Open in TheBrain

PENOLES PROJECT

OVERVIEW

COMMODITY:

Gold, SilverLOCATION:

Durango, MexicoSIZE:

22.9 km²

The Peñoles Project includes an oxide gold prospect (referred to as El Capitan) and two historic silver mines (Jesus Maria and San Rafael) located in the historic Peñoles Mining District of Durango, Mexico. The Peñoles Project is host to multiple mineralized vein systems, fault zone structures, poly-metallic skarns, and silicified low-temperature gold-rich volcaniclastics. Approximately 86 diamond drill holes totalling more than 11,550 metres have now been completed at the Project. Drilling to date on the Peñoles property has defined wide intervals of near-surface gold mineralization (with low silver values) at El Capitan that could potentially be amenable to open-pit extraction methods and significant intervals of near-surface silver mineralization (with associated gold, lead and zinc values) at Jesus Maria zone.

EXPLORATION HISTORY

According to published historic records, Minera Industrias Peñoles was incorporated in 1887 to operate the Jesus Maria and San Rafael silver mines and took its name from the local community of Peñoles. The full extent of the historic mine workings is unknown, but mining appears to have been selective and limited to within approximately 100 metres from the surface. The only modern exploration work that was completed on the property prior to 2011 consisted of a four-hole drill program completed by Aurcana Corporation (“Aurcana”) in 2004, and surface mapping, sampling, a limited IP survey, and a five-hole drill program completed by Riverside in 2008 and 2009. The drill holes completed by Aurcana and Riverside returned encouraging results and showed that El Capitan had potential to host a bulk-tonnage, low-grade gold deposit. Preliminary metallurgical tests completed by Sierra Madre in 2011 using Riverside drill core indicated that the gold mineralization at El Capitan could likely be recovered using cyanide leaching. Since March 2011, exploration work and drilling funded by Riverside’s partner has primarily focused on the El Capitan Gold Zone and the Jesus Maria Silver Zone.

PREVIOUS WORK: EXPLORATION RESULTS

The Peñoles project has an established (305k oz Au at 0.46 g/t & 15M oz Ag at 62 g/t Ag) inferred resource (see NI 43-101 report below), which remains open in multiple directions and at depth. Previous work includes drilling, underground sampling and trenching at the El Capitan gold zone and the historic Jesus Maria silver mine discovered high-grade Ag

El Capitan Gold Zone

Jesus Maria Zone (Silver & Gold)

GEOLOGY

The Peñoles property lies in the Altiplano Sub province of the Sierra Madre Occidental (SMO). The SMO is a regionally extensive Eocene to Miocene volcanic field that extends from the US-Mexican border into Central Mexico. The Altiplano sub province is on the eastern flank of the SMO and comprises Jurassic to late Tertiary sedimentary and volcanic rocks (Sedlock et al., 1993). This district hosts extensive hydrothermal-related silver, gold and base-metal deposits and is generally referred to as the Faja de Plata, or Mexican Silver Belt.

The El Capitan deposit, the Jesus Maria deposit, and the San Rafael-El Tubo prospects of the Peñoles Project are located on the concessions owned by Riverside and they appear to be related to intersections between the northwest-striking and northeast-striking regional structures. These occurrences are also localized along the southern margins of a northeast-oriented magnetic anomaly identified from government airborne surveys.

RESOURCE

NI 43-101 TECHNICAL REPORT

During the 2011 and 2012 campaign at El Capitan drilling encountered numerous intervals of gold mineralization ranging from 50 m to 140 m in length. Mineralization appears localized along the unconformity between Tertiary-age volcaniclastic rocks and Cretaceous-age sediments. The upper part of the mineralized zone consists of porous, volcanic agglomerate cut by narrow quartz veinlets and hydrothermal breccias (averaging 0.2 g/t to 0.5 g/t Au). At the base of the volcanic unit, there is a shallow-dipping, 10 m to 35 m wide silicified zone (averaging 0.7 g/t to 1.5 g/t Au), and, below this zone, there is a sequence of oxidized shales that is also cut by quartz veinlets and hydrothermal breccias (averaging 0.2 g/t to 0.6 g/t Au) with low silver values.

