Open in TheBrain

CAUCHARI OLAROZ LITHIUM PROJECT

Caucharí-Olaroz is expected to start production in mid-2022 as the next low-cost brine project in Argentina

$641M Capex

Capital cost of $641M with 85% committed

$3,579/t

Cash costs per tonne for battery-grade lithium carbonate

Over 70%

Over 70% of capital cost spent on the 40,000 tpa lithium project in Argentina

40,000 tpa

Production of 40,000 tpa for 40 years

PROJECT SUMMARY

SUMMARY (40,000 TPA DFS, 100% BASIS, $ VALUES ARE IN USD)SUMMARY (40,000 TPA DFS, 100% BASIS, $ VALUES ARE IN USD)
LocationJujuy, Argentina
Ownership

44.8% LAC

46.7% Ganfeng Lithium

8.5% JEMSE

Project typeConventional brine
Annual production capacity40,000 tpa Li2CO3
Project life40 years
Project capital costs*$641 million
Operating costs$3,579/t Li2CO3
EBITDA (average)$308M

All economic results at $12,000/t of battery-grade lithium carbonate (Li2CO3)

See the technical report titled, “Updated Feasibility Study and Mineral Reserve Estimation to Support 40,000 tpa Lithium Carbonate Production at the Cauchari-Olaroz Salars, Jujuy Province, Argentina” (the Technical Report) dated effective September 30, 2020 and filed on SEDAR on October 19, 2020

* See the Company’s news release of May 6, 2021 for full details.

Franco Mignacco

Director, President of Minera Exar

_Read More [+]_

Cauchari-Olaroz is located in Jujuy Province in north-west Argentina. The Project is situated in the Salar de Olaroz and Salar de Cauchari, adjacent to Orocobre Ltd.’s Olaroz facility, which has been in production since 2015. Cauchari-Olaroz is well serviced by nearby infrastructure including major paved highways, a national and international rail link which connects to the port of Antofagasta in Chile, a high-voltage power grid, and a gas pipeline.