NIST SP 800-53r5 — CP-07(01) Separation from Primary Site
source: false
type: canonical-control-reference
standard: NIST SP 800-53r5
assessment_standard: NIST SP 800-53Ar5
baseline_standard: NIST SP 800-53B
control_id: "CP-07(01)"
family_id: "CP"
family: "Contingency Planning"
title: "Separation from Primary Site"
status: active
updated: 2026-09-10
authoritative_sources:
- "NIST SP 800-53r5 verified transcription"
- "NIST SP 800-53Ar5 verified transcription"
- "NIST SP 800-53B verified transcription"
baseline_membership:
low: false
moderate: true
high: true
privacy: false
related_controls:
- "RA-03"
CP-07(01) Separation from Primary Site
Canonical combined reference
Control text and discussion come from NIST SP 800-53r5; assessment procedures come from NIST SP 800-53Ar5; baseline membership comes from NIST SP 800-53B.
NIST SP 800-53r5 — Control
Identify an alternate processing site that is sufficiently separated from the primary processing site to reduce susceptibility to the same threats.
Discussion
Threats that affect alternate processing sites are defined in organizational assessments of risk and include natural disasters, structural failures, hostile attacks, and errors of omission or commission. Organizations determine what is considered a sufficient degree of separation between primary and alternate processing sites based on the types of threats that are of concern. For threats such as hostile attacks, the degree of separation between sites is less relevant.
Related Controls
Supporting Publications
- None specified.
NIST SP 800-53Ar5 — Assessment Procedure
Assessment Objective
Determine if:
-
CP-07(01)— an alternate processing site that is sufficiently separated from the primary processing site to reduce susceptibility to the same threats is identified.
Potential Assessment Methods and Objects
Examine
Select from:
- Contingency planning policy.
- procedures addressing alternate processing sites.
- contingency plan.
- alternate processing site.
- alternate processing site agreements.
- primary processing site agreements.
- system security plan.
- other relevant documents or records.
Interview
Select from:
- Organizational personnel with contingency plan alternate processing site responsibilities.
- organizational personnel with system recovery responsibilities.
- organizational personnel with information security responsibilities.
References
Source Assessment Procedure — NIST SP 800-53Ar5
NIST SP 800-53B — Baseline Membership
| Baseline | Membership |
|---|---|
| Low | Not included |
| Moderate | Included |
| High | Included |
| Privacy | Not included |