Open in TheBrain

WASSA MINE

Operations at a Glance

Operation NameWassa Gold Mine
Parent and ownership percentageGolden Star Resources (90%) / Government of Ghana (10%)
Country of operationGhana
Commodity being minedGold
P&P Mineral Reserves1.09 million ounces

Average grade of P&P Mineral

Reserves

Underground 10.8 Mt at 3.1 g/t Au

Stockpile 0.7 Mt at 0.62 g/t Au

M&I Mineral Resources29.3 Mt at 3.8 g/t Au for 3.5 Moz contained
Remaining reserve life of mine6 years
Geological settingQuartz carbonate veins with pyrite
Underground mining methodSub-level longhole open stoping
Processing methodCarbon-in-leach
Processing plant capacity2.7Mtpa
2020 Production
Gold produced (oz)168koz

About Wassa

Wassa is located in south-western Ghana. Golden Star commenced production from the surface operation at Wassa in 2005 and commercial production was achieved at Wassa Underground on January 1, 2017. In early 2018 Wassa transitioned into an underground-focused operation. Thanks to the scale of the historical open pit mining operation the processing plant has significant excess capacity and is currently only running at 70-80% (based on 2020 actuals) utilization. Development of the large inferred mineral resource which comprises the southern Extension zone, was the subject of a Preliminary Economic Assessment which was included in the March 2021 Technical Report. Given the scale of the resource at Wassa, the Company is exploring the potential to increase the mining rate in order to fill the mill.

Wassa Underground has exploration upside through extension drilling of B Shoot North, step out drilling on B Shoot South, step out drilling on the 242 Trend and the extension of the F Shoot. This work is expected to increase the mine life of Wassa Underground in the short, medium and long term.

For further information about Wassa’s Mineral Reserves and Mineral Resources, click here:

Reserves and Resources

WASSA TECHNICAL REPORT

(NI 43-101)

Click Here for the March 2021 Technical Report

WASSA PLANS AND SECTIONS

December 2018 Drill Sections

September 2018 Drill Sections

April 2018 Drill Sections

SITE VISIT PHOTOGRAPHS

Analyst & Investor Site Visit – Nov 2017

Supplemental Documents to Press Release Dated November 13, 2019

Figure 1: Wassa Underground: Isometric View Looking East Showing Significant Results

Figure 2: Wassa Underground: Cross Section 18875N Looking North Showing the Change of the Interpretation

Appendix A

Supplemental Docs for PR July 15