The Jesus Maria prospect was initially considered to be a relatively narrow but high-grade vein-type target; however, drilling carried out in 2013 and 2014 encountered 20 m to 80 m wide intervals of predominantly silver-rich mineralization (with accessory gold and base-metal values). Based on the widths of mineralization, the Jesus Maria might be amenable to open-pit extraction methods. At their eastern limits, the deposits are separated by approximately 300 m; however, the mineralized zones are interpreted as merging to the west. Additional drilling between the western limit of the Jesus Maria deposit and the El Capitan deposit could connect the two zones and delineate additional mineralization.

The Mineral Resource statement for the El Capitan and Jesus Maria deposits is shown in Table 1.1; the resources are not constrained within pit shells but include mineralization, above cut-off, that is within a maximum depth of 150 m below surface. There are no adjustments for recovery or dilution in the statement of mineral resources. It is important to note that these are estimates of mineral resources, not mineral reserves, as the economic viability has not been demonstrated.

Table 1.1: Inferred Mineral Resource Estimate

DepositktonnesGold (g/t)Silver (g/t)Contained Gold (koz)Contained Silver (koz)
El Capitan20,7220.4582.83051,832
Jesus Maria7,5730.10562.32615,158
Combined28,2950.36418.733116,990

To date 86 holes have been drilled in the property.

2020/2021 DRILL PROGRAM

November 2020 - The first seven drill holes from the current and on-going 6,000 metre reverse circulation (RC) drill program at the Peñoles Project is complete. This initial drill campaign is focused on testing the continuity of known gold-silver zones at the Capitan Hill Deposit, both along strike and down-dip of the March 2015, 43-101 compliant, inferred resource outline, as well as infill significant gaps within the resource model. The first seven drill holes of the program are presented herein, all of which intersected Capitan Hill style mineralization that is consistent in grade and width with previous drilling.

Spring-Summer 2021 exploration program

Capitan completed its initial 6,000-metre drill program in early 2021 and began a second stage of drilling in the spring that will continue through the summer working on expanding mineralization in the Capitan gold zone. The Company expects to drill approximately 6,000 metres of reverse-circulation drilling during this period as well as to continue surface exploration work on additional targets within the Peñoles project in order to advance them towards a drill stage.

Drill Highlights:

Overview of the Fall/Winter 2021 Drill Program

2020-2021 Drill Hole Map at Capitan Hill Target

Expansion Drilling, Capitan Main Zone

RC holes 20-CARC-01, 03, and 05 located on sections 100, 400, and 250 respectively, tested the continuity of the gold-silver mineralization down dip of the 2015 Inferred Resource.

All of the RC drill holes above successfully intersected the Capitan Hill Main Zone, with results being consistent with the grade and width of the previous drilling. These new holes extended the Capitan Hill Main gold-silver mineralization down-dip between 50 to 120 m. Drill results include 76.2 m of 0.41 g/t gold in hole 20-CARC-05, 68.58 m of 0.4 g/t gold in hole 20-CARC-03 and 51 m of 0.439 g/t gold in hole 20-CARC-01. Click here for link to cross-sections.

RC Hole 20-CARC-01, located on section 100, collared near the eastern edge of the Capitan Hill Main Zone. The hole was mineralized through its entire length starting from surface and was ended in mineralization. This hole extended the Capitan Hill Main Zone by 120 m down dip from previous drilling.

In addition to intersecting the Capitan Hill Main Zone, RC holes 20-CARC-05 and 20-CARC-03, also cut significant values of silver mineralization, expanding the continuity of silver mineralization at depth. Silver values in RC hole 20-CARC-05 include 60.96 m of 25.15 g/t silver that includes a higher-grade zone of 33.5 m of 33.67 g/t silver.

