NERC CIP — CIP-014-4 R1 Applicability Identification
source: false
type: "canonical-control-reference"
standard: "NERC Critical Infrastructure Protection"
document_version: "CIP-014-4"
criterion_id: "CIP-014-4 R1"
family_id: "CIP-014-4"
family: "Physical Security"
title: "Applicability Identification"
status: "approved-future-enforcement"
assessment_criterion: true
normative_text_included: true
updated: "2026-09-13"
source_pdf: "Resources/CMMC Brain 2.1/Sources/NERC CIP/CIP-014-4.pdf"
source_pages: [2, 10, 20]
requirement_pages: [2]
us_effective_date: "10/01/2028"
mapping_status: "not-transferred-from-2024-SCF-set"
CIP-014-4 R1 Applicability Identification
Version and enforcement
U.S. status checked 2026-09-13: Subject to Future Enforcement. Standard effective date: 10/01/2028. Jurisdiction-specific applicability and transitional obligations must be checked against the implementation plan.
Requirement
Each Transmission Owner shall, at least once every 36 calendar months, identify each applicable Transmission station and Transmission substation meeting any of the criteria in Attachment 1 that is either existing or planned to be in service within 36 calendar months. [Violation Risk Factor: High; Time-Horizon: Long-term Planning]
Assessment Measure
Examples of evidence may include, but are not limited to, dated written or electronic documentation of the Transmission station(s) and Transmission substation(s) (existing and those planned to be in service within 36 calendar months) that meet any of the criteria in Attachment 1.
Attachment 1 — Required Criteria
Attachment 1 – Applicability Criteria
Applicable Transmission station(s) or Transmission substation(s) are those that meet any of the following criteria:
-
1.Transmission Facilities operated at 500 kV or higher. For the purpose of this criterion, the collector bus for a generation plant is not considered a Transmission Facility, but is part of the generation interconnection Facility.
-
2.Transmission Facilities that are operating between 200 kV and 499 kV at a single station or substation, where the station or substation is connected at 200 kV or higher voltages to three or more other Transmission stations or substations and has an "aggregate weighted value" exceeding 3,000 according to the table below. The "aggregate weighted value" for a single station or substation is determined by summing the "weight value per line" shown in the table below for each incoming and each outgoing BES Transmission Line that is connected to another Transmission station or substation. For the purpose of this criterion, the collector bus for a generation plant is not considered a Transmission Facility, but is part of the generation interconnection Facility.
| Voltage Value of a Line | Weight Value per Line |
|---|---|
| less than 200 kV (not applicable) | (not applicable) |
| 200 kV to 299 kV | 700 |
| 300 kV to 499 kV | 1,300 |
| 500 kV and above | N/A |
-
3.Transmission Facilities at a single station or substation location that are identified by their Reliability Coordinator, Planning Coordinator, or Transmission Planner as critical to the derivation of Interconnection Reliability Operating Limits (IROLs) and their associated contingencies.
-
4.Transmission Facilities identified as essential to meeting Nuclear Plant Interface Requirements (NPIRs).
Violation Severity Levels
Lower
The Transmission Owner identified each applicable Transmission station(s) and Transmission substation(s) per Attachment 1, but did so after 36 calendar months, but less than or equal to 38 calendar months. OR The Transmission Owner identified each applicable Transmission station(s) and Transmission substation(s), but failed to identify less than or equal to 10% of the applicable Transmission station(s) and Transmission substation(s) per Attachment 1.
Moderate
The Transmission Owner identified each applicable Transmission station(s) and Transmission substation(s) per Attachment 1, but did so after 38 calendar months, but less than or equal to 40 calendar months. OR The Transmission Owner identified each applicable Transmission station(s) and Transmission substation(s), but failed to identify more than 10% and less than or equal to 20% of the applicable Transmission station(s) and Transmission substation(s) per Attachment 1.
High
The Transmission Owner identified each applicable Transmission station(s) and Transmission substation(s) per Attachment 1, but did so after 40 calendar months, but less than or equal to 42 calendar months. OR The Transmission Owner identified each applicable Transmission station(s) and Transmission substation(s), but failed to identify more than 20% and less than or equal to 30% of the applicable Transmission station(s) and Transmission substation(s) per Attachment 1.
Severe
The Transmission Owner failed to identify each applicable Transmission station(s) and Transmission substation(s) per Attachment 1. OR The Transmission Owner identified each applicable Transmission station(s) and Transmission substation(s) per Attachment 1, but did so after more than 42 calendar months. OR The Transmission Owner identified each applicable Transmission station(s) and Transmission substation(s), but failed to identify more than 30% of the applicable Transmission station(s) and Transmission substation(s) per Attachment 1.
Applicability and Evidence Retention
CIP-014-4 applicability, exemptions, compliance monitoring, and evidence retention.
Referenced Publications
- CIP-014-4 official standard; PDF page(s) 2, 10, 20. NERC original PDF.
- NERC standard status and dates (checked 2026-09-13).
- CIP-014-4 implementation plan. NERC original implementation plan.
Notes
- Assessment reference scope: the complete numbered requirement, associated parts and measures are kept together. Source wording is transcribed; line wrapping and presentation are normalized. The official PDF controls if a discrepancy is found.
- Table columns are presented as labeled subsections for each part so applicability, requirements, and measures remain associated.
- Publicly available does not mean public domain. This is an internal reference, not an NERC publication or endorsement.
- Legacy SCF relationships refer to the 2024 versioned mapping set; no cross-version equivalence is asserted.