimate session either between
                                                              organizations and external entities (e.g., users connecting from remote locations) or
                                                              between two locations within internal networks.

Conduct externally-based network traffic modification Adversary, operating outside organizational systems, intercepts/eavesdrops on

(man in the middle) attacks. sessions between organizational and external systems. Adversary then relays

                                                              messages between organizational and external systems, making them believe that
                                                              they are talking directly to each other over a private connection, when in fact the
                                                              entire communication is controlled by the adversary. Such attacks are of particular
                                                              concern for organizational use of community, hybrid, and public clouds.

Conduct internally-based network traffic modification Adversary operating within the organizational infrastructure intercepts and corrupts

(man in the middle) attacks. data sessions.

Conduct outsider-based social engineering to obtain Externally placed adversary takes actions (e.g., using email, phone) with the intent

information. of persuading or otherwise tricking individuals within organizations into revealing

                                                              critical/sensitive information (e.g., personally identifiable information).

Conduct insider-based social engineering to obtain Internally placed adversary takes actions (e.g., using email, phone) so that

information. individuals within organizations reveal critical/sensitive information (e.g., mission

                                                              information).

Conduct attacks targeting and compromising personal Adversary targets key organizational employees by placing malware on their

devices of critical employees. personally owned information systems and devices (e.g., laptop/notebook

                                                              computers, personal digital assistants, smart phones). The intent is to take
                                                              advantage of any instances where employees use personal information systems or
                                                              devices to handle critical/sensitive information.

Conduct supply chain attacks targeting and exploiting Adversary targets and compromises the operation of software (e.g., through

critical hardware, software, or firmware. malware injections), firmware, and hardware that performs critical functions for

                                                              organizations. This is largely accomplished as supply chain attacks on both
                                                              commercial off-the-shelf and custom information systems and components.
                                         Achieve results (i.e., cause adverse impacts, obtain information)

Obtain sensitive information through network sniffing of Adversary with access to exposed wired or wireless data channels that

external networks. organizations (or organizational personnel) use to transmit information (e.g., kiosks,

                                                              public wireless networks) intercepts communications.

Obtain sensitive information via exfiltration. Adversary directs malware on organizational systems to locate and surreptitiously

                                                              transmit sensitive information.

Cause degradation or denial of attacker-selected Adversary directs malware on organizational systems to impair the correct and

services or capabilities. timely support of organizational mission/business functions.

Cause deterioration/destruction of critical information Adversary destroys or causes deterioration of critical information system

system components and functions. components to impede or eliminate organizational ability to carry out missions or

                                                              business functions. Detection of this action is not a concern.

Cause integrity loss by creating, deleting, and/or Adversary vandalizes, or otherwise makes unauthorized changes to, organizational

modifying data on publicly accessible information websites or data on websites.

systems (e.g., web defacement).

Cause integrity loss by polluting or corrupting critical Adversary implants corrupted and incorrect data in critical data, resulting in

data. suboptimal actions or loss of confidence in organizational data/services.

APPENDIX E PAGE E-5

Special Publication 800-30 Guide for Conducting Risk Assessments


                    Threat Events                                                                  Description
                (Characterized by TTPs)

Cause integrity loss by injecting false but believable data Adversary injects false but believable data into organizational information systems,

into organizational information systems. resulting in suboptimal actions or loss of confidence in organizational data/services.

Cause disclosure of critical and/or sensitive information Adversary induces (e.g., via social engineering) authorized users to inadvertently

by authorized users. expose, disclose, or mishandle critical/sensitive information.

Cause unauthorized disclosure and/or unavailability by Adversary contaminates organizational information systems (including devices and

spilling sensitive information. networks) by causing them to handle information of a classification/sensitivity for

                                                                which they have not been authorized. The information is exposed to individuals who
                                                                are not authorized access to such information, and the information system, device,
                                                                or network is unavailable while the spill is investigated and mitigated.

Obtain information by externally located interception of Adversary intercepts organizational communications over wireless networks.

wireless network traffic. Examples include targeting public wireless access or hotel networking connections,

                                                                and drive-by subversion of home or organizational wireless routers.

Obtain unauthorized access. Adversary with authorized access to organizational information systems, gains

                                                                access to resources that exceeds authorization.

Obtain sensitive data/information from publicly Adversary scans or mines information on publically accessible servers and web

accessible information systems. pages of organizations with the intent of finding sensitive information.

Obtain information by opportunistically stealing or Adversary steals information systems or components (e. g., laptop computers or

scavenging information systems/components. data storage media) that are left unattended outside of the physical perimeters of

                                                                organizations, or scavenges discarded components.
                                                       Maintain a presence or set of capabilities.

Obfuscate adversary actions. Adversary takes actions to inhibit the effectiveness of the intrusion detection

                                                                systems or auditing capabilities within organizations.

Adapt cyber attacks based on detailed surveillance. Adversary adapts behavior in response to surveillance and organizational security

                                                                measures.
                                                                Coordinate a campaign.

Coordinate a campaign of multi-staged attacks (e.g., Adversary moves the source of malicious commands or actions from one

hopping). compromised information system to another, making analysis difficult.

Coordinate a campaign that combines internal and Adversary combines attacks that require both physical presence within

external attacks across multiple information systems and organizational facilities and cyber methods to achieve success. Physical attack

information technologies. steps may be as simple as convincing maintenance personnel to leave doors or

                                                                cabinets open.

Coordinate campaigns across multiple organizations to Adversary does not limit planning to the targeting of one organization. Adversary

acquire specific information or achieve desired outcome. observes multiple organizations to acquire necessary information on targets of

                                                                interest.

Coordinate a campaign that spreads attacks across Adversary uses existing presence within organizational systems to extend the

organizational systems from existing presence. adversary’s span of control to other organizational systems including organizational

                                                                infrastructure. Adversary thus is in position to further undermine organizational
                                                                ability to carry out missions/business functions.

Coordinate a campaign of continuous, adaptive, and Adversary attacks continually change in response to surveillance and organizational

changing cyber attacks based on detailed surveillance. security measures.

Coordinate cyber attacks using external (outsider), Adversary employs continuous, coordinated attacks, potentially using all three attack

internal (insider), and supply chain (supplier) attack vectors for the purpose of impeding organizational operations.

vectors.

APPENDIX E PAGE E-6

Special Publication 800-30 Guide for Conducting Risk Assessments


                    TABLE E-3: REPRESENTATIVE EXAMPLES – NON-ADVERSARIAL THREAT EVENTS

Threat Event Description

Spill sensitive Authorized user erroneously contaminates a device, information system, or network by placing on it or sending to it

information information of a classification/sensitivity which it has not been authorized to handle. The information is exposed to

                            access by unauthorized individuals, and as a result, the device, system, or network is unavailable while the spill is
                            investigated and mitigated.

Mishandling of critical Authorized privileged user inadvertently exposes critical/sensitive information.

and/or sensitive

information by

authorized users

Incorrect privilege Authorized privileged user or administrator erroneously assigns a user exceptional privileges or sets privilege

settings requirements on a resource too low.

