LANGIS MINE PROJECT
The Langis Mine (past producer of high-grade silver) Project is located near Cobalt in eastern Ontario, 15 km north of Temiskaming Shores and 500 km north of Toronto. Highway 65 runs through the property and many established secondary roads provide year-round access. Power, railways, mills, a permitted refinery, and assay lab are located at or near the site.
Brixton Metals is exploring for cobalt, silver, and other semi-precious and precious metals on blocks of contiguous mining patents and mining claims covering parts of two townships in the historic Cobalt Mining Camp: Casey and Harris townships
The Langis Project represents a unique opportunity in a silver district that is underexplored using modern techniques. New discovery potential is high, and a strong possibility exists to generate mineral resources from extensions to historical workings and new exploration.
Project
- Two past producing, high-grade silver-cobalt mines in the Cobalt Camp, located 500km from
Toronto, Ontario, Canada
- A brownfields exploration and development opportunityfor high-grade silver-cobalt and +- copper, +-nickel, +-gold
- LANGIS MINEpast production (1908-1989) of 10.4 Moz Ag at 25 optand 358,340 lbs of cobalt.
(Closed in 1990 due to a silver price drop to $5/oz.)
- HUDSON BAY MINEpast production (1905-1953) of 6.4 Moz Ag at 123 optand 185,570 lbs cobalt from 52,032 tons
- Silver-cobalt recoveries ranged from 88% to 98%. (Assays up to 18% Ag and 16% cobalt)
- Excellent local infrastructure: year-round road access, power, railway and mills
- Brixton signed an Exploration Agreement with the local First Nations in 2016
- Currently drilling towards maiden NI-43 101 resource
Why Silver and Cobalt?
- There is an increased demand for silver and cobalt in the electric vehicleindustry, .
- 60 million oz of Ag are projected to be used by the automotive industry in 2021. Each battery electric vehicle uses approximately 25-50g of silver.
- Approximately 4.5kg of cobaltis used in a Tesla Model S car
- Electrical and electronicsare the biggest consumer of silver, forecast to use approximately 510 million oz Agin 2021
- The photovoltaics (PV) industry is estimated to consume 105 million oz Agin 2021.
- Jewelry is one of silver’s biggest demand sectors, using over 170 million oz Agper year
- 17% of cobalt consumption is for superalloys, used in space vehicles, aircraft engine parts, and nuclear reactors
COBALT CONSUMPTION
>50% for Li-Ion batteries
(electronics, storage and vehicle use)
140ktonnesCobalt produced in 2020
978.1 Moz Silver produced in 2020
Regional Geology
- The Cobalt Mining District has produced over 600 Million oz Silver and 28 Million lbs Cobalt*
- The steeply-dipping, Archean mafic volcanic rocks are overlain unconformably by the flat-lying Proterozoic Cobalt Group sediments, cut by the Nipissing diabase sills. These three units are host to the Ag-Co-Ni mineralizing system.
Brixton's Drilling Highlights
- 2016, LM-16-03 intercepted 4.1m of 4.9 g/t Au, 397 g/t Ag, including 0.22m of 74.9 g/t Au , 5,236.4 g/t Ag.
- 2018, drilling hit new high grade silver-cobalt mineralization:
- LM18-42 intersected 6.00m of 4,719.33 g/t silver and 0.33 percent cobalt
- LM18-45 intersected 3.00m of 1.23 percent cobalt, 43.97 g/t silver
- 2020, LM-20-133 cut 2m of 5,847 g/t Ag from 16.6m, including 1.2m of 11,663 g/t (375 oz/t) Ag, 0.71% Co
- including 9m of 272 g/t Ag from 23.6m including 1m of 1,500 g/t Ag, 0.26% Co
- 2021 (best Intercepts will change with new assay), drilling hit new and expanded past high grade silver-cobalt mineralization:
- LM-21-219 drilled 31m of 272 g/t Silver, 0.05% Cobalt from 117.8m depth
- Including 8m 860 g/t Silver, 0.17% Cobalt
- Including 4m of 1186 g/t Silver, 0.28% Cobalt
- LM-21-236 drilled 2m of 47 g/t Silver, 0.86% Cobalt from 115.8m
- Including 1m of 78 g/t Silver, 1.69% Cobalt
- LM-21-219 drilled 31m of 272 g/t Silver, 0.05% Cobalt from 117.8m depth
Structure
Alteration
Mineralization
Langis Geology
Langis Geophysics
Hudson Geology
Property History


Langis Drilling
Plan View
Cross Section Looking N
Shaft #3 Looking NW
Shaft #4 Looking NW
Shaft #6 Looking NW
Regional Silver Camp History
The camp has historically produced over 420 Moz of silver. One reported mine workings from the Cobalt Camp reached 255,146 g/t Ag (or 9,000 oz/t Ag) over 0.36 metres. This single stope at the 30 m level on this vein produced 4.5 Moz Ag.
The “Camp History” photo shows some headframes established within the Cobalt mining camp (photo source: Cobalt Mining Museum). While today most of the mine sites have been reclaimed or are under ongoing reclamation.
Silver was discovered at Cobalt in 1903 during the construction of the Timiskaming and Northern Ontario Railway from North Bay to develop the agricultural land in the New Liskeard area. Fred LaRose, a blacksmith employed in the construction of the railway, is credited with the first discovery, but the first application for claims, filed on August 13, 1903, was made by J.H. McKinley and E.F. Darragh, subcontractors who supplied ties for the railroad. They found silver-bearing float at the south end of Cobalt Lake. The first assay results showed bismuth but no silver. McKinley subsequently sent the ore for assay to McGill University, and was informed by Dr. Milton Hersey of Montreal that the ore contained 4,000 ounces of silver per ton. Dr. Willet G. Miller, Ontario’s first provincial geologist, visited the area in November 1903 and found that four veins had been located, three very rich in silver. In addition, Tom Hebert had staked the property that later became the Nipissing Mine. Dr. Miller reported the news through an article in the Mining Journal of New York and through an Ontario Bureau of Mines publication. The final discovery in 1903 was made by Neil King who staked the property on which the O’Brien mine was to rise in 1906 and to continue production without a break until 1966 (Zoldy, 2006).
