JOE MANN PROPERTY
| Location | 60 km south of Chibougamau, QC |
|---|---|
| Ownership | Option to earn 100% interest |
| History | Past producing underground mine: 1.2 M oz at 8.26 g/t Au 0.25% Cu, from 1956 to 2007 |
| Commodities | Gold and Copper |
| Current Status | Advanced exploration |
| Mineral Resources 2021 | Inferred: 608,000 tonnes @ 6.78 g/t Au and 0.24% Cu, containing 133,000 contained ounces of gold |
OVERVIEW
Dore Copper signed an option agreement in January 2020 to acquire a 100% interest in the Joe Mann gold mine located 60 km south from the Company’s Copper Rand mill and 60 km south of Chibougamau, Québec.
The Joe Mann mine operated in three phases for 27 years, between 1956 and 2007, and produced 1.2 million ounces of gold at a grade of 8.26 g/t Au, 607,000 ounces of silver at a grade of 5 g/t Ag, and 28.7 million pounds of copper at a grade of 0.25% Cu.
In late 2020, Dore Copper completed 8,343 metres of drilling on the Joe Mann property. The results confirmed the high-grade downdip extension of the West Zone and the continuity of the Main Zone below the underground workings of the Joe Mann mine, and highlighted the high-grade potential of the Far West Zone.
The Corporation is proceeding with an evaluation to dewater the mine which would give access to the lower level of the mine to efficiently drill the depth extension of both the Main and West Zones.
The Corporation reported a NI 43-101 mineral resource estimate on July 28, 2021 and is expected to complete a Preliminary Economic Assessment (PEA) in late 2021 to support an eventual hub-and-spoke restart of the camp with Corner Bay as the main feed and Joe Mann as a secondary feed to its 100% owned Copper Rand 2,700 tpd mill.
HISTORY
RECENT & CURRENT EXPLORATION
GEOLOGY & MINERALIZATION