Communications Degraded communications performance due to contention.

contention

Unreadable display Display unreadable due to aging equipment.

Earthquake at primary Earthquake of organization-defined magnitude at primary facility makes facility inoperable.

facility

Fire at primary facility Fire (not due to adversarial activity) at primary facility makes facility inoperable.

Fire at backup facility Fire (not due to adversarial activity) at backup facility makes facility inoperable or destroys backups of software,

                            configurations, data, and/or logs.

Flood at primary Flood (not due to adversarial activity) at primary facility makes facility inoperable.

facility

Flood at backup Flood (not due to adversarial activity) at backup facility makes facility inoperable or destroys backups of software,

facility configurations, data, and/or logs.

Hurricane at primary Hurricane of organization-defined strength at primary facility makes facility inoperable.

facility

Hurricane at backup Hurricane of organization-defined strength at backup facility makes facility inoperable or destroys backups of software,

facility configurations, data, and/or logs.

Resource depletion Degraded processing performance due to resource depletion.

Introduction of Due to inherent weaknesses in programming languages and software development environments, errors and

vulnerabilities into vulnerabilities are introduced into commonly used software products.

software products

Disk error Corrupted storage due to a disk error.

Pervasive disk error Multiple disk errors due to aging of a set of devices all acquired at the same time, from the same supplier.

Windstorm/tornado at Windstorm/tornado of organization-defined strength at primary facility makes facility inoperable.

primary facility

Windstorm/tornado at Windstorm/tornado of organization-defined strength at backup facility makes facility inoperable or destroys backups of

backup facility software, configurations, data, and/or logs.

APPENDIX E PAGE E-7

Special Publication 800-30 Guide for Conducting Risk Assessments


                                          TABLE E-4: RELEVANCE OF THREAT EVENTS

Value Description

Confirmed The threat event or TTP has been seen by the organization.

Expected The threat event or TTP has been seen by the organization’s peers or partners.

Anticipated The threat event or TTP has been reported by a trusted source.

Predicted The threat event or TTP has been predicted by a trusted source.

Possible The threat event or TTP has been described by a somewhat credible source.

     N/A        The threat event or TTP is not currently applicable. For example, a threat event or TTP could assume specific technologies,
                architectures, or processes that are not present in the organization, mission/business process, EA segment, or information
                system; or predisposing conditions that are not present (e.g., location in a flood plain). Alternately, if the organization is using
                detailed or specific threat information, a threat event or TTP could be deemed inapplicable because information indicates that
                no adversary is expected to initiate the threat event or use the TTP.
                              TABLE E-5: TEMPLATE – IDENTIFICATION OF THREAT EVENTS

Identifier Threat Event Threat Source Relevance

                                        Source of Information
                                       Table E-2, Table E-3, Task 1-4                                   Table D-7, Table D-8             Table E-4

Organization or or

                                                                                                                 or

-defined Organization-defined Organization-

                                                                                                        Organization-defined
                                                                                                                                          defined

APPENDIX E PAGE E-8

Special Publication 800-30 Guide for Conducting Risk Assessments


APPENDIX F

VULNERABILITIES AND PREDISPOSING CONDITIONS

RISK FACTORS AFFECTING THE LIKELIHOOD OF SUCCESSFUL THREAT EXPLOITATION

T his appendix provides: (i) a description of potentially useful inputs to the vulnerability and

       predisposing condition identification task; (ii) an exemplary taxonomy of predisposing
       conditions; (iii) exemplary assessment scales for assessing the severity of vulnerabilities

and the pervasiveness of predisposing conditions; and (iv) a set of templates for summarizing and

documenting the results of the vulnerability and predisposing condition identification task. The

taxonomy and assessment scales in this appendix can be used by organizations as a starting point

with appropriate tailoring to adjust for any organization-specific conditions. Tables F-3 and F-6,

outputs from Task 2-3, provide relevant inputs to the risk tables in Appendix I.

                        TABLE F-1: INPUTS – VULNERABILITIES AND PREDISPOSING CONDITIONS
                                                                                                                         Provided To
                                              Description
                                                                                                                Tier 1     Tier 2      Tier 3

From Tier 1 (Organization level) No Yes Yes

                                                                                                                                         If not

- Sources of vulnerability information deemed to be credible (e.g., open source and/or classified

                                                                                                                                       provided

vulnerabilities, previous risk/vulnerability assessments, Mission and/or Business Impact Analyses). by Tier 2

(Section 3.1, Task 1-4.)

- Vulnerability information and guidance specific to Tier 1 (e.g., vulnerabilities related to organizational

governance, core missions/business functions, management/operational policies, procedures, and

structures, external mission/business relationships).

- Taxonomy of predisposing conditions, annotated by the organization, if necessary. (Table F-4)

- Characterization of vulnerabilities and predisposing conditions.

- Assessment scale for assessing the severity of vulnerabilities, annotated by the organization, if

      necessary. (Table F-2)

- Assessment scale for assessing the pervasiveness of predisposing conditions, annotated by the

      organization, if necessary. (Table F-5)

- Business Continuity Plan, Continuity of Operations Plan for the organization, if such plans are

      defined for the entire organization.

From Tier 2: (Mission/business process level) Yes Yes Yes

                                                                                                                 Via          Via

- Vulnerability information and guidance specific to Tier 2 (e.g., vulnerabilities related to organizational

                                                                                                                 RAR         Peer

mission/business processes, EA segments, common infrastructure, support services, common Sharing

controls, and external dependencies).

- Business Continuity Plans, Continuity of Operations Plans for mission/business processes, if such

plans are defined for individual processes or business units.

From Tier 3: (Information system level) Yes Yes Yes

                                                                                                                 Via         Via         Via

- Vulnerability information and guidance specific to Tier 3 (e.g., vulnerabilities related to information

                                                                                                                 RAR         RAR        Peer

systems, information technologies, information system components, applications, networks, Sharing

environments of operation).

- Security assessment reports (i.e., deficiencies in assessed controls identified as vulnerabilities).

- Results of monitoring activities (e.g., automated and nonautomated data feeds).

- Vulnerability assessments, Red Team reports, or other reports from analyses of information systems,

subsystems, information technology products, devices, networks, or applications.

- Contingency Plans, Disaster Recovery Plans, Incident Reports.

- Vendor/manufacturer vulnerability reports.

APPENDIX F PAGE F-1

Special Publication 800-30 Guide for Conducting Risk Assessments


                           TABLE F-2: ASSESSMENT SCALE – VULNERABILITY SEVERITY

Qualitative Semi-Quantitative Description

Values Values

                                      The vulnerability is exposed and exploitable, and its exploitation could result in severe impacts.

Very High 96-100 10 Relevant security control or other remediation is not implemented and not planned; or no security

                                      measure can be identified to remediate the vulnerability.
                                      The vulnerability is of high concern, based on the exposure of the vulnerability and ease of
                                      exploitation and/or on the severity of impacts that could result from its exploitation.
      High         80-95       8
                                      Relevant security control or other remediation is planned but not implemented; compensating
                                      controls are in place and at least minimally effective.
                                      The vulnerability is of moderate concern, based on the exposure of the vulnerability and ease of

Moderate 21-79 5 exploitation and/or on the severity of impacts that could result from its exploitation.