Project News Releases
6 May at 4:25 pm
Brixton Metals Drills 24m of 187 g/t Silver, including 10m of 356 g/t Ag, including 2m of 1077 Ag at its Langis Project, Ontario
24 Mar at 6:05 am
Brixton Metals Drills 8m of 860 g/t Silver, 0.17% Cobalt within 31m of 272 g/t Ag, 0.05% Co at its Langis Project, Ontario
10 Mar at 5:57 am
Brixton Metals Drills 2m of 1898 g/t Silver and 5m of 547 g/t Silver at its Langis Project, Ontario
1 Feb at 7:16 am
Brixton Metals Drills 375 oz/t (11,663 g/t) Silver, 0.7% Cobalt over 1.2m at its Langis Project, Ontario
8 Jan at 5:45 am
Brixton Metals Drills 4m of 370 g/t Ag including 1m of 1080 g/t Ag (34 opt Ag) at its Langis Project, Ontario Canada
8 Dec 2020
Brixton Metals Drills 3m of 647 g/t Ag including 1m of 1,845 g/t Ag at its Langis Project, Ontario, Canada
1 Oct 2020
Brixton Metals Samples 6,160 g/t Silver and 16.9% Cobalt from Surface at its Langis Project and Mobilizes Drill to Site
5 May 2020
Brixton Metals Drills 5.00m of 1,293 g/t Silver, Including 2.00m of 3,205 g/t Silver at Its Langis Project, Ontario
8 Jan 2019
Brixton Metals Provides Drilling Update on its Langis Project, Ontario, with More Cobalt and More Kimberlite
29 Nov 2018
Brixton Metals Drills Kimberlite in 10 of 11 Holes at its Langis Project and Announces Private Placement
14 Nov 2018
Brixton Metals Delineates a Gravity Anomaly and Begins Drilling the Kimberlite Discovery at its Langis Project, Ontario
22 Oct 2018
Brixton Metals Drills Multi-kilogram Silver and 1.9 Percent Cobalt at its Hudson Bay Project
17 Sep 2018
Brixton Metals Drills 6.00 metres of 4,719.33 g/t Silver and 0.33% Cobalt at Its Langis Project, Ontario
30 Aug 2018
Brixton Metals Discovers Diamond Bearing Kimberlite at its Langis Project, Ontario
30 May 2018
Brixton Metals Drills 3.55% Cobalt over 0.98m at Its Langis Project
9 May 2018
Brixton Metals Drills 1.98% Cobalt, 15,436.00 g/t Silver over 1.00m within 7.87m of 2,787.26 g/t Silver, 0.27% Cobalt and Intersected 70.65m of Nickel-Cobalt-Silver in Archean Basement
30 Apr 2018
Brixton Metals Drills 1.38% Cobalt, 63.00 g/t Silver over 2.00m
10 Apr 2018
Brixton Metals Drills 5.00m of 0.23% Cobalt, 2.10% Copper, 94.96 g/t Silver Including 2.00m of 0.72% Cobalt Equivalent
15 Mar 2018
Brixton Metals Drills 6.7m of 937.3 g/t AgEq and 3.0m of 0.25% CoEq at its Hudson Bay Project in the Cobalt Camp, Ontario
20 Feb 2018
Brixton Metals Drills 1% Cobalt, 0.95% Copper, 0.72% Nickel, 11.1 g/t Silver over 0.8 metres at its Hudson Bay Project in the Cobalt Camp, Ontario
29 Dec 2017
Brixton Metals Closes Second Tranche of Private Placement for Aggregate Proceeds of $3 Million for Drilling its Cobalt Projects
7 Dec 2017
Brixton Metals Closes $1.5M for Drilling Its Silver – Cobalt Project in Ontario
17 Aug 2017
Brixton Metals Samples 16% Cobalt and 182,065 g/t Silver at Langis and Provides An Update On Its Projects
25 Oct 2016
Brixton Metals Drills 1,084 g/t Ag over 2 metres at its Langis Project
30 Sep 2016
Brixton Metals Acquires Additional Lands at its Langis Property
11 Aug 2016
Brixton Metals Drills 1,944 g/t Ag over 3m and 4m of 4.9 g/t Au, 397 g/t Ag at its Langis Project
25 May 2016
Brixton Metals Adds Lands At Its LANGIS SILVER Project and Provides Corporate Update
2 Mar 2016
Brixton Metals Provides Preliminary Model of the Langis Silver Project
2 Feb 2016
Brixton Metals Closes Its Acquisition Of The Past Producer LANGIS SILVER Mine
30 Nov 2015
Brixton Metals to Acquire the Past-Producing Langis Silver Mine

Recent News
- Brixton Metals Updates Technical Report for its Thorn ProjectJuly 9, 2021
- Brixton Metals Summarizes 2020 results and plan outlines 2021 plansJune 3, 2021
- Brixton Metals Commences Drilling for Copper-Gold-Silver at its Thorn ProjectMay 26, 2021
- Brixton Metals Drills 24m of 187 g/t Silver, including 10m of 356 g/t Ag, including 2m of 1077 Ag at its Langis Project, OntarioMay 6, 2021
Contacts
Brixton Metals Corporation 409 Granville St., Suite 551 Vancouver, BC V6C 1T2 Canada







