NIST SP 800-53r5 — CM-03(02) Testing, Validation, and Documentation of Changes
source: false
type: canonical-control-reference
standard: NIST SP 800-53r5
assessment_standard: NIST SP 800-53Ar5
baseline_standard: NIST SP 800-53B
control_id: "CM-03(02)"
family_id: "CM"
family: "Configuration Management"
title: "Testing, Validation, and Documentation of Changes"
status: active
updated: 2026-09-10
authoritative_sources:
- "NIST SP 800-53r5 verified transcription"
- "NIST SP 800-53Ar5 verified transcription"
- "NIST SP 800-53B verified transcription"
baseline_membership:
low: false
moderate: true
high: true
privacy: false
CM-03(02) Testing, Validation, and Documentation of Changes
Canonical combined reference
Control text and discussion come from NIST SP 800-53r5; assessment procedures come from NIST SP 800-53Ar5; baseline membership comes from NIST SP 800-53B.
NIST SP 800-53r5 — Control
Test, validate, and document changes to the system before finalizing the implementation of the changes.
Discussion
Changes to systems include modifications to hardware, software, or firmware components and configuration settings defined in NIST SP 800-53r5 CM-06. Organizations ensure that testing does not interfere with system operations that support organizational mission and business functions. Individuals or groups conducting tests understand security and privacy policies and procedures, system security and privacy policies and procedures, and the health, safety, and environmental risks associated with specific facilities or processes. Operational systems may need to be taken offline, or replicated to the extent feasible, before testing can be conducted. If systems must be taken offline for testing, the tests are scheduled to occur during planned system outages whenever possible. If the testing cannot be conducted on operational systems, organizations employ compensating controls.
Related Controls
- None specified.
Supporting Publications
- None specified.
NIST SP 800-53Ar5 — Assessment Procedure
Assessment Objective
Determine if:
-
CM-03(02)[01]— changes to the system are tested before finalizing the implementation of the changes; -
CM-03(02)[02]— changes to the system are validated before finalizing the implementation of the changes; -
CM-03(02)[03]— changes to the system are documented before finalizing the implementation of the changes.
Potential Assessment Methods and Objects
Examine
Select from:
- Configuration management policy.
- configuration management plan.
- procedures addressing system configuration change control.
- system design documentation.
- system architecture and configuration documentation.
- system configuration settings and associated documentation.
- test records.
- validation records.
- change control records.
- system audit records.
- system security plan.
- other relevant documents or records.
Interview
Select from:
- Organizational personnel with configuration change control responsibilities.
- organizational personnel with information security responsibilities.
- system/network administrators.
- system developers.
- members of change control board or similar.
Test
Select from:
- Organizational processes for configuration change control.
- mechanisms supporting and/or implementing, testing, validating, and documenting system changes.
References
Source Assessment Procedure — NIST SP 800-53Ar5
- NIST SP 800-53Ar5 CM-03(02)
NIST SP 800-53B — Baseline Membership
| Baseline | Membership |
|---|---|
| Low | Not included |
| Moderate | Included |
| High | Included |
| Privacy | Not included |