NIST SP 800-53r5 — PE-23 Facility Location
source: false
type: canonical-control-reference
standard: NIST SP 800-53r5
assessment_standard: NIST SP 800-53Ar5
baseline_standard: NIST SP 800-53B
control_id: "PE-23"
family_id: "PE"
family: "Physical and Environmental Protection"
title: "Facility Location"
status: active
updated: 2026-09-10
authoritative_sources:
- "NIST SP 800-53r5 verified transcription"
- "NIST SP 800-53Ar5 verified transcription"
- "NIST SP 800-53B verified transcription"
baseline_membership:
low: false
moderate: false
high: false
privacy: false
related_controls:
- "CP-02"
- "PE-18"
- "PE-19"
- "PM-08"
- "PM-09"
- "RA-03"
PE-23 Facility Location
Canonical combined reference
Control text and discussion come from NIST SP 800-53r5; assessment procedures come from NIST SP 800-53Ar5; baseline membership comes from NIST SP 800-53B.
NIST SP 800-53r5 — Control
- a. Plan the location or site of the facility where the system resides considering physical and environmental hazards; and
- b. For existing facilities, consider the physical and environmental hazards in the organizational risk management strategy.
Discussion
Physical and environmental hazards include floods, fires, tornadoes, earthquakes, hurricanes, terrorism, vandalism, an electromagnetic pulse, electrical interference, and other forms of incoming electromagnetic radiation. The location of system components within the facility is addressed in NIST SP 800-53r5 PE-18.
Related Controls
Supporting Publications
- None specified.
NIST SP 800-53Ar5 — Assessment Procedure
Assessment Objective
Determine if:
-
PE-23a.— the location or site of the facility where the system resides is planned considering physical and environmental hazards; -
PE-23b.— for existing facilities, physical and environmental hazards are considered in the organizational risk management strategy.
Potential Assessment Methods and Objects
Examine
Select from:
- Physical and environmental protection policy.
- physical site planning documents.
- organizational assessment of risk.
- contingency plan.
- risk mitigation strategy documentation.
- system security plan.
- other relevant documents or records.
Interview
Select from:
- Organizational personnel with site selection responsibilities for the facility housing the system.
- organizational personnel with risk mitigation responsibilities.
- organizational personnel with information security responsibilities.
Test
Select from:
- Organizational processes for site planning.
References
Source Assessment Procedure — NIST SP 800-53Ar5
NIST SP 800-53B — Baseline Membership
| Baseline | Membership |
|---|---|
| Low | Not included |
| Moderate | Not included |
| High | Not included |
| Privacy | Not included |