INDEPENDENCE PROJECT BC
Independence Project
On September 11, 2020, the Company acquired an option on the Independence Project. The geology of the 2,197 hectare property consists mostly of andesitic flows and tuffs of the Hazelton Group, crosscut by multiple diorite and granodiorite dikes, which are commonly associated with mineralized veins (within or beside dikes) and shear zones. The northwest-striking shear zones contain brecciated to laminated quartz-barite-magnetite-jasper veins +/- pyrite +/- chalcopyrite +/- pyrrhotite +/- sphalerite +/- galena. Assays of grab samples collected in 2019 from historic adit #1 returned values of up to 10.7 g/t Au, 85.30 g/t Ag, and 2.9% Cu.
During the 2020 field season, field work consisted of detailed mapping at historic trenches and adits to better determine controls on mineralization. During field work, the historic drill collar locations were confirmed and surveyed using a differential GPS; the historic logs will be used to develop a model of the mineralized system.