Open in TheBrain

TROPICANA OPERATION JV

Tropicana comprises a series of open pits and an underground mine located 200km east of Sunrise Dam and 330km east-northeast of Kalgoorlie in Western Australia.

OWNERSHIP

70%

AngloGold Ashanti

WORKFORCE

608

including contractors

MINERAL RESOURCE

5.35Moz

of gold

GOLD PRODUCTION

298Koz

2019: 360Koz

ALL-IN SUSTAINING COSTS

$1,061/oz

2019: $757/oz

CONTRIBUTION TO GROUP PRODUCTION

10%

Tropicana is a joint venture between AngloGold Ashanti Australia Ltd (70%) which manages the mines, and Regis Resources Ltd (30%).

Open pit and underground mining is carried out by Macmahon under an alliance contract. Open pit mining uses conventional drill and blast and load and haul methods, while underground mining uses jumbo development and mechanised open stoping. Since start-up, ore has been sourced from the Tropicana, Havana, Havana South and Boston Shaker pits. From 2021-2023 the Boston Shaker pit will be the main source of open cut ore while a major cutback of the Havana pit is carried out. Open pit material will be supplemented by approximately 1.2 Mtpa of ore mined from the Boston Shaker underground mine, and stockpiles.

The Tropicana processing plant has achieved a throughput capacity of between 8-9 Mtpa following several upgrades, including the installation of a second ball mill. The processing plant comprises a three-stage crushing circuit, inclusive of energy-efficient high pressure grinding rolls, followed by conventional ball mill grinding and CIL recovery.

Tropicana’s infrastructure includes a gas-fired power station, sealed airstrip, workshops, two borefields, a tailings facility and a modern village complex.

A BRIEF HISTORY
FOR FURTHER INFORMATION

2WESTERNAUSTRALIADarwinBrisbaneSydneyMelbourneAdelaidePerthKalgoorlieCanberra11,000km0SUNRISE DAMTROPICANA