                                      Relevant security control or other remediation is partially implemented and somewhat effective.
                                      The vulnerability is of minor concern, but effectiveness of remediation could be improved.
      Low          5-20        2
                                      Relevant security control or other remediation is fully implemented and somewhat effective.
                                      The vulnerability is not of concern.

Very Low 0-4 0

                                      Relevant security control or other remediation is fully implemented, assessed, and effective.
                           TABLE F-3: TEMPLATE – IDENTIFICATION OF VULNERABILITIES

Identifier Vulnerability Vulnerability

                                            Source of Information                                                      Severity
                                                Task 2-3, Task 1-4                                                     Table F-2

Organization- or or

    defined                                     Organization-defined                                               Organization-defined

APPENDIX F PAGE F-2

Special Publication 800-30 Guide for Conducting Risk Assessments


                                     TABLE F-4: TAXONOMY OF PREDISPOSING CONDITIONS
             Type of Predisposing Condition                                                             Description

INFORMATION-RELATED Needs to handle information (as it is created, transmitted, stored,

- Classified National Security Information processed, and/or displayed) in a specific manner, due to its sensitivity

- Compartments (or lack of sensitivity), legal or regulatory requirements, and/or contractual

- Controlled Unclassified Information or other organizational agreements.

- Personally Identifiable Information

- Special Access Programs

- Agreement-Determined

    - NOFORN
    - Proprietary

TECHNICAL Needs to use technologies in specific ways.

- Architectural

    - Compliance with technical standards
    - Use of specific products or product lines
    - Solutions for and/or approaches to user-based collaboration
      and information sharing
    - Allocation of specific security functionality to common controls

- Functional

    - Networked multiuser
    - Single-user
    - Stand-alone / nonnetworked
    - Restricted functionality (e.g., communications, sensors,
      embedded controllers)

OPERATIONAL / ENVIRONMENTAL Ability to rely upon physical, procedural, and personnel controls provided

- Mobility by the operational environment.

    - Fixed-site (specify location)
    - Semi-mobile
       - Land-based, Airborne, Sea-based, Space-based
    - Mobile (e.g., handheld device)

- Population with physical and/or logical access to components

of the information system, mission/business process, EA segment

    - Size of population
    - Clearance/vetting of population
                TABLE F-5: ASSESSMENT SCALE – PERVASIVENESS OF PREDISPOSING CONDITIONS

Qualitative Semi-Quantitative Description

Values Values

                                                 Applies to all organizational missions/business functions (Tier 1), mission/business processes

Very High 96-100 10

                                                 (Tier 2), or information systems (Tier 3).
                                                 Applies to most organizational missions/business functions (Tier 1), mission/business processes
      High            80-95            8
                                                 (Tier 2), or information systems (Tier 3).
                                                 Applies to many organizational missions/business functions (Tier 1), mission/business processes

Moderate 21-79 5

                                                 (Tier 2), or information systems (Tier 3).
                                                 Applies to some organizational missions/business functions (Tier 1), mission/business processes
      Low              5-20            2
                                                 (Tier 2), or information systems (Tier 3).
                                                 Applies to few organizational missions/business functions (Tier 1), mission/business processes

Very Low 0-4 0

                                                 (Tier 2), or information systems (Tier 3).

APPENDIX F PAGE F-3

Special Publication 800-30 Guide for Conducting Risk Assessments


                   TABLE F-6: TEMPLATE – IDENTIFICATION OF PREDISPOSING CONDITIONS

Identifier Predisposing Condition Pervasiveness

                                      Source of Information                           of Condition
                                        Table F-4, Task 1-4                             Table F-5

Organization- or or

    defined                             Organization-defined                        Organization-defined

APPENDIX F PAGE F-4

Special Publication 800-30 Guide for Conducting Risk Assessments


APPENDIX G

LIKELIHOOD OF OCCURRENCE

DETERMINING THE LIKELIHOOD OF THREAT EVENTS CAUSING ADVERSE IMPACTS

T his appendix provides: (i) a description of potentially useful inputs to the likelihood 55

       determination task; and (ii) exemplary assessment scales for assessing the likelihood of
       threat event initiation/occurrence, the likelihood of threat events resulting in adverse

impacts, and the overall likelihood of threat events being initiated or occurring and doing damage

to organizational operations, assets, or individuals. The assessment scales in this appendix can be

used by organizations as a starting point with appropriate tailoring to adjust for any organization-

specific conditions. Tables G-2, G-3, G-4, and G-5, outputs from Task 2-4, provide relevant

inputs to the risk tables in Appendix I.

                                    TABLE G-1: INPUTS – DETERMINATION OF LIKELIHOOD
                                                                                                                      Provided To
                                            Description
                                                                                                             Tier 1     Tier 2      Tier 3

From Tier 1 (Organization level) No Yes Yes

                                                                                                                                      If not

- Likelihood information and guidance specific to Tier 1 (e.g., likelihood information related to

                                                                                                                                    provided

organizational governance, core missions/business functions, management/operational policies, by Tier 2

procedures, and structures, external mission/business relationships).

- Guidance on organization-wide levels of likelihood needing no further consideration.

- Assessment scale for assessing the likelihood of threat event initiation (adversarial threat events),

annotated by the organization, if necessary. (Table G-2)

- Assessment scale for assessing the likelihood of threat event occurrence (non-adversarial threat

events), annotated by the organization, if necessary. (Table G-3)

- Assessment scale for assessing the likelihood of threat events resulting in adverse impacts,

annotated by the organization, if necessary. (Table G-4)

- Assessment scale for assessing the overall likelihood of threat events being initiated or occurring and

resulting in adverse impacts, annotated by the organization, if necessary. (Table G-5)

From Tier 2: (Mission/business process level) Yes Yes Yes

                                                                                                              Via          Via

- Likelihood information and guidance specific to Tier 2 (e.g., likelihood information related to

                                                                                                              RAR         Peer

mission/business processes, EA segments, common infrastructure, support services, common Sharing

controls, and external dependencies).

From Tier 3: (Information system level) Yes Yes Yes

                                                                                                              Via         Via         Via

- Likelihood information and guidance specific to Tier 3 (e.g., likelihood information related to

                                                                                                              RAR         RAR        Peer

information systems, information technologies, information system components, applications, Sharing

networks, environments of operation).

- Historical data on successful and unsuccessful cyber attacks; attack detection rates.

- Security assessment reports (i.e., deficiencies in assessed controls identified as vulnerabilities).

- Results of monitoring activities (e.g., automated and nonautomated data feeds).

- Vulnerability assessments, Red Team reports, or other reports from analyses of information systems,

subsystems, information technology products, devices, networks, or applications.

- Contingency Plans, Disaster Recovery Plans, Incident Reports.

- Vendor/manufacturer vulnerability reports.

