Open in TheBrain

ANDRADE COPPER PROJECT

Located in Rio Grande do Sul, the southernmost state of Brazil, Aguia’s Andrade Copper Project (Andrade) is a low capital expenditure (CAPEX) and lower operating expenditure (OPEX) metallic copper project that provides Aguia with a core copper project and fast track route into production. Aguia is aiming to have Andrade in production by Q4 2024.

PROJECT HIGHLIGHTS

18.03 MILLION TONNES

Indicated mineral resource of 18.03 million tonnes

JORC COMPLIANT

JORC Compliant

0.41% CU & 1.87 G/T AG

Average grade of 0.41% Cu and 1.87 g/t Ag

ASX Announcement

EXPANSION POTENTIAL

Resource upgrade with additional drilling

LICENSING

Simplified environmental licensing

HIGH SALES PRICE

Attractive sale price (A$10,900 per tonne)

MARCH 2020

DRILLING RESULTS

During March 2020, a diamond drilling program was completed that confirmed north and south extensions of the high-grade copper zone within the existing Andrade Mineral Resource area. Other than intercepting mineralisation, these results were encouraging as they further proved Aguia’s 3D modelling of a plunging high-grade zone to remain valid and correct.

Initial metallurgical test work is currently being undertaken to investigate the behaviour of the copper mineralisation to see if it is amenable to leaching. If so, there is confidence that Andrade could be a relatively low CAPEX, fast start-up copper sulphate heap leaching operation.