All of the expansion holes were oxidized through their entire length, with RC holes 20-CARC-01 and 03 getting into sulphide mineralization at drill hole depths of 173.7 m and 184.4 m respectively.

_Infill Drilling, Capitan Main Zone_

Infill drilling in the current program was designed to confirm the presence of the Capitan Hill Main zone in areas where significant gaps (75-100 m ) existed in the 2015 Inferred Resource model. All holes presented below successfully confirmed the presence of the Capitan Hill Main Zone.

RC hole 20-CARC-06 was drilled on section 250 and was designed to test a roughly 100-metre wide gap between previously drilled diamond drill holes CDDH-12-10 and CDDH-08-02. Hole 20-CARC-06 intersected the main Capitan Hill Zone from 35.1 m to 146 m, with a total drilled width of 111.25 m grading 0.342 g/t gold, including 45.7 m of 0.626 g/t gold. (See Drill Table below)

RC Hole 20-CARC-07 was drilled on section 300, between previously drilled diamond drill holes CDDH-08-05 and CDDH-12-12 to infill a large >100 m wide gap. The hole cut the main mineralized zone in three, narrowly separated, intercepts that are bound by anomalous gold mineralization. These include 22.9 m of 0.2 g/t gold, 35.1 m of 0.27 g/t gold and 50.3 m of 0.22 g/t gold. The hole bottomed in anomalous mineralization and could not be drilled to its completed depth due to technical issues.

RC Hole 20-CARC-02 was drilled on section 000 and designed to test a >100 m wide gap between CDDH-12-17 and surface. The hole successfully intersected the Capitan Hill Main Zone and confirmed its presence up-dip, to surface, and was mineralized almost over its entire length. Significant values include 0.284 g/t gold over 29 m and 56.4 m of 0.398 g/t gold.

_New, Near Surface Hanging Wall Gold Zones_

Drilling prior to the March 2015 resource statement at Capitan Hill indicated the possibility of additional zones of oxidized, gold-silver mineralization located in the hanging wall to the Capitan Hill Main Zone. However, due to a lack of drilling, the significance of these zones was poorly understood and precluded from being captured in the March 2015 resource estimate.

In the current program, RC holes 20-CARC-03, 05 and 07 confirmed the presence and continuity of these "Hanging Wall Zones", highlighting the potential to enhance the existing resource. The most significant results include 30.5 m of 0.22 g/t gold starting from surface in RC hole 20-CARC-03; 22.9 m of 0.199 g/t gold in RC hole 20-CARC-07, and 35.05 m of 0.15 g/t gold in RC hole 20-CARC-05.

_Drill Results Discussion_

Drill hole 20-CARC-12 was a step-out hole designed to test the down-dip extension of the main Capitan Hill Zone, as well as test for Hanging Wallmineralization, which was absent in hole CDDH-11-06 located immediately up-dip. The hole was successful in confirming the presence of up to five, > 10 m wide, mineralized zones in the Hanging Wall, starting from surface, with the best interval returning 22.9 m of 0.20 g/t gold, which has extended the zone down-plunge 100 m to the south-east from section 200 (see Figure 2).

Additionally, hole 20-CARC-12 successfully intersected the main Capitan Hill zone as expected, reporting an interval of 73.2 m grading 0.63g/t Aueq including a higher grade interval of 36.6 m of 0.91 g/t Aueq in oxides, which indicates a new higher grade block which may be developing in this area. This new interval extended the main Capitan Hill Zone down-dip approximately 65 m from hole CDDH-11-06.

Hole 20-CARC-09 was an infill hole that was designed to test a gap between two historic drillholes, both of which were terminated in the Capitan Main zone. The hole successfully confirmed the presence of the Capitan Hill Zone, as well as extending the zone approximately 12.5 m to depth, compared to where the historic holes had ended, reporting an interval of 64 m grading 0.69 g/t Aueq, with a higher grade interval of 13.5 m grading 1.26 g/t Aueq. The hole also intersected the Hanging Wall zone between 25 to 65 m, but only sporadic, low grade values were returned.