55

The term likelihood, as discussed in this guideline, is not likelihood in the strict sense of the term; rather, it is a

likelihood score. Risk assessors do not define a likelihood function in the statistical sense. Instead, risk assessors assign

a score (or likelihood assessment) based on available evidence, experience, and expert judgment. Combinations of

factors such as targeting, intent, and capability thus can be used to produce a score representing the likelihood of threat

initiation; combinations of factors such as capability and vulnerability severity can be used to produce a score

representing the likelihood of adverse impacts; and combinations of these scores can be used to produce an overall

likelihood score.

APPENDIX G PAGE G-1

Special Publication 800-30 Guide for Conducting Risk Assessments


       TABLE G-2: ASSESSMENT SCALE – LIKELIHOOD OF THREAT EVENT INITIATION (ADVERSARIAL)

Qualitative Semi-Quantitative Description

Values Values

Very High 96-100 10 Adversary is almost certain to initiate the threat event.

     High          80-95           8    Adversary is highly likely to initiate the threat event.

Moderate 21-79 5 Adversary is somewhat likely to initiate the treat event.

     Low           5-20            2    Adversary is unlikely to initiate the threat event.

Very Low 0-4 0 Adversary is highly unlikely to initiate the threat event.

TABLE G-3: ASSESSMENT SCALE – LIKELIHOOD OF THREAT EVENT OCCURRENCE (NON-ADVERSARIAL)

Qualitative Semi-Quantitative Description

Values Values

Very High 96-100 10 Error, accident, or act of nature is almost certain to occur; or occurs more than 100 times a year.

     High          80-95           8    Error, accident, or act of nature is highly likely to occur; or occurs between 10-100 times a year.
                                        Error, accident, or act of nature is somewhat likely to occur; or occurs between 1-10 times a

Moderate 21-79 5

                                        year.
                                        Error, accident, or act of nature is unlikely to occur; or occurs less than once a year, but more
     Low           5-20            2
                                        than once every 10 years.
                                        Error, accident, or act of nature is highly unlikely to occur; or occurs less than once every 10

Very Low 0-4 0

                                        years.

TABLE G-4: ASSESSMENT SCALE – LIKELIHOOD OF THREAT EVENT RESULTING IN ADVERSE IMPACTS

Qualitative Semi-Quantitative Description

Values Values

Very High 96-100 10 If the threat event is initiated or occurs, it is almost certain to have adverse impacts.

     High          80-95           8    If the threat event is initiated or occurs, it is highly likely to have adverse impacts.

Moderate 21-79 5 If the threat event is initiated or occurs, it is somewhat likely to have adverse impacts.

     Low           5-20            2    If the threat event is initiated or occurs, it is unlikely to have adverse impacts.

Very Low 0-4 0 If the threat event is initiated or occurs, it is highly unlikely to have adverse impacts.

                               TABLE G-5: ASSESSMENT SCALE – OVERALL LIKELIHOOD

Likelihood of

Threat Event Likelihood Threat Events Result in Adverse Impacts

Initiation or

Occurrence Very Low Low Moderate High Very High

    Very High                Low              Moderate                     High                      Very High                Very High
      High                   Low              Moderate                   Moderate                      High                   Very High
    Moderate                 Low                 Low                     Moderate                    Moderate                      High
      Low                  Very Low              Low                       Low                       Moderate                 Moderate
    Very Low               Very Low           Very Low                     Low                         Low                         Low

APPENDIX G PAGE G-2

Special Publication 800-30 Guide for Conducting Risk Assessments


APPENDIX H

IMPACT

EFFECTS OF THREAT EVENTS ON ORGANIZATIONS, INDIVIDUALS, AND THE NATION

T his appendix provides: (i) a description of useful inputs to the impact determination task;

        (ii) representative examples of adverse impacts to organizational operations and assets,
        individuals, other organizations, or the Nation; (iii) exemplary assessment scales for

assessing the impact of threat events and the range of effect of threat events; and (iv) a template

for summarizing and documenting the results of the impact determination Task 2-5. The

assessment scales in this appendix can be used as a starting point with appropriate tailoring to

adjust for any organization-specific conditions. Table H-4, an output from Task 2-5, provides

relevant inputs to the risk tables in Appendix I.

                                        TABLE H-1: INPUTS – DETERMINATION OF IMPACT
                                                                                                                     Provided To
                                             Description
                                                                                                            Tier 1     Tier 2      Tier 3

From Tier 1 (Organization level) No Yes Yes

                                                                                                                                     If not

- Impact information and guidance specific to Tier 1 (e.g., impact information related to organizational

                                                                                                                                   provided

governance, core missions/business functions, management and operational policies, procedures, by Tier 2

and structures, external mission/business relationships).

- Guidance on organization-wide levels of impact needing no further consideration.

- Identification of critical missions/business functions.

- Exemplary set of impacts, annotated by the organization, if necessary. (Table H-2)

- Assessment scale for assessing the impact of threat events, annotated by the organization, if

necessary. (Table H-3)

From Tier 2: (Mission/business process level) Yes Yes Yes

                                                                                                             Via          Via

- Impact information and guidance specific to Tier 2 (e.g., impact information related to

                                                                                                             RAR         Peer

mission/business processes, EA segments, common infrastructure, support services, common Sharing

controls, and external dependencies).

- Identification of high-value assets.

From Tier 3: (Information system level) Yes Yes Yes

                                                                                                             Via         Via         Via

- Impact information and guidance specific to Tier 3 (e.g., likelihood information affecting information

                                                                                                             RAR         RAR        Peer

systems, information technologies, information system components, applications, networks, Sharing

environments of operation).

- Historical data on successful and unsuccessful cyber attacks; attack detection rates.

- Security assessment reports (i.e., deficiencies in assessed controls identified as vulnerabilities).

- Results of continuous monitoring activities (e.g., automated and nonautomated data feeds).

- Vulnerability assessments, Red Team reports, or other reports from analyses of information systems,

subsystems, information technology products, devices, networks, or applications.

- Contingency Plans, Disaster Recovery Plans, Incident Reports.

APPENDIX H PAGE H-1

Special Publication 800-30 Guide for Conducting Risk Assessments


                                   TABLE H-2: EXAMPLES OF ADVERSE IMPACTS

Type of Impact Impact

HARM TO - Inability to perform current missions/business functions.

OPERATIONS - In a sufficiently timely manner.

                          - With sufficient confidence and/or correctness.
                          - Within planned resource constraints.
                        - Inability, or limited ability, to perform missions/business functions in the future.
                          - Inability to restore missions/business functions.
                          - In a sufficiently timely manner.
                          - With sufficient confidence and/or correctness.
                          - Within planned resource constraints.
                        - Harms (e.g., financial costs, sanctions) due to noncompliance.
                          - With applicable laws or regulations.
                          - With contractual requirements or other requirements in other binding agreements (e.g., liability).
                        - Direct financial costs.
                        - Relational harms.
                          - Damage to trust relationships.
                          - Damage to image or reputation (and hence future or potential trust relationships).

HARM TO ASSETS - Damage to or loss of physical facilities.

                        - Damage to or loss of information systems or networks.
                        - Damage to or loss of information technology or equipment.
                        - Damage to or loss of component parts or supplies.
                        - Damage to or of loss of information assets.
                        - Loss of intellectual property.

