Open in TheBrain

VAN DYKE COPPER PROJECT

Van Dyke - Arizona, USA

Van Dyke Project:

CategoryTonnes (Mt)TCu (%)ASCu (%)CNCu (%)RecCu (%)Recovery (%)Soluble Cu (Mlb)Total Cu (Mlb)
Indicated97.60.330.230.040.2490517717
Inferred168.00.270.170.040.19906991,007

Cu=copper, Au=gold, Mo=molybdenum, Ag=silver, %=percent, gt=grams per tonne, Mt=millions of tonnes, Blb=billions of pounds, Mlb=millions of pounds, Moz=millions of ounces. Sue Bird, P.Eng., an employee of Moose Mountain Technical Services, is the QP. The effective date is January 9, 2020. The “reasonable prospects for eventual economic extraction: shape has been creased based on a a copper price of US$2,80/lb, employment of in-situ leach extraction methods, processing costs of US$0.60/lb Cu and all in operating and sustaning costs of US$1.25/tonne, a recovery of 90% for total soluble copper and an average Specific Gravity of 2.6t/m3. Approximate drill-hole spacings is 80m for Indicated Mineral Resources. The average dip of the deposit within the Indicated and Inferred Mineral Resource outlines is 20 degrees. Vertical thickness of the mineralized enverlope ranges from 40m to over 200m. Rounding as required by Best Practices established by the CIM reporting guidelines may result in slight apparant differences between tonnes, grade and contained metal content.

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.