GIYANI METALS CORP, K.HILL PROJECT

K.HILL PROJECT INVESTMENT HIGHLIGHTS

Manganese oxide deposit in a supportive mining investment jurisdiction

Robust project economics: 80% IRR and CAD442M NPV10

Low project capex of CAD159M*

*PEA April 2021

Low operating costs of USD583/t HPMSM

Feasibility Study due Q3 2021

Mining friendly jurisdiction

Experienced management and board with a track record of successful project delivery

Well positioned to leverage the growth in the battery electric vehicle market

OWNERSHIP

100% interest in an extensive land package covering 2,588km2 in south-eastern Botswana

PROJECT PIPELINE

3 battery-amenable manganese Prospects (K.Hill, Otse & Lobatse), as well as several additional targets, provides optionality for increasing the overall resource size and extending the project life

ROUTE TO MARKET

5 seaports accessible by rail and road with cost effective shipping to Asia, Europe and North America

INFRASTRUCTURE

The K.Hill Project is located near the 45,000-inhabitant town of Kanye, which hosts good rail and road connections, sufficient water supply, a 167-bed hospital and reliable power connectivity

JURISDICTION

Botswana is consistently rated as one of the most attractive African countries for supporting investment in mining, due to favourable tax regulations and efficient government processes

Only African country with investment grade credit rating. Established mining industry since independence in the 1960s. Very low levels of corruption - ranked 34 of 198 countries by transpency.org (highest in Africa)

K.HILL FLYOVER

PROJECT PEA (April 2021)

Net Present Value

CAD442M (USD332M)* after tax

CAD573M (USD431M)* pre tax

Internal Rate of Return80% after tax
Capex

CAD159M (USD118M)* Capex

CAD7M (USD5M)* closure cost

Cash CostsUSD583/t HPMSM Produced
Paybackwithin year 3
Project Life10 years
Planned Production Rate40 - 115kt per annum of High Purity Electrolytic Manganese Metal
Mining MethodOpen pit, free-digging mining (no blasting required)

TECHNICAL REPORTS

PROJECT MILESTONES ACHIEVED

Dec. 2017

Appointment of Mr. Robin Birchall as CEO & Director

Sep. 2018

Completion of K.Hill maiden Mineral Resource estimate; 1.1M tonnes at 31.2% MnO

Aug. 2019

Completed K.Hill PEA with NPV10 of C$379M & IRR of 90%

Dec. 2019

Commencement of K.Hill Feasibility Study & ESIA

Apr. 2020

Updated K.Hill PEA increasing resource & project economics to NPV10 of C$389M & IRR of 82%

Dec. 2020

Received approval for ESIA Scoping & Terms of Reference by DEA

Jan. 2021

Completed Solar Plant Study & Appointed Tetra Tech to design Demo Plant

Mar. 2021

Dec 2020 raised C$7.5M equity financing and in Mar 2021 raised C$11.5M in bought deal equity financing

Apr. 2021

Updated PEA 36% increase in MRE with 21% increase in NPV10 of C$442M & IRR of 80%