ROMANERA PROJECT
The Romanera deposit was drilled primarily by Minera Rio Tinto in the 1990’s and is reported to contain 34 million tonnes grading 0.42% copper, 2.20% lead, 2.3% zinc, 44.4g/t silver and 0.8g/t gold, within which there is a higher-grade resource of 11.21 million tonnes grading 0.40% copper, 2.47% lead, 5.50% zinc, 64.0 g/t silver and 1.0 g/t gold (The Volcanic Hosted Massive Sulphide Deposits of the Iberian Pyrite Belt, Garcia-Cortes ed., 2011). A qualified person, as defined by NI 43-101, has not done sufficient work on behalf of Emerita to classify the historical estimate reported above as current mineral resources or mineral reserves, as Emerita is not treating the historical estimate as such. The historical estimate should not be relied upon. The deposit extends from surface to approximately 350 metres depth on historical drilling. The mineralization remains open for further expansion down dip beyond the limits of the existing drilling.