NIST SP 800-53r5 — CP-06(03) Accessibility
source: false
type: canonical-control-reference
standard: NIST SP 800-53r5
assessment_standard: NIST SP 800-53Ar5
baseline_standard: NIST SP 800-53B
control_id: "CP-06(03)"
family_id: "CP"
family: "Contingency Planning"
title: "Accessibility"
status: active
updated: 2026-09-10
authoritative_sources:
- "NIST SP 800-53r5 verified transcription"
- "NIST SP 800-53Ar5 verified transcription"
- "NIST SP 800-53B verified transcription"
baseline_membership:
low: false
moderate: true
high: true
privacy: false
related_controls:
- "RA-03"
CP-06(03) Accessibility
Canonical combined reference
Control text and discussion come from NIST SP 800-53r5; assessment procedures come from NIST SP 800-53Ar5; baseline membership comes from NIST SP 800-53B.
NIST SP 800-53r5 — Control
Identify potential accessibility problems to the alternate storage site in the event of an area-wide disruption or disaster and outline explicit mitigation actions.
Discussion
Area-wide disruptions refer to those types of disruptions that are broad in geographic scope with such determinations made by organizations based on organizational assessments of risk. Explicit mitigation actions include duplicating backup information at other alternate storage sites if access problems occur at originally designated alternate sites or planning for physical access to retrieve backup information if electronic accessibility to the alternate site is disrupted.
Related Controls
Supporting Publications
- None specified.
NIST SP 800-53Ar5 — Assessment Procedure
Assessment Objective
Determine if:
-
CP-06(03)[01]— potential accessibility problems to the alternate storage site in the event of an area-wide disruption or disaster are identified; -
CP-06(03)[02]— explicit mitigation actions to address identified accessibility problems are outlined.
Potential Assessment Methods and Objects
Examine
Select from:
- Contingency planning policy.
- procedures addressing alternate storage sites.
- contingency plan.
- alternate storage site.
- list of potential accessibility problems to alternate storage site.
- mitigation actions for accessibility problems to alternate storage site.
- organizational risk assessments.
- system security plan.
- other relevant documents or records.
Interview
Select from:
- Organizational personnel with contingency plan alternate storage site responsibilities.
- organizational personnel with system recovery responsibilities.
- organizational personnel with information security responsibilities.
References
Source Assessment Procedure — NIST SP 800-53Ar5
- NIST SP 800-53Ar5 CP-06(03)
NIST SP 800-53B — Baseline Membership
| Baseline | Membership |
|---|---|
| Low | Not included |
| Moderate | Included |
| High | Included |
| Privacy | Not included |