Open in TheBrain

GEITA MINE

Geita, one of AngloGold Ashanti’s flagship mines, is located in north-western Tanzania, in the Lake Victoria goldfields of the Mwanza region, about 120km from Mwanza and 4km west of the town of Geita.

OWNERSHIP

100%

AngloGold Ashanti

WORKFORCE

5,496

including contractors

MINERAL RESOURCE

7.92Moz

of gold

GOLD PRODUCTION

623Koz

2019: 604Koz

ALL-IN SUSTAINING COSTS

$814/oz

2019: $894/oz

CONTRIBUTION TO GROUP PRODUCTION

20%

Geita Gold Mine (GGM) is wholly owned by AngloGold Ashanti and sources ore from Nyankanga open pit and

from two underground mines (Star and Comet as well as Nyankanga) in 2020.

Geita has an established 5.2Mtpa CIL processing plant capable of processing hard ore. It also has an established tailings storage facility. A full workshop facility is in place to support the maintenance of heavy mining equipment and all light support equipment. Additional support infrastructure includes a mine village, medical clinic, mine store, administration buildings and airstrip.

The underground mining method used at Geita is a combination of Longitudinal Open Stoping (LOS) and Transverse Open Stoping (TOS).

A BRIEF HISTORY
FOR FURTHER INFORMATION

TANZANIAArushaTaboraTangaDodomaKigomaLakeTanganyikaMwanzaLakeVictoriaDar-es-Salaam1GEITA200km0

ESG STATISTICS 2020

ALL INJURY FREQUENCY RATE

0.00 per million hours worked

(2019: 0.08)

COMMUNITY INVESTMENT

$4,778m

(2019: $5,851m)

PAYMENTS TO GOVERNMENT

$326.1m

(2019: 190m)

REPORTABLE ENVIRONMENTAL INCIDENTS

0 (2019: 0)

WATER USE

3,165ML

(2019: 3,229ML)

WATER USE EFFICIENCY

0.58KL/t

(2019: 0.62KL/t)

ENERGY CONSUMPTION

3.34PJ

(2019: 3.69PJ)

ENERGY USE INTENSITY

0.62GJ/t

(2019: 0.71GJ/t)

GHG EMISSIONS

227kt

(2019: 251kt)

GHG EMISSION INTENSITY

42kg/t CO2e

(2019: 48kg/t CO2e)

CYANIDE USE

1,768t

(2019: 1,632t)

REHABILITATION LIABILITIES

$70.5m

(2019: 68.1m)