Hole 20-CARC-08 was designed to test an approximate 100 m wide gap in the Capitan Main zone between surface and historic hole CDDH-12-15. The hole was successful in intersecting the up-dip projection of the Capitan main zone, returning an interval of 48.8 m grading 0.58 g/t Aueq.

Note: All intervals reported above are oxidized with the exception of a 12.2 m wide sulfide intercept in the Capitan Hill zone starting from 179.8 m depth.

Table 1. Table of drill results

20-CARC-16 20-CARC-16

Hole NameAzimuthDipSectionZoneFrom (m)To (m)Interval (m)Aueq (g/t) (80:1)Au (ppm)Ag (ppm)OX-SUL
20-CARC-01
Interval2870°100Capitan Main010.710.70.110.11NSVOX
IntervalCapitan Main22.941.118.30.120.12NSVOX
IntervalCapitan Main45.76418.30.20.2NSVOX
IntervalCapitan Main70.197.527.40.250.25NSVOX
IntervalCapitan Main100.6115.815.20.140.14NSVOX
IntervalCapitan Main121.9173.751.80.460.441.64OX
IncludingCapitan Main135.6173.738.10.570.552.01OX
IntervalCapitan Main173.7201.227.40.310.282.13SUL
20-CARC-02
Interval2840°0Capitan Main042.742.70.250.25NSVOX
IntervalCapitan Main50.379.2290.280.28NSVOX
IntervalCapitan Main83.8140.256.40.410.40.81OX
IncludingCapitan Main112.8138.725.90.550.531.56OX
IntervalCapitan Main144.816015.20.30.281.62OX
20-CARC-03
Interval2850°400Hanging Wall030.530.50.220.22NSVOX
IntervalHanging Wall59.467.17.60.120.12NSVOX
IntervalHanging Wall77.783.86.10.120.12NSVOX
IntervalHanging Wall97.5102.14.60.150.140.93OX
IntervalCapitan Main115.8184.468.60.540.411.01OX
IncludingCapitan Main117.3134.116.80.940.7415.88OX
IntervalCapitan Main184.41894.60.180.143.73SUL
IntervalCapitan Main202.7207.34.60.130.111.57SUL
20-CARC-04
Interval2860°400Hanging Wall010.710.70.140.130.3OX
IntervalCapitan Main16.822.96.10.160.160.31OX
IntervalCapitan Main30.568.638.10.360.341.78OX
20-CARC-05
Interval090°250Hanging Wall0330.130.13NSVOX
IntervalHanging Wall15.218.330.130.13NSVOX
IntervalHanging Wall47.282.335.10.150.15NSVOX
IntervalCapitan Main135.6138.730.260.250.73OX
IntervalCapitan Main149.4225.676.20.680.4121.02OX
IncludingCapitan Main167.6184.416.81.040.6828.49OX
20-CARC-06
Interval2870°250Hanging Wall18.32910.70.240.24NSVOX
IntervalCapitan Main35.1146.3111.30.360.341.69OX
IncludingCapitan Main89.9135.645.70.660.632.88OX
20-CARC-07
Interval20875°300Hanging Wall6.133.527.40.110.11NSVOX
IntervalHanging Wall67.170.130.190.19NSVOX
IntervalCapitan Main91.4114.322.90.220.21.35OX
IntervalCapitan Main120.4155.435.10.330.275.2OX
IntervalCapitan Main160210.350.30.280.224.83OX
20-CARC-08
Interval2860°300Capitan Main2977.748.80.580.571.03OX
includingCapitan Main47.276.2290.820.81.44OX
20-CARC-09
Interval2860°450Capitan Main79.2143.3640.690.589.37OX
includingCapitan Main94.5138.744.20.860.7210.81OX
add includingCapitan Main118.9132.613.71.261.0418.24OX
20-CARC-10
Interval2870°0Hanging Wall36.6100.6640.270.260.39OX
IntervalHanging Wall105.2150.945.70.310.30.61OX
includingHanging Wall144.8149.44.61.411.391.7OX
