NIST SP 800-53r5 — CP-02(02) Capacity Planning
source: false
type: canonical-control-reference
standard: NIST SP 800-53r5
assessment_standard: NIST SP 800-53Ar5
baseline_standard: NIST SP 800-53B
control_id: "CP-02(02)"
family_id: "CP"
family: "Contingency Planning"
title: "Capacity Planning"
status: active
updated: 2026-09-10
authoritative_sources:
- "NIST SP 800-53r5 verified transcription"
- "NIST SP 800-53Ar5 verified transcription"
- "NIST SP 800-53B verified transcription"
baseline_membership:
low: false
moderate: false
high: true
privacy: false
related_controls:
- "PE-11"
- "PE-12"
- "PE-13"
- "PE-14"
- "PE-18"
- "SC-05"
CP-02(02) Capacity Planning
Canonical combined reference
Control text and discussion come from NIST SP 800-53r5; assessment procedures come from NIST SP 800-53Ar5; baseline membership comes from NIST SP 800-53B.
NIST SP 800-53r5 — Control
Conduct capacity planning so that necessary capacity for information processing, telecommunications, and environmental support exists during contingency operations.
Discussion
Capacity planning is needed because different threats can result in a reduction of the available processing, telecommunications, and support services intended to support essential mission and business functions. Organizations anticipate degraded operations during contingency operations and factor the degradation into capacity planning. For capacity planning, environmental support refers to any environmental factor for which the organization determines that it needs to provide support in a contingency situation, even if in a degraded state. Such determinations are based on an organizational assessment of risk, system categorization (impact level), and organizational risk tolerance.
Related Controls
Supporting Publications
- None specified.
NIST SP 800-53Ar5 — Assessment Procedure
Assessment Objective
Determine if:
-
CP-02(02)[01]— capacity planning is conducted so that the necessary capacity exists during contingency operations for information processing; -
CP-02(02)[02]— capacity planning is conducted so that the necessary capacity exists during contingency operations for telecommunications; -
CP-02(02)[03]— capacity planning is conducted so that the necessary capacity exists during contingency operations for environmental support.
Potential Assessment Methods and Objects
Examine
Select from:
- Contingency planning policy.
- procedures addressing contingency operations for the system.
- contingency plan.
- capacity planning documents.
- system security plan.
- other relevant documents or records.
Interview
Select from:
- Organizational personnel with contingency planning and plan implementation responsibilities.
- organizational personnel responsible for capacity planning.
- organizational personnel with information security responsibilities.
References
Source Assessment Procedure — NIST SP 800-53Ar5
NIST SP 800-53B — Baseline Membership
| Baseline | Membership |
|---|---|
| Low | Not included |
| Moderate | Not included |
| High | Included |
| Privacy | Not included |