Open in TheBrain

DAVIDSON MOLYBDENUM PROJECT

Generation Mining Limited has an option to acquire a 100-per-cent interest in a large molybdenum property located near Smithers, B.C. A resource estimate was undertaken by independent consultants in 2016 for a previous optionee.

Total drilling on the property to date is 72,815 metres in 218 drill holes, dating back to the 1950s. Most of the drill core has been securely stored and is available to Generation. Giroux and Cuttle estimated the following measured and indicated resources (M&I) at a 0.20-per-cent- and 0.28-per-cent-molybdenum-disulphide cut-off:

Blast Hole Shrinkage Mining Method from Hatch 2008 Feasibility Study

The report recommends that a preliminary economic assessment be commissioned to determine the cost of producing molybdenum and tungsten from the Davidson property. Two cut-offs are highlighted based on two possible underground mining scenarios. A 0.20-per-cent-MoS2 cut-off might correspond to a bulk-mining approach with on-site processing facilities while a cut-off of 0.28 per cent MoS2 might reflect a more selective direct shipping alternative of hauling ore to another mill for processing.