IntervalCapitan Main166.1213.447.20.240.22.62
includingCapitan Main166.1181.415.20.190.170.89OX
and includingCapitan Main181.4213.4320.260.223.44SUL
20-CARC-11
Interval2850°100Hanging Wall53.36410.70.170.17NSVOX
IntervalHanging Wall73.2102.1290.150.15NSVOX
IntervalHanging Wall112.812512.20.180.18NSVOX
IntervalHanging Wall135.6147.812.20.210.21NSVOX
IntervalHanging Wall163.1172.29.10.340.34NSVOX
IntervalCapitan Main192249.957.90.940.884.15
includingCapitan Main192231.639.61.211.154.38OX
and includingCapitan Main196.6225.6291.541.484.96OX
and includingCapitan Main196.6214.918.32.041.994.12OX
and includingCapitan Main231.6249.918.30.350.313.67SUL
20-CARC-012
Interval2880°150Hanging Wall013.713.70.120.12NSV**OX
IntervalHanging Wall21.333.512.20.150.15NSVOX
IntervalHanging Wall39.650.310.70.110.11NSVOX
IntervalHanging Wall65.577.712.20.20.2NSVOX
IntervalHanging Wall83.8106.722.90.20.2NSVOX
IntervalCapitan Main143.3216.473.20.630.556.53
IncludingCapitan Main143.3179.836.60.910.836.65OX
and includingCapitan Main179.819212.20.450.43.78SUL
and includingCapitan Main192216.424.40.30.27.74OX
20-CARC-13
Interval36090°500Capitan Main85.3185.9100.60.420.328.15
includingCapitan Main131.1152.421.30.670.5211.67OX
and includingCapitan Main182.9185.930.230.174.7SUL
20-CARC-14
Interval1560°-100Hanging Wall30.550.319.80.130.13NSVOX
IntervalCapitan Main94.5120.425.90.360.314.41
includingCapitan Main108.2120.412.20.480.368.84SUL
20-CARC-15
Interval2865°-300Hanging Wall21.3297.60.160.16NSVOX
IntervalHanging Wall50.36110.70.180.18NSVOX
IntervalHanging Wall108.2121.913.70.190.19NSVOX
IntervalHanging Wall128166.138.10.180.18NSVOX
IntervalCapitan Main204.222116.80.240.221.83OX
20-CARC-16
Interval2870°150Hanging Wall68.6120.451.80.180.18NSVOX
IntervalCapitan Main185.9249.9640.590.57.12OX
includingCapitan Main201.2227.125.90.870.778.22OX
and includingCapitan Main208.8222.513.71.020.936.83OX
and includingCapitan Main233.2245.412.20.660.5111.64OX
20-CARC-17
Interval2850°000Hanging Wall42.76421.30.250.25NSVOX
IntervalHanging Wall68.683.815.20.250.25NSVOX
IntervalHanging Wall93135.642.70.170.17NSVOX
IntervalHanging Wall173.7208.835.10.330.311.43OX
IntervalCapitan Main213.4248.435.10.260.213.99SUL
21-CARC-18
Interval2865°200Hanging Wall15.227.412.20.220.22NSVOX
IntervalHanging Wall48.874.725.90.170.17NSVOX
IntervalHanging Wall82.3102.119.80.30.3NSVOX
21-CARC-19
Interval2865°-550Capitan Main129.5163.133.50.40.326.1OX
21-CARC-20
Interval2855°-650Hanging Wall39.657.918.30.140.14NSVOX
IntervalCapitan Main109.7126.516.80.260.241.22OX
21-CARC-21
Interval2860°400Hanging Wall56.477.721.30.190.19NSVOX
IntervalHanging Wall117.3123.46.10.210.21NSVOX
IntervalHanging Wall141.7152.410.70.160.16NSVOX
21-CARC-22
Interval2350°500Hanging Wall89.9103.613.70.140.14NSVOX
IntervalHanging Wall108.2123.415.20.120.12NSVOX
IntervalHanging Wall138.7147.89.10.110.11NSVOX
21-CARC-23
Interval2860°-50Hanging Wall41.147.26.10.260.26NSVOX
