The Bigstone copper-zinc deposit, in the southern part of the Bigstone property, holds great potential to serve as additional feed for a central mill based at McIlvenna Bay. Foran released the first NI43-101 Resource Estimate for Bigstone on December 7, 2020.

Bigstone is accessible via helicopter, boat or winter road. Winter road access is 103 km from Flin Flon along Saskatchewan Provincial Highway 106 and 17 km south on a winter access trail. The Bigstone deposit lies approximately 25 kilometres west of Foran’s McIlvenna Bay deposit and is accessible in winter from Foran's Hanson Lake exploration camp via a 51 km gravel road, highway 106 and winter roads.

The mining town of Flin Flon (population. 5,600), is the largest commercial/residential centre in the area and a railhead on the Hudson Bay railway. The Flin Flon airport has regular commercial air service to Winnipeg.

Foran released the first NI43-101 Resource Estimate for Bigstone on December 7, 2020.

Foran owns a 100% interest in the Bigstone Property. Some of the claims that make up the property are subject to a 2% NSR.

The electromagnetic conductor associated with the Bigstone deposit was first identified by a 1963 Selco airborne geophysical survey. The Bigstone deposit was subsequently discovered by drilling in 1982 by a Granges Inc./SMDC (Cameco) joint venture. The Granges/SMDC (Cameco) JV continued exporation at the Bigstone deposit and on regional targets elsewhere on the property until 1994. Several historic mineral resources have been prepared for the Bigstone deposit; the most recent was prepared by Cameco in 1990 (see below for the historic mineral resource and important disclosures).

In 1995, Granges Inc. interest in the JV was purchased by Aur Resources Ltd. Aur operated several exploration programs on the property until 2002 when the project was shelved.

In 2003, Foran purchased Aur Resources interest in the project. Foran commissioned a high-resolution VTEM Time Domain Electromagnetic ("EM") survey over portions of the property in 2007. In 2011 Foran completed additional VTEM surveying over ground not covered by the 2007 survey. The two datasets were then merged and interpreted by an independent geophysical consultant to identify exploration targets.

Early in 2012, Foran purchased Cameco's remaining interest in the project, becoming 100% owner and subsequently in the spring of 2012, Foran drilled four holes (1,176 metres) to test three north-south oriented VTEM conductor trends in the northern part of the property, in an area known as the Freeport Zone. For additional information on this drilling see the Foran news release dated July 9, 2012.

In 2014, Foran conducted a ground-based EM geophysical survey over the Bigstone deposit area to better resolve the conductor associated with the historic deposit and other nearby conductors.

In winter 2015, Foran conducted infill drilling on the Bigstone deposit ^1. For additional information on this drilling see below and the Foran news release dated May 20, 2015.

Foran's winter 2015 program at Bigstone included six infill diamond drill holes (2,545m) into the historic Bigstone resource ^1. The program tested the central parts of the deposit at depths of 200 to 350m below surface.

The Bigstone historic resource is a vertically oriented, flattened, cylindrical shaped body, in part drill tested between 100 and 700m below surface.

Highlights from the winter 2015 Drill program include:

True thickness is interpreted to be approximately 50-60% of drill indicated. For additional information see the Foran news release dated May 20, 2015.

Mineral Resources

In 1990, Cameco outlined an historic mineral resource ^*^ at the Bigstone deposit with an estimated 3.75Mt grading 2.03% Cu and 0.33 g/t Au at a 1% Cu cutoff in the Main Zone and an estimated 0.53Mt grading 9.62% Zn and 15.9 g/t Ag at a 5% Zn cutoff in the Zinc-rich Massive Sulphides.

Bigstone deposit Main Zone historic resource estimate sensitivity analysis1

Cu cut-off (%Cu)TonnageCu (%)Zn (%)Au (g/t)Ag (g/t)

1.0

1.5

2.0

2.5

3,747,500

3,136,600

1,983,600

1,199,300

2.03

2.26

2.57

3.11

0.14

0.15

0.17

0.20

0.33

0.36

0.48

0.61

9.3

9.9

11.3

13.5

Bigstone deposit Massive Sulphide Zone historic resource estimate sensitivity analysis1

Zn cut-off (%Zn)TonnageCu (%)Zn (%)Au (g/t)Ag (g/t)

2.0

3.0

4.0

5.0

755,200

692,600

611,500

525,300

0.20

0.21

0.21

0.24

7.75

8.22

8.87

9.62

0.27

0.28

0.30

0.34

11.7

12.6

13.9

15.9

1Foran is not treating the historic estimate as current; a Qualified Person within the meaning of National Instrument 43-101 has not completed sufficient work to classify the historic estimates as current; additional work, including re-surveying, re-logging and drill core QA/QC would be required to verify and upgrade the historic estimate to current.

Metallurgy

On November 17, 2015 Foran released the results of positive initial metallurgical testwork for Bigstone.

