BURKINA FASO

1.9 MOZ

M&I RESOURCES

0.2 MOZ

P&P RESERVES

80-90 KOZ

PRODUCTION 2021 TARGET

$1,220-1,300 /OZ

AISC 2021 TARGET

Select

The Karma mine is a low-grade heap leach operation and consists of several gold deposits which are shallow, open pittable with little blasting required and a low strip ratio. In 2017, an optimization project was completed to lift the stacking capacity.

KEY FACTS

Ownership:

90% EDV, 10% Government of Burkina Faso

Production start date:

2016

Mining Method:

Open Pit/Contractor Mining

Processing Technology:

Heap Leach

Expected mine life:

2-3 years

Workforce:

Approximately 1,559