SAN MARCIAL PROJECT
SAN MARCIAL PROJECT
San Marcial is a near-surface, high-grade silver-lead-zinc open pit-amenable project, which contains a 36 Moz AgEq (Indicated) and 11 Moz AgEq (Inferred) NI 43-101 resource estimate. The company recently completed over 320 m of underground development in the San Marcial Resource Area, from which underground drilling is planned to expand the high-grade portions of the resource down dip. The Company recently discovered additional mineralization in the footwall, outside of the existing resource, and will also be drilling this area. GR Silver Mining is the first company to conduct exploration at San Marcial in over 10 years. The NI 43-101 resource estimate (San Marcial Project – Resource Estimation and Technical Report) was completed by WSP Canada Inc. on March 18, 2019 and amended on June 10, 2020. Recent exploration has identified silver and gold mineralization in areas previously defined as nonmineralized, discovering evidence of pervasively altered rocks with intense silicification, veining and associated wide, silver and gold mineralized zones on the footwall of the NI 43-101 resource. Plomosas and San Marcial collectively represent a geological setting resembling the multimillionounce San Dimas Mining District which has historically produced more than 600 Moz silver and 11 Moz gold over a period of more than 100 years