CMMC 2.0 — CM.L2-3.4.3 System Change Management
source: false
type: canonical-control-reference
standard: CMMC 2.0
document_version: "2.13"
level: 2
practice_id: "CM.L2-3.4.3"
family_id: "CM"
family: "Configuration Management"
title: "System Change Management"
status: active
scoring_method: weighted-deduction
point_value: 1
assessment_reevaluation: conditional
assessment_poam_eligible: true
deferred_documentation: "re-evaluation-only"
updated: 2026-09-10
authoritative_sources:
- "CMMC Level 2 Assessment Guide v2.13 transcription"
- "CMMC Level 2 Assessment Guide v2.13 PDF"
- "CMMC Assessment Process (CAP), Version 2.0"
- "32 CFR Part 170 CMMC Program Final Rule"
CM.L2-3.4.3 System Change Management
Canonical CMMC 2.0 reference
Complete practice guidance comes from the official CMMC Level 2 Assessment Guide, Version 2.13.
CMMC 2.0 — Practice
Track, review, approve or disapprove, and log changes to organizational systems.
Assessment Scoring and Correction
- Point value: 1-point deduction when the requirement is NOT MET.
- In-assessment correction / re-evaluation: Conditionally permitted for a NOT MET requirement during the assessment and for 10 business days following the active assessment period. Additional evidence must demonstrate MET, must not change or limit another requirement already scored MET, and must be submitted before delivery of the Assessment Findings Report.
- Assessment POA&M: Conditionally eligible if the assessment score is at least 80 percent and all other § 170.21 conditions are satisfied; closeout is required within 180 days.
- Deferred documentation: The current CAP does not define a separate deferred-documentation finding. Draft, unofficial, or unapproved documentation is unacceptable evidence; a corrected deficiency is handled through the re-evaluation procedure above.
Sources: CAP v2.0, § 2.15; 32 CFR Part 170, §§ 170.17(c)(2), 170.21, and 170.24.
Assessment Objectives — NIST SP 800-171A1
Determine if:
-
[a]— changes to the system are tracked;
-
[b]— changes to the system are reviewed;
-
[c]— changes to the system are approved or disapproved; and
-
[d]— changes to the system are logged.
Potential Assessment Methods and Objects — NIST SP 800-171A1
Examine
Select from:
- Configuration management policy
- procedures addressing system configuration change control
- configuration management plan
- system architecture and configuration documentation
- system security plan
- change control records
- system audit logs and records
- change control audit and review reports
- agenda/minutes from configuration change control oversight meetings
- other relevant documents or records
Interview
Select from:
- Personnel with configuration change control responsibilities
- personnel with information security responsibilities
- system or network administrators
- members of change control board or similar
Test
Select from:
- Organizational processes for configuration change control
- mechanisms that implement configuration change control
Discussion — NIST SP 800-171r22
Tracking, reviewing, approving/disapproving, and logging changes is called configuration change control. Configuration change control for organizational systems involves the systematic proposal, justification, implementation, testing, review, and disposition of changes to the systems, including system upgrades and modifications. Configuration change control includes changes to baseline configurations for components and configuration items of systems, changes to configuration settings for information technology products (e.g., operating systems, applications, firewalls, routers, and mobile devices), unscheduled and unauthorized changes, and changes to remediate vulnerabilities.
Processes for managing configuration changes to systems include Configuration Control Boards or Change Advisory Boards that review and approve proposed changes to systems. For new development systems or systems undergoing major upgrades, organizations consider including representatives from development organizations on the Configuration Control Boards or Change Advisory Boards. Audit logs of changes include activities before and after changes are made to organizational systems and the activities required to implement such changes. NIST SP 800-128 provides guidance on configuration change control.
Further Discussion
You must track, review, and approve configuration changes before committing to production. Changes to computing environments can create unintended and unforeseen issues that can affect the security and availability of the systems, including those that process CUI. Relevant experts and stakeholders must review and approve proposed changes. They should discuss potential impacts before the organization puts the changes in place. Relevant items include changes to the physical environment and to the systems hosted within it.
Example
Once a month, the management and technical team leads join a change control board meeting. During this meeting, everyone reviews all proposed changes to the environment [b,c]. This includes changes to the physical and computing environments. The meeting ensures that relevant subject-matter experts review changes and propose alternatives where needed.
Potential Assessment Considerations
- Are changes to the system authorized by company management and documented
[a,b,c,d]? - Are changes documented and tracked (e.g., manually written down or included in a tracking service such as a ticketing system)
[d]?
Key References
Source References
- CMMC Level 2 Assessment Guide, Version 2.13
- CMMC Level 2 Scoping Guide, Version 2.13
- CMMC Model Overview, Version 2.13
Referenced Publications
1 NIST SP 800-171A, Assessing Security Requirements for Controlled Unclassified Information.
2 NIST SP 800-171 Revision 2, Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations.