NERC CIP — CIP-014-4 R3 Risk Assessment Methodology
source: false
type: "canonical-control-reference"
standard: "NERC Critical Infrastructure Protection"
document_version: "CIP-014-4"
criterion_id: "CIP-014-4 R3"
family_id: "CIP-014-4"
family: "Physical Security"
title: "Risk Assessment Methodology"
status: "approved-future-enforcement"
assessment_criterion: true
normative_text_included: true
updated: "2026-09-13"
source_pdf: "Resources/CMMC Brain 2.1/Sources/NERC CIP/CIP-014-4.pdf"
source_pages: [2, 3, 11]
requirement_pages: [2, 3]
us_effective_date: "10/01/2028"
mapping_status: "not-transferred-from-2024-SCF-set"
CIP-014-4 R3 Risk Assessment Methodology
Version and enforcement
U.S. status checked 2026-09-13: Subject to Future Enforcement. Standard effective date: 10/01/2028. Jurisdiction-specific applicability and transitional obligations must be checked against the implementation plan.
Requirement
Each Transmission Owner shall have a documented risk assessment methodology for evaluating the loss of each applicable Transmission station or Transmission substation identified in Requirement R1. The methodology shall include, at a minimum, the following: [Violation Risk Factor: High; Time-Horizon: Long-term Planning]
-
3.1.Documented criteria for assessing instability, uncontrolled separation, or Cascading within an Interconnection. The criteria shall include, at a minimum, technically justified thresholds identifying unacceptable generation and load loss within an Interconnection.
-
3.2.A provision that steady-state and dynamic simulations shall each be performed using at a minimum one System peak Load case and one System Off-Peak Load case.
-
3.3.Specifications for simulations at each applicable Transmission station or Transmission substation identified in accordance with Requirement R1 and, if applicable, at each associated proximate existing BES Transmission station(s) and BES Transmission substation(s) identified in accordance with Requirement R2, that include:
- **`3.3.1.`** At the applicable Transmission station or Transmission substation:
- **`3.3.1.1.`** Prior loss of communication and Protection Systems;
- **`3.3.1.2.`** Application of a Fault or Faults; and
- **`3.3.1.3.`** Delayed (remote) clearing times shall be used unless otherwise technically substantiated.
- **`3.3.2.`** At each proximate existing BES station(s) and BES substation(s), as applicable:
- **`3.3.2.1.`** Application of a Fault or Faults, either simultaneous with or following the Fault or Faults applied under Part 3.3.1.2; and
- **`3.3.2.2.`** Normal clearing times shall be used unless otherwise technically substantiated.
- **`3.3.3.`** A documented justification for the Fault(s) associated with physical attack to be simulated. A single justification may be used for multiple locations. The justification shall include at a minimum:
- **`3.3.3.1.`** The type of credible high-severity physical attack considered; and
- **`3.3.3.2.`** The type of Fault(s) selected based upon the attack considered.
- **`3.3.4.`** Removal of all Elements that Protection Systems and other controls are expected to automatically disconnect.
- **`3.3.5.`** Actual or more conservative clearing times shall be used.
Assessment Measure
Each Transmission Owner shall provide dated evidence, such as electronic or hard copies, of a risk assessment methodology satisfying Requirement R3.
Violation Severity Levels
Lower
N/A
Moderate
The Transmission Owner has a risk assessment methodology that failed to include one of the requirements listed in Parts 3.1 through 3.3.
High
The Transmission Owner has a risk assessment methodology that failed to include two of the requirements listed in Parts 3.1 through 3.3.
Severe
The Transmission Owner has a risk assessment methodology that failed to include all three of the requirements listed in Parts 3.1 through 3.3. OR The Transmission Owner does not have a risk assessment methodology.
Applicability and Evidence Retention
CIP-014-4 applicability, exemptions, compliance monitoring, and evidence retention. Integral attachment(s): CIP-014-4 R1 attachments.
Referenced Publications
- CIP-014-4 official standard; PDF page(s) 2, 3, 11. NERC original PDF.
- NERC standard status and dates (checked 2026-09-13).
- CIP-014-4 implementation plan. NERC original implementation plan.
Notes
- Assessment reference scope: the complete numbered requirement, associated parts and measures are kept together. Source wording is transcribed; line wrapping and presentation are normalized. The official PDF controls if a discrepancy is found.
- Table columns are presented as labeled subsections for each part so applicability, requirements, and measures remain associated.
- Publicly available does not mean public domain. This is an internal reference, not an NERC publication or endorsement.
- Legacy SCF relationships refer to the 2024 versioned mapping set; no cross-version equivalence is asserted.