BESCHEFER PROJECT
Project Snapshot
| Status: | Advanced exploration stage |
|---|---|
| Location: | 28 km southwest of Fenelon Gold project |
| Commodity: | Gold |
| Ownership: | 100% Wallbridge |
| Current exploration activities: | Review of project data for exploration targeting |
| Mineral resources: | None |
The Beschefer project covers 6.47 km2 and is located 28 kilometres southwest of the Fenelon Gold project. High-grade gold mineralization was intersected on the B-14 Zone by prior operators (1995, and 2011-13). This large-scale mineralized structure extends for 500 metres along strike and down-dip for 600 metres, along with the presence of additional known parallel mineralized shear zones.
Maps & Images (click to enlarge)

Regional Overview Geology
The last drilling program on the property was carried out by Wallbridge at the end of 2018 and consisted of 5 drill holes totaling 1,600 metres. The assay results were announced on March 13, 2019. Mineralization typical of gold-bearing portions of the B-14 shear zone was intersected in all 5 holes at the expected depths demonstrating the continuity of the mineralized system within the two high-grade shoots.
There are currently no plans for exploration work in 2020.