NERC CIP — CIP-009-7.1 R2 Recovery Plan Implementation and Testing
source: false
type: "canonical-control-reference"
standard: "NERC Critical Infrastructure Protection"
document_version: "CIP-009-7.1"
criterion_id: "CIP-009-7.1 R2"
family_id: "CIP-009-7.1"
family: "Cyber Security — Recovery Plans for BES Cyber Systems"
title: "Recovery Plan Implementation and Testing"
status: "approved-future-enforcement"
assessment_criterion: true
normative_text_included: true
updated: "2026-09-13"
source_pdf: "Resources/CMMC Brain 2.1/Sources/NERC CIP/CIP-009-7.1.pdf"
source_pages: [6, 7, 11, 12]
requirement_pages: [6, 7]
us_effective_date: "07/01/2028"
mapping_status: "not-transferred-from-2024-SCF-set"
CIP-009-7.1 R2 Recovery Plan Implementation and Testing
Version and enforcement
U.S. status checked 2026-09-13: Subject to Future Enforcement. Standard effective date: 07/01/2028. Jurisdiction-specific applicability and transitional obligations must be checked against the implementation plan.
Requirement
Each Responsible Entity shall implement its documented recovery plan(s) to collectively include each of the applicable Requirement Parts in CIP-009-7.1 Table R2 – Recovery Plan Implementation and Testing. [Violation Risk Factor: Lower] [Time Horizon: Operations Planning and Real-time Operations.]
Assessment Measure
Evidence must include, but is not limited to, documentation that collectively demonstrates implementation of each of the applicable Requirement Parts in CIP-009-7.1 Table R2 – Recovery Plan Implementation and Testing.
Requirement Parts
Part 2.1
Applicable Systems
High impact BCS and their associated:
-
1.EACMS; and
-
2.PACS
Medium impact BCS at Control Centers and their associated:
-
1.EACMS; and
-
2.PACS
Requirement
Test each of the recovery plans referenced in Requirement R1 at least once every 15 calendar months:
- By recovering from an actual incident;
- With a paper drill or tabletop exercise; or
- With an operational exercise.
Measures
Examples of evidence may include, but are not limited to, dated evidence of a test (by recovering from an actual incident, with a paper drill or tabletop exercise, or with an operational exercise) of the recovery plan at least once every 15 calendar months. For the paper drill or full operational exercise, evidence may include meeting notices, minutes, or other records of exercise findings.
Part 2.2
Applicable Systems
High impact BCS and their associated:
-
1.EACMS; and
-
2.PACS
Medium impact BCS at Control Centers and their associated:
-
1.EACMS; and
-
2.PACS
Requirement
Test a representative sample of information used to recover Applicable System functionality at least once every 15 calendar months to ensure that the information is useable and is compatible with current configurations.
An actual recovery that incorporates the information used to recover Applicable System functionality substitutes for this test.
Measures
Examples of evidence may include, but are not limited to, operational logs or test results with criteria for testing the usability (e.g., sample tape load, browsing tape contents) and compatibility with current system configurations (e.g., manual, or automated comparison checkpoints between backup media contents and current configuration).
Part 2.3
Applicable Systems
High impact BCS
Requirement
Test each of the recovery plans referenced in Requirement R1 at least once every 36 calendar months through an operational exercise of the recovery plans in an environment representative of the production environment. An actual recovery response may substitute for an operational exercise.
Measures
Examples of evidence may include, but are not limited to, dated documentation of:
- An operational exercise at least once every 36 calendar months between exercises, that demonstrates recovery in a representative environment; or
- An actual recovery response that occurred within the 36 calendar month timeframe that exercised the recovery plans.
Violation Severity Levels
Lower
The Responsible Entity did not test the recovery plan(s) according to Part 2.1 within 15 calendar months, not exceeding 16 calendar months between tests of the plan(s). (Part 2.1)
OR
The Responsible Entity did not test a representative sample of the information used in the recovery of Applicable System functionality according to Part 2.2 within 15 calendar months, not exceeding 16 calendar months between tests. (Part 2.2)
OR
The Responsible Entity did not test the recovery plan according to Part 2.3 within 36 calendar months, not exceeding 37 calendar months between tests. (Part 2.3)
Moderate
The Responsible Entity did not test the recovery plan(s) within 16 calendar months, not exceeding 17 calendar months between tests of the plan. (Part 2.1)
OR
The Responsible Entity did not test a representative sample of the information used in the recovery of Applicable System functionality according to Part 2.2 within 16 calendar months, not exceeding 17 calendar months between tests. (Part 2.2) OR
The Responsible Entity did not test the recovery plan according to Part 2.3 within 37 calendar months, not exceeding 38 calendar months between tests. (Part 2.3)
High
The Responsible Entity did not test the recovery plan(s) according to Part 2.1 within 17 calendar months, not exceeding 18 calendar months between tests of the plan. (Part 2.1)
OR
The Responsible Entity did not test a representative sample of the information used in the recovery of Applicable System functionality according to Part 2.2 within 17 calendar months, not exceeding 18 calendar months between tests. (Part 2.2)
OR
The Responsible Entity did not test the recovery plan according to Part 2.3 within 38 calendar months, not exceeding 39 calendar months between tests. (Part 2.3)
Severe
The Responsible Entity did not test the recovery plan(s) according to Part 2.1 within 18 calendar months between tests of the plan. (Part 2.1)
OR
The Responsible Entity did not test a representative sample of the information used in the recovery of Applicable System functionality according to Part 2.2 within 18 calendar months between tests. (Part 2.2)
OR
The Responsible Entity did not test the recovery plan(s) according to Part 2.3 within 39 calendar months between tests of the plan(s). (Part 2.3)
Applicability and Evidence Retention
CIP-009-7.1 applicability, exemptions, compliance monitoring, and evidence retention.
Referenced Publications
- CIP-009-7.1 official standard; PDF page(s) 6, 7, 11, 12. NERC original PDF.
- NERC standard status and dates (checked 2026-09-13).
- CIP-009-7.1 implementation plan. NERC original implementation plan.
Notes
- Assessment reference scope: the complete numbered requirement, associated parts and measures are kept together. Source wording is transcribed; line wrapping and presentation are normalized. The official PDF controls if a discrepancy is found.
- Table columns are presented as labeled subsections for each part so applicability, requirements, and measures remain associated.
- Publicly available does not mean public domain. This is an internal reference, not an NERC publication or endorsement.
- Legacy SCF relationships refer to the 2024 versioned mapping set; no cross-version equivalence is asserted.