IntervalHanging Wall51.865.513.70.290.29NSVOX
IntervalHanging Wall68.685.316.80.130.13NSVOX
IntervalHanging Wall89.912838.10.160.16NSVOX
21-CARC-24
Interval2850°-400Hanging Wall10.725.915.20.160.16NSVOX
IntervalCapitan Main182.9225.642.70.340.238.82OX
includingCapitan Main196.6207.310.70.560.4112.01OX
21-CARC-25
Interval2850°100Hanging Wall36.654.918.30.140.14NSVOX
IntervalHanging Wall59.465.56.10.140.14NSVOX
IntervalHanging Wall82.394.512.20.210.21NSVOX
IntervalHanging Wall141.7167.625.90.190.19NSVOX
IntervalCapitan Main204.2234.730.50.240.211.93
includingCapitan Main227.1234.77.60.220.173.9SUL
21-CARC-26
Interval2863°-250Hanging Wall7.6118.9111.30.170.160.25OX
IntervalHanging Wall125149.424.40.150.140.58OX
IntervalHanging Wall157170.713.70.170.142.38OX
IntervalHanging Wall187.5196.69.10.30.281.77OX
IntervalCapitan Main208.8242.333.50.370.214.25
includingCapitan Main225.6242.316.80.370.1715.66MIX
21-CARC-27
Interval36090°000Hanging Wall35.168.633.50.20.2NSVOX
IntervalHanging Wall91.4118.927.40.180.18NSVOX
IntervalHanging Wall129.5175.345.70.210.21NSVOX
IntervalCapitan Main195.1213.418.30.190.190.51OX
IntervalCapitan Main224262.138.10.170.170.69OX
IntervalCapitan Main271.3289.618.30.230.211.34SUL
21-CARC-28
Interval2875°300Hanging Wall76.286.910.70.130.13NSVOX
IntervalHanging Wall137.2182.945.70.150.15NSVOX
IntervalHanging Wall208.8217.99.10.170.170.34OX
21-CARC-30
Interval36090°-550Capitan Main132.6138.76.10.340.285.1OX
IntervalCapitan Main182.91929.10.20.154.35MIX
IntervalCapitan Main198.1204.26.10.160.141.95MIX
IntervalCapitan Main216.4227.110.70.150.113.3MIX
IntervalCapitan Main234.7243.89.10.210.155.02SUL
21-CARC-31
Interval36090°-100Hanging Wall76.2102.125.90.20.2NSVOX
IntervalCapitan Main109.7297.2187.50.240.231.23MIX
includingCapitan Main236.2265.2290.550.512.78OX
includingCapitan Main278.9297.218.30.20.181.62SUL
21-CARC-32
Interval2850-450Hanging Wall137.2143.36.10.280.261.39OX
IntervalHanging Wall189199.610.70.30.253.81OX
IntervalCapitan Main225.6266.741.10.310.245.39OX
21-CARC-33
Interval2860-200Hanging Wall79.2117.338.10.260.26NSVOX
IntervalCapitan Main163.1219.556.40.750.5813.78OX
includingCapitan Main179.8190.510.71.190.9916.07OX

QUALIFIED PERSON, QA/QC & TECHNICAL DISCLOSURES

The scientific and technical data contained in this news release pertaining to the Peñoles Project was reviewed and approved by Marc Idziszek, P.Geo, a non-independent qualified person to Capitan Mining, who is responsible for ensuring that the technical information provided in this news release is accurate and who acts as a “qualified person” under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

Capitan Mining Inc. has a Quality Assurance/Quality Control program that includes insertion and verification of control samples including standard reference material, blanks and duplicates consistent with industry standards.

2021 DRILL PROGRAM FIGURES