HARM TO INDIVIDUALS - Injury or loss of life.

                        - Physical or psychological mistreatment.
                        - Identity theft.
                        - Loss of Personally Identifiable Information.
                        - Damage to image or reputation.

HARM TO OTHER - Harms (e.g., financial costs, sanctions) due to noncompliance.

ORGANIZATIONS - With applicable laws or regulations.

                          - With contractual requirements or other requirements in other binding agreements.
                        - Direct financial costs.
                        - Relational harms.
                          - Damage to trust relationships.
                          - Damage to reputation (and hence future or potential trust relationships).

HARM TO THE NATION - Damage to or incapacitation of a critical infrastructure sector.

                        - Loss of government continuity of operations.
                        - Relational harms.
                          - Damage to trust relationships with other governments or with nongovernmental entities.
                          - Damage to national reputation (and hence future or potential trust relationships).
                        - Damage to current or future ability to achieve national objectives.
                          - Harm to national security.

APPENDIX H PAGE H-2

Special Publication 800-30 Guide for Conducting Risk Assessments


                            TABLE H-3: ASSESSMENT SCALE – IMPACT OF THREAT EVENTS

Qualitative Semi-Quantitative Description

Values Values

                                       The threat event could be expected to have multiple severe or catastrophic adverse effects on

Very High 96-100 10

                                       organizational operations, organizational assets, individuals, other organizations, or the Nation.
                                       The threat event could be expected to have a severe or catastrophic adverse effect on
                                       organizational operations, organizational assets, individuals, other organizations, or the Nation. A
                                       severe or catastrophic adverse effect means that, for example, the threat event might: (i) cause a
     High           80-95        8     severe degradation in or loss of mission capability to an extent and duration that the organization is
                                       not able to perform one or more of its primary functions; (ii) result in major damage to
                                       organizational assets; (iii) result in major financial loss; or (iv) result in severe or catastrophic harm
                                       to individuals involving loss of life or serious life-threatening injuries.
                                       The threat event could be expected to have a serious adverse effect on organizational operations,
                                       organizational assets, individuals other organizations, or the Nation. A serious adverse effect
                                       means that, for example, the threat event might: (i) cause a significant degradation in mission

Moderate 21-79 5 capability to an extent and duration that the organization is able to perform its primary functions,

                                       but the effectiveness of the functions is significantly reduced; (ii) result in significant damage to
                                       organizational assets; (iii) result in significant financial loss; or (iv) result in significant harm to
                                       individuals that does not involve loss of life or serious life-threatening injuries.
                                       The threat event could be expected to have a limited adverse effect on organizational operations,
                                       organizational assets, individuals other organizations, or the Nation. A limited adverse effect
                                       means that, for example, the threat event might: (i) cause a degradation in mission capability to an
     Low            5-20         2
                                       extent and duration that the organization is able to perform its primary functions, but the
                                       effectiveness of the functions is noticeably reduced; (ii) result in minor damage to organizational
                                       assets; (iii) result in minor financial loss; or (iv) result in minor harm to individuals.
                                       The threat event could be expected to have a negligible adverse effect on organizational

Very Low 0-4 0

                                       operations, organizational assets, individuals other organizations, or the Nation.
                            TABLE H-4: TEMPLATE – IDENTIFICATION OF ADVERSE IMPACTS

Type of Impact Impact Maximum Impact

                                                     Affected Asset
    Table H-2                                           Table H-2                                                          Table H-3
        or                                                  or                                                                 or

Organization- Organization-defined Organization-defined

     defined

APPENDIX H PAGE H-3

Special Publication 800-30 Guide for Conducting Risk Assessments


APPENDIX I

RISK DETERMINATION

ASSESSING RISK TO ORGANIZATIONS, INDIVIDUALS, AND THE NATION

T his appendix provides: (i) a description of potentially useful inputs to the risk

        determination task including considerations for uncertainty of determinations; (ii)
        exemplary assessment scales for assessing the levels of risk; (iii) tables for describing

content (i.e., data inputs) for adversarial and non-adversarial risk determinations; and (iv)

templates for summarizing and documenting the results of the risk determination Task 2-6. The

assessment scales in this appendix can be used as a starting point with appropriate tailoring to

adjust for any organization-specific conditions. Table I-5 (adversarial risk) and Table I-7 (non-

adversarial risk) are outputs from Task 2-6.

                                                         TABLE I-1: INPUTS – RISK
                                                                                                                          Provided To
                                             Description
                                                                                                                 Tier 1     Tier 2          Tier 3

From Tier 1 (Organization level) No Yes Yes

                                                                                                                                              If not

- Sources of risk and uncertainty information identified for organization-wide use (e.g., specific

                                                                                                                                            provided

information that may be useful in determining likelihoods such as adversary capabilities, intent, and by Tier 2

targeting objectives).

- Guidance on organization-wide levels of risk (including uncertainty) needing no further consideration.

- Criteria for uncertainty determinations.

- List of high-risk events from previous risk assessments.

- Assessment scale for assessing the level of risk as a combination of likelihood and impact, annotated

by the organization, if necessary. (Table I-2)

- Assessment scale for assessing level of risk, annotated by the organization, if necessary. (Table I-3)

From Tier 2: (Mission/business process level) Yes Yes Yes

                                                                                                                  Via          Via

- Risk-related information and guidance specific to Tier 2 (e.g., risk and uncertainty information related

                                                                                                                  RAR         Peer

to mission/business processes, EA segments, common infrastructure, support services, common Sharing

controls, and external dependencies).

From Tier 3: (Information system level) Yes Yes Yes

                                                                                                                  Via         Via                Via

- Risk-related information and guidance specific to Tier 3 (e.g., likelihood information affecting

                                                                                                                  RAR         RAR               Peer

information systems, information technologies, information system components, applications, Sharing

networks, environments of operation).

        TABLE I-2: ASSESSMENT SCALE – LEVEL OF RISK (COMBINATION OF LIKELIHOOD AND IMPACT)
    Likelihood                                                                Level of Impact

(Threat Event Occurs

    and Results in

Adverse Impact)

                                Very Low                    Low                    Moderate                    High                 Very High
      Very High                 Very Low                    Low                    Moderate                     High                Very High
         High                   Very Low                    Low                    Moderate                     High                Very High
      Moderate                  Very Low                    Low                    Moderate                   Moderate                   High
         Low                    Very Low                    Low                       Low                       Low                    Moderate
      Very Low                  Very Low                  Very Low                 Very Low                     Low                      Low

APPENDIX I PAGE I-1

Special Publication 800-30 Guide for Conducting Risk Assessments


                                 TABLE I-3: ASSESSMENT SCALE – LEVEL OF RISK

Qualitative Semi-Quantitative Description

Values Values

                                     Very high risk means that a threat event could be expected to have multiple severe or

Very High 96-100 10 catastrophic adverse effects on organizational operations, organizational assets, individuals,

                                     other organizations, or the Nation.
                                     High risk means that a threat event could be expected to have a severe or catastrophic adverse
     High        80-95       8       effect on organizational operations, organizational assets, individuals, other organizations, or the
                                     Nation.
                                     Moderate risk means that a threat event could be expected to have a serious adverse effect on

Moderate 21-79 5

                                     organizational operations, organizational assets, individuals, other organizations, or the Nation.
                                     Low risk means that a threat event could be expected to have a limited adverse effect on
     Low          5-20       2
                                     organizational operations, organizational assets, individuals, other organizations, or the Nation.
                                     Very low risk means that a threat event could be expected to have a negligible adverse effect on

Very Low 0-4 0

                                     organizational operations, organizational assets, individuals, other organizations, or the Nation.