Testwork was conducted on composite drill core samples (quartered HQ core) from each of the three main styles of mineralization at Bigstone, namely the Main Zone (Copper), Main Zone (Zinc) and Massive Sulphides (Zinc). The Main Zone (Copper) is the most significant of the three styles of mineralization. The program was designed to test the recovery characteristics of the three composites utilizing conventional flotation methods followed by locked cycle tests to produce copper and zinc concentrates. All styles of mineralization produced high-grade concentrates with good recoveries.

Highlights included:

Overall Metallurgical Response

Main Zone (Copper)Main Zone (Copper)Main Zone (Copper)Main Zone (Copper)Main Zone (Copper)Main Zone (Copper)Main Zone (Copper)Main Zone (Copper)Main Zone (Copper)Main Zone (Copper)
ProductMassConcentrate GradeRecoveryRecoveryRecoveryRecoveryRecoveryRecoveryRecovery
CuZnAgAuCuZnAgAu
(%)(%)(%)(g/t)(g/t)(%)(%)(%)(%)
Feed1001.850.1090.21100100100100
Copper Concentrate5.929.20.591181.893358252
Main Zone (Zinc)Main Zone (Zinc)Main Zone (Zinc)Main Zone (Zinc)Main Zone (Zinc)Main Zone (Zinc)Main Zone (Zinc)Main Zone (Zinc)Main Zone (Zinc)Main Zone (Zinc)
ProductMassConcentrate GradeRecoveryRecoveryRecoveryRecoveryRecoveryRecoveryRecovery
CuZnAgAuCuZnAgAu
(%)(%)(%)(g/t)(g/t)(%)(%)(%)(%)
Feed1000.705.2260.16100100100100
Copper Concentrate1.029.42.322387.74303848
Zinc Concentrate8.53.0655.3240.3237903217
Massive Sulphides (Zinc)Massive Sulphides (Zinc)Massive Sulphides (Zinc)Massive Sulphides (Zinc)Massive Sulphides (Zinc)Massive Sulphides (Zinc)Massive Sulphides (Zinc)Massive Sulphides (Zinc)Massive Sulphides (Zinc)Massive Sulphides (Zinc)
ProductMassConcentrate GradeRecoveryRecoveryRecoveryRecoveryRecoveryRecoveryRecovery
CuZnAgAuCuZnAgAu
(%)(%)(%)(g/t)(g/t)(%)(%)(%)(%)
Feed1000.2410.11080.29100100100100
Zinc Concentrate16.80.9954.14711.170907365

Bond Work Indices

CompositeBond Rod Mill Grindability TestBond Ball Mill Grindability TestAbrasion
Work Index (kWh/tonne)Work Index (kWh/tonne)(g)
Main Zone (Copper)15.913.50.494
Main Zone (Zinc)14.912.50.481
Massive Sulphides (Zinc)14.211.10.381

A total of 560 kilograms of material was shipped to Base Metallurgical Laboratories Ltd. (“Base Met Labs”) in Kamloops, B.C. for processing. The nominal primary grind size was 100µm K80, with target regrind sizes for the concentrates of 30 to 40µm K80.

Main Zone (Copper)

The Main Zone (Copper) composite was dominated by copper mineralization with very little zinc. Flotation testing focused on production of a gold- and silver-bearing copper concentrate. Optimization of the process was limited to testing various primary grind sizes, collector types and the effect of regrind sizes. Flotation response was very robust, allowing for the use of low-cost collectors (xanthate) and simple pH modulation of the flotation circuit to control pyrite and other unwanted sulphides.

Main Zone (Zinc)

The Main Zone (Zinc) feed had copper and zinc concentrations that required production of separate concentrates. The copper concentration in the feed was considerably lower than the zinc. Limited optimization was conducted on this sample, focused on controlling zinc recovery to the copper concentrate and producing high grade zinc concentrates.

The initial results were very encouraging, demonstrating very good zinc flotation performance. The copper circuit produced a high-grade copper concentrate, with lower recoveries. This style of mineralization would benefit from further optimization testing focusing reagent and regrind optimization in the copper and zinc.

Massive Sulphides (Zinc)

The Massive Sulphide (Zinc) composite had a high zinc concentration, with relatively low levels of copper; the sample contained abundant iron sulphides.

Flotation testing was focused on production of only a zinc concentrate from this mineralization. Batch testing investigated the effect of regrind on the rougher concentrate and effect of elevated pH in the cleaner circuit. The test results indicated that elevated pH levels and the use of more selective collectors were beneficial (Dithiophosphates), resulting in the production of higher grade zinc concentrates.

Bond Work Indices

Bond rod mill work index determinations for the composites ranged from 14.2 kWh/tonne to 15.9 kWh/tonne, with an average of 15.0 kWh/tonne. Bond ball mill work index determinations for the composites ranged from 11.1 kWh/tonne to 13.5 kWh/tonne, with an average of 12.4 kWh/tonne. Based on these results the mineralization would be considered to have a moderate hardness from a rod and ball milling perspective.