APPENDIX I PAGE I-2

Special Publication 800-30 Guide for Conducting Risk Assessments


                        TABLE I-4: COLUMN DESCRIPTIONS FOR ADVERSARIAL RISK TABLE

Column Heading Content

        1      Threat Event                                   Identify threat event. (Task 2-2; Table E-1; Table E-2; Table E-5; Table I-5.)
        2      Threat Sources                                 Identify threat sources that could initiate the threat event. (Task 2-1; Table D-1; Table D-2;
                                                              Table D-7; Table I-5.)
        3      Capability                                     Assess threat source capability. (Task 2-1; Table D-3; Table D-7; Table I-5.)
        4      Intent                                         Assess threat source intent. (Task 2-1; Table D-4; Table D-7; Table I-5.)
        5      Targeting                                      Assess threat source targeting. (Task 2-1; Table D-5; Table D-7; Table I-5.)
        6      Relevance                                      Determine relevance of threat event. (Task 2-2; Table E-1; Table E-4; Table E-5; Table I-5.)
                                                              If the relevance of the threat event does not meet the organization’s criteria for further
                                                              consideration, do not complete the remaining columns.
        7      Likelihood of Attack Initiation                Determine likelihood that one or more of the threat sources initiates the threat event, taking into
                                                              consideration capability, intent, and targeting. (Task 2-4; Table G-1; Table G-2; Table I-5.)
        8      Vulnerabilities and                            Identify vulnerabilities which could be exploited by threat sources initiating the threat event and
               Predisposing Conditions                        the predisposing conditions which could increase the likelihood of adverse impacts. (Task 2-5;
                                                              Table F-1; Table F-3; Table F-4; Table F-6; Table I-5.)
        9      Severity                                       Assess severity of vulnerabilities and pervasiveness of predisposing conditions. (Task 2-5;
               Pervasiveness                                  Table F-1; Table F-2; Table F-5; Table F-6; Table I-5.)
     10        Likelihood Initiated Attack                    Determine the likelihood that the threat event, once initiated, will result in adverse impact,
               Succeeds                                       taking into consideration threat source capability, vulnerabilities, and predisposing conditions.
                                                              (Task 2-4; Table G-1; Table G-4; Table I-5.)
     11        Overall Likelihood                             Determine the likelihood that the threat event will be initiated and result in adverse impact (i.e.,
                                                              combination of likelihood of attack initiation and likelihood that initiated attack succeeds). (Task
                                                              2-4; Table G-1; Table G-5; Table I-5.)
     12        Level of Impact                                Determine the adverse impact (i.e., potential harm to organizational operations, organizational
                                                              assets, individuals, other organizations, or the Nation) from the threat event. (Task 2-5; Table
                                                              H-1, Table H-2; Table H-3; Table H-4; Table I-5.)
     13        Risk                                           Determine the level of risk as a combination of likelihood and impact. (Task 2-6; Table I-1;
                                                              Table I-2; Table I-3; Table I-5.)
                                                  TABLE I-5: TEMPLATE – ADVERSARIAL RISK
    1          2               3          4         5           6               7                   8                 9              10                 11                   12       13
                             Threat Source
                             Characteristics
                                                                                                                                Likelihood Initiated
                                                                                                                                                       Overall Likelihood
                                                                           Likelihood of                         Severity and
                                                                                              Vulnerabilities
                                                              Relevance
                                                                                                                                                                             Level

Threat Threat and

                                                                                                                                                                              of      Risk
                                                                                                                                 Attack Succeeds
                                                                          Attack Initiation                     Pervasiveness
                            Capability

Event Sources Predisposing

                                                  Targeting
                                                                                                                                                                            Impact
                                         Intent                                                Conditions

APPENDIX I PAGE I-3

Special Publication 800-30 Guide for Conducting Risk Assessments


                     TABLE I-6: COLUMN DESCRIPTIONS FOR NON-ADVERSARIAL RISK TABLE

Column Heading Content

     1        Threat Event                        Identify threat event. (Task 2-2; Table E-1; Table E-3; Table E-5; Table I-7.)
     2        Threat Sources                      Identify threat sources that could initiate the threat event. (Task 2-1; Table D-1; Table D-2;
                                                  Table D-8; Table I-7.)
     3        Range of Effects                    Identify the range of effects from the threat source. (Task 2-1; Table D-1; Table D-6; Table I-7.)
     4        Relevance                           Determine relevance of threat event. (Task 2-2; Table E-1; Table E-4; Table E-5; Table I-7.)
                                                  If the relevance of the threat event does not meet the organization’s criteria for further
                                                  consideration, do not complete the remaining columns.
     5        Likelihood of Threat Event          Determine the likelihood that the threat event will occur. (Task 2-4; Table G-1; Table G-3; Table
              Occurring                           I-7.)
     6        Vulnerabilities and                 Identify vulnerabilities which could be exploited by threat sources initiating the threat event and
              Predisposing Conditions             the predisposing conditions which could increase the likelihood of adverse impacts. (Task 2-5;
                                                  Table F-1; Table F-3; Table F-4; Table F-6; Table I-7.)
     7        Severity                            Assess severity of vulnerabilities and pervasiveness of predisposing conditions. (Task 2-5; Table
              Pervasiveness                       F-1; Table F-2; Table F-5; Table F-6; Table I-5.)
     8        Likelihood Threat Event             Determine the likelihood that the threat event, once initiated, will result in adverse impact, taking
              Results in Adverse Impact           into consideration vulnerabilities and predisposing conditions. (Task 2-4; Table G-1; Table G-4;
                                                  Table I-7.)
     9        Overall Likelihood                  Determine the likelihood that the threat event will occur and result in adverse impacts (i.e.,
                                                  combination of likelihood of threat occurring and likelihood that the threat event results in
                                                  adverse impact). (Task 2-4; Table G-1; Table G-5; Table I-7.)
     10       Level of Impact                     Determine the adverse impact (i.e., potential harm to organizational operations, organizational
                                                  assets, individuals, other organizations, or the Nation) from the threat event. (Task 2-5; Table H-
                                                  1, Table H-2; Table H-3; Table H-4; Table I-7.)
     11       Risk                                Determine the level of risk as a combination of likelihood and impact. (Task 2-6; Table I-1; Table
                                                  I-2; Table I-3; Table I-7.)
                                     TABLE I-7: TEMPLATE – NON-ADVERSARIAL RISK
    1           2               3        4             5                  6                 7                 8                  9                10      11
                                                                                                        Likelihood Event
                                                                                                                            Overall Likelihood
                                                   Likelihood of                        Severity and
                                                                    Vulnerabilities
                                      Relevance
                          Range                                                                                                                   Level
                                                                                                       Results in Adverse

Threat Threat and

                             of                                                                                                                    of     Risk
                                                  Event Occurring                      Pervasiveness

Event Sources Predisposing

                          Effects                                                                                                                Impact
                                                                                                             Impact
                                                                     Conditions

APPENDIX I PAGE I-4

Special Publication 800-30 Guide for Conducting Risk Assessments


APPENDIX J

INFORMING RISK RESPONSE

APPROACHES TO REFINING RISK ASSESSMENT RESULTS

A

          risk assessment may identify a number of risks that have similar scores (e.g., 78, 82, 83)
          or levels (e.g., moderate, high). When too many risks are clustered at or about the same
          value, organizations need a method to refine the presentation of risk assessment results,

prioritizing within sets of risks with similar values, to better inform the risk response component

of the risk management process. 56 Such a method should be associated with the mission/business

requirements of the organization, consistent with the organizational risk tolerance, and maximize

the use of available resources. Prioritization is a key component of risk-based protection and

becomes necessary when requirements cannot be fully satisfied or when resources do not allow

all risks to be mitigated within a reasonable time frame. To facilitate informed risk response

decisions by senior leaders/executives (e.g., why certain risks were or were not mitigated), the

risk assessment results are annotated to enable those decision makers to know or obtain the

answers to the following questions about each risk in a set with similar scores:

Time Frame

In the event the identified risk materialized—

• How high would the immediate impact be to organizational operations (including mission,

     functions, image, or reputation), organizational assets, individuals, other organizations, or the
     Nation?

• How high would the future impact be to organizational operations (including mission,

     functions, image, or reputation), organizational assets, individuals, other organizations, or the
     Nation?

The answers to the above questions, together with the risk tolerance of the organization, provide

the basis for a risk prioritization that is based on current and future organizational needs. When

weighing immediate impacts versus future impacts, senior leaders must decide whether a critical

mission/business need today warrants jeopardizing the future capabilities of the organization.

Mission/business owners and mission/business subject matter experts can be consulted to obtain

the most complete and up-to-date information on mission/business impacts. Other subject matter

experts or stakeholder representatives can be consulted to obtain information on immediate versus

future impacts (e.g., consulting the Privacy Office for impacts to individuals).

Total Cumulative Impact

• What is the expected impact from a single occurrence of the threat?

• If the risk can materialize more than once, what is the overall expected impact (i.e.,

     cumulative loss) for the time period of concern?

Note that one aspect of the total impact to organizations is the cost of recovery from a loss of

confidentiality, integrity, or availability.

56

The risk executive (function) provides policy-level guidance on organizational risk tolerance and other factors that

inform and guide the risk-based decisions of authorizing officials. This guidance can also influence the prioritization of

risk responses including for example, mitigation activities.

APPENDIX J PAGE J-1

Special Publication 800-30 Guide for Conducting Risk Assessments


Synergies Among Risks

If a risk materializes that is closely related to multiple risks, it is likely that a cluster of risks will

materialize at or near the same time. Managing the adverse impact from one risk materializing

may be possible; managing multiple risks of high impact that materialize at the same time may

challenge the capacity of the organization and therefore needs to be managed much more closely.

The following questions address relationships among risks.

Will the materialization of a particular risk result in:

• A high likelihood or virtual certainty of other identified risks materializing?

• A high likelihood or virtual certainty of other identified risks not materializing?

• No particular effect on other identified risks materializing?

If a risk is highly coupled to other risks or seen as likely to lead to other risks materializing

(whether the risk is the cause or materializes concurrently), the risk should be given higher

priority than a risk that has no particular effect on other risks. If a risk materializing actually

decreases the likelihood of other risks materializing, then further analysis is warranted to

determine which risks become a lower priority to mitigate.

In conclusion, organizations can benefit significantly by refining risk assessment results in

preparation for the risk response step in the risk management process. During the risk response

step, which is described in NIST Special Publication 800-39, organizations: (i) analyze different

courses of action; (ii) conduct cost-benefit analyses; (iii) address scalability issues for large-scale

implementations; (iv) examine the interactions/dependencies among risk mitigation approaches

(e.g., dependencies among security controls); and (v) assess other factors affecting organizational

missions/business functions. In addition, organizations address cost, schedule, and performance

issues associated with information systems and information technology infrastructure supporting

organizational missions/business functions.

                                             CAUTIONARY NOTE
    Organizations are cautioned that risk assessments are often not precise instruments of measurement
    and reflect the limitations of the specific assessment methodologies, tools, and techniques employed—
    as well as the subjectivity, quality, and trustworthiness of the data used. Risk determinations may be
    very coarse due to the assessment approach selected, the uncertainty in the likelihood of occurrence
    and impact values, and the potential mischaracterization of threats. Risks that are on the borderline
    between bins using the organization-defined binning scales, must ultimately be assigned to one bin.
    This determination could have a significant effect on the risk prioritization process. Thus, organizations
    should incorporate as much information as practical on particular risks during the prioritization process
    to ensure that the values for risks are appropriately determined (e.g., very low, low, moderate, high, very
    high).

APPENDIX J PAGE J-2

Special Publication 800-30 Guide for Conducting Risk Assessments


APPENDIX K

RISK ASSESSMENT REPORTS

ESSENTIAL ELEMENTS OF INFORMATION

T his appendix provides the essential elements of information that organizations can use to

        communicate the results of risk assessments. 57 Risk assessment results provide decision
        makers with an understanding of the information security risk to organizational operations

and assets, individuals, other organizations, or the Nation that derive from the operation and use

of organizational information systems and the environments in which those systems operate. The

essential elements of information in a risk assessment can be described in three sections of the

risk assessment report (or whatever vehicle is chosen by organizations to convey the results of the

assessment): (i) an executive summary; (ii) the main body containing detailed risk assessment

results; and (iii) supporting appendices.

Executive Summary

     •   List the date of the risk assessment.
     •   Summarize the purpose of the risk assessment.
     •   Describe the scope of the risk assessment.
         -    For Tier 1 and Tier 2 risk assessments, identify: organizational governance structures
              or processes associated with the assessment (e.g., risk executive [function], budget
              process, acquisition process, systems engineering process, enterprise architecture,
              information security architecture, organizational missions/business functions,
              mission/business processes, information systems supporting the mission/business
              processes).
         -    For Tier 3 risk assessments, identify: the information system name and location(s),
              security categorization, and information system (i.e., authorization) boundary.
     •   State whether this is an initial or subsequent risk assessment. If a subsequent risk
         assessment, state the circumstances that prompted the update and include a reference to
         the previous Risk Assessment Report.
     •   Describe the overall level of risk (e.g., Very Low, Low, Moderate, High, or Very High).
     •   List the number of risks identified for each level of risk (e.g., Very Low, Low, Moderate,
         High, or Very High).

Body of the Report

     •   Describe the purpose of the risk assessment, including questions to be answered by the
         assessment. For example:

57

The essential elements of information described in this appendix are informative and exemplary only and are not

intended to require or promote a specific template for documenting risk assessment results. Organizations have

maximum flexibility in determining the type and the level of detail of information included in organizational risk

assessments and the associated reports. For example, Tier 1 and Tier 2 risk assessment results may be conveyed via an

executive briefing or dashboard, whereas Tier 3 risk assessment results may be conveyed via a risk assessment report

(formal or informal depending on organizational preference). The essential elements of information for communicating

risk assessment results can be modified accordingly to meet the needs of organizations conducting the assessments.

APPENDIX K PAGE K-1

Special Publication 800-30 Guide for Conducting Risk Assessments


         -    How the use of a specific information technology would potentially change the risk
              to organizational missions/business functions if employed in information systems
              supporting those missions/business functions; or
         -    How the risk assessment results are to be used in the context of the RMF (e.g., an
              initial risk assessment to be used in tailoring security control baselines and/or to
              guide and inform other decisions and serve as a starting point for subsequent risk
              assessments; subsequent risk assessment to incorporate results of security control
              assessments and inform authorization decisions; subsequent risk assessment to
              support the analysis of alternative courses of action for risk responses; subsequent
              risk assessment based on risk monitoring to identify new threats or vulnerabilities;
              subsequent risk assessments to incorporate knowledge gained from incidents or
              attacks).
    •    Identify assumptions and constraints.
    •    Describe risk tolerance inputs to the risk assessment (including the range of consequences
         to be considered).
    •    Identify and describe the risk model and analytic approach; provide a reference or include
         as an appendix, identifying risk factors, value scales, and algorithms for combining
         values.
    •    Provide a rationale for any risk-related decisions during the risk assessment process.
    •    Describe the uncertainties within the risk assessment process and how those uncertainties
         influence decisions.
    •    If the risk assessment includes organizational missions/business functions, describe the
         missions/functions (e.g., mission/business processes supporting the missions/functions,
         interconnections and dependencies among related missions/business functions, and
         information technology that supports the missions/business functions).
    •    If the risk assessment includes organizational information systems, describe the systems
         (e.g., missions/business functions the system is supporting, information flows to/from the
         systems, and dependencies on other systems, shared services, or common infrastructures).
    •    Summarize risk assessment results (e.g., using tables or graphs), in a form that enables
         decision makers to quickly understand the risk (e.g., number of threat events for different
         combinations of likelihood and impact, the relative proportion of threat events at different
         risk levels).
    •    Identify the time frame for which the risk assessment is valid (i.e., time frame for which
         the assessment is intended to support decisions).
    •    List the risks due to adversarial threats (see Table F-1).
    •    List the risks due to non-adversarial threats (see Table F-2).

Appendices

    •    List references and sources of information.
    •    List the team or individuals conducting the risk assessment including contact information.
    •    List risk assessment details and any supporting evidence (e.g., Tables D-7, D-8, E-5, F-3,
         F-6, H-4), as needed to understand and enable reuse of results (e.g., for reciprocity, for
         subsequent risk assessments, to serve as input to Tier 1 and Tier 2 risk assessments).

APPENDIX K PAGE K-2

Special Publication 800-30 Guide for Conducting Risk Assessments


APPENDIX L

SUMMARY OF TASKS

RISK ASSESSMENT TASKS AND ASSOCIATED RISK TABLES

                             TABLE L-1: SUMMARY OF RISK ASSESSMENT TASKS
               TASK                                             TASK DESCRIPTION

Step 1: Prepare for Risk Assessment

TASK 1-1 Identify the purpose of the risk assessment in terms of the information that the

IDENTIFY PURPOSE assessment is intended to produce and the decisions the assessment is intended to

                                 support.

Section 3.1

TASK 1-2 Identify the scope of the risk assessment in terms of organizational applicability, time

IDENTIFY SCOPE frame supported, and architectural/technology considerations.

Section 3.1

TASK 1-3 Identify the specific assumptions and constraints under which the risk assessment is

IDENTIFY ASSUMPTIONS conducted.

AND CONSTRAINTS

Section 3.1

TASK 1-4 Identify the sources of descriptive, threat, vulnerability, and impact information to be

IDENTIFY INFORMATION used in the risk assessment.

SOURCES

Section 3.1

TASK 1-5 Identify the risk model and analytic approach to be used in the risk assessment.

IDENTIFY RISK MODEL AND

ANALYTIC APPROACH

Section 3.1

Step 2: Conduct Risk Assessment

TASK 2-1 Identify and characterize threat sources of concern, including capability, intent, and

IDENTIFY THREAT SOURCES targeting characteristics for adversarial threats and range of effects for non-adversarial

                                 threats.

Section 3.2, Appendix D

TASK 2-2 Identify potential threat events, relevance of the events, and the threat sources that could

IDENTIFY THREAT EVENTS initiate the events.

Section 3.2, Appendix E

TASK 2-3 Identify vulnerabilities and predisposing conditions that affect the likelihood that threat

IDENTIFY VULNERABILITIES AND events of concern result in adverse impacts.

PREDISPOSING CONDITIONS

Section 3.2, Appendix F

APPENDIX L PAGE L-1

Special Publication 800-30 Guide for Conducting Risk Assessments


               TASK                                           TASK DESCRIPTION

TASK 2-4 Determine the likelihood that threat events of concern result in adverse impacts,

DETERMINE LIKELIHOOD considering: (i) the characteristics of the threat sources that could initiate the events; (ii)

                              the vulnerabilities/predisposing conditions identified; and (iii) the organizational

Section 3.2, Appendix G

                              susceptibility reflecting the safeguards/countermeasures planned or implemented to
                              impede such events.

TASK 2-5 Determine the adverse impacts from threat events of concern, considering: (i) the

DETERMINE IMPACT characteristics of the threat sources that could initiate the events; (ii) the

                              vulnerabilities/predisposing conditions identified; and (iii) the organizational susceptibility

Section 3.2, Appendix H

                              reflecting the safeguards/countermeasures planned or implemented to impede such
                              events.

TASK 2-6 Determine the risk to the organization from threat events of concern considering: (i) the

DETERMINE RISK impact that would result from the events; and (ii) the likelihood of the events occurring.

Section 3.2, Appendix I

Step 3: Communicate and Share Risk Assessment Results

TASK 3-1 Communicate risk assessment results to organizational decision makers to support risk

COMMUNICATE RISK responses.

ASSESSMENT RESULTS

Section 3.3, Appendix K

TASK 3-2 Share risk-related information produced during the risk assessment with appropriate

SHARE RISK-RELATED organizational personnel.

INFORMATION

Section 3.3

Step 4: Maintain Risk Assessment

TASK 4-1 Conduct ongoing monitoring of the risk factors that contribute to changes in risk to

MONITOR RISK FACTORS organizational operations and assets, individuals, other organizations, or the Nation.

Section 3.4

TASK 4-2 Update existing risk assessment using the results from ongoing monitoring of risk

UPDATE RISK ASSESSMENT factors.

Section 3.4

APPENDIX L PAGE